Permit Information
Permit NumberBLD06-01170
StatusFinaled
Name HEINZ DEVELOPMENT
Site Address 10815 W FRANKLIN RD
Project NameSantara Place Condominiums
Customer Number 
ePlanReviewNo
Description
Building A * To construct a new 8,191 square feet, 5 unit, two story, condominium building. Each unit is two story, three bedroom and two and one-half with an attached two car garage. There is one type "A" unit at 740 square feet on the second floor, 520 square feet on the first floor and 415 square feet for the garage. There are three type "B" units, each unit is 674 square feet on the second floor, 521 square feet on the first floor and 425 square feet for the garage. There is one type "C" unit at 720 square feet on the second floor, 521 square feet on the first floor and 415 square feet for the garage. NOTE: This building is requried to be fire sprinklered with a NFPA 13-R fire sprinkler system minimum. All construction per the approved plans and attached comment list. MJP CUP 04-00101 DRH05-00402.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice BLD9/22/20089/22/20089/25/2008 DONE
DetailsCathy Brown
First Notice has not been responded to.
First Notice 9/5/20089/22/2008 DONE
BLD-Final9/4/20089/5/20089/5/2008PPASS
DetailsJim Sly
mike Phone #: ###-####
OK for Perm Occ.
Permanent Occupancy  9/5/2008 DONE
FIRE-Final Inspection9/3/20089/4/20089/4/2008PPASS
DetailsTroy Cobbley
All corrections were made per Troys last inspection. KR
FIRE-Final Inspection9/3/20089/3/20089/3/2008PFAIL
DetailsTroy Cobbley
Provide fire dept. access signage, fire extinguishers and the knox box as discussed.
Code Occupancy Approval9/3/20089/3/20089/3/2008PPASS
DetailsScott M.Brown
ALL IN AS REQUIRED FOR BUILDING 1, BACK YARD TREES NEEDED FOR BUILDING 2. FINAL SIGNED OFF
BLD-Final7/28/20087/29/20087/29/2008ANR
DetailsJim Sly
mike heinz Phone #: ###-####
BLD-Energy code compliance2/5/20082/6/20082/6/2008PPASS
DetailsJim Sly
mike Phone #: ###-####
BLD-Framing/Rough-in2/4/20082/5/20082/5/2008PPASS
DetailsJim Sly
mike Phone #: ###-####
BLD-Framing/Rough-in2/1/20082/1/20082/1/2008PPART
DetailsJim Sly
mike Phone #: ###-####
Consult.
BLD-Foundation11/6/200711/6/200711/6/2007PPASS
DetailsJim Sly
clint Phone #: ###-####
BLD-Foundation11/2/200711/5/200711/5/2007APART
DetailsJim Sly
clint Phone #: ###-####
East 1/2 of Bldg Wall OK
BLD-Footing11/1/200711/2/200711/2/2007APART
DetailsMike Jordan
clint Phone #: ###-####wip, still tying verts, left message with structural engineer regarding design strength on concrete. Noted to contractor if he wanted to proceed witjout testing, the contractor accepts all responsibilities.
BLD-Aging Inspection10/12/200710/12/200710/19/2007 PASS
DetailsJim Sly
WIP.
Issue PAID IN FULL permit  7/13/2007 DONE
Ready Permit EXTENDED  5/23/2007 DONE
Rita A. DeYoung
Office Coordinator
Planning & Development Services
###-####
rdeyoung@cityofboise.org

>>> JENIFER GILLILAND 5/23/2007 9:47 AM >>>
Yes, I talked to them and gave them two more weeks to take out permits.

>>> June Bolus 5/23/2007 9:25 AM >>>
Jenifer,

Before you leave today-Rita wanted to know - did you get to speak to the Heinz Dev contact regarding the extension request? **I'm sure they will show up when you are out - it's Murphy's Law.

j
Ready Permit EXTENDED  4/20/2007 DONE
see documents letter to Bruce
Ready Permit EXTENDED  2/23/2007 DONE
One time 180 day permit application extension to April 23, 2007 per code.
Telephone call  9/21/2006 DONE
talked to jason at ###-#### that permit is ready
Telephone call  8/1/2006 DONE
tlk to heinz development - ###-#### that permit and fees are ready to be picked up
Permit Ready to Issue  8/1/2006  
Print Occupancy Form  7/31/2006  
Print Occupancy Form  7/31/2006 DONE
Plan assigned to (M_P)7/28/20067/28/20067/28/2006 PASS
7/28/2006 16:42:52 M_P - activity updated through activity BLDA022 from case BLD06-01170.
Routing - PLAN CHECK7/28/2006 7/28/2006 PASS
PLANS/APPL TAKEN TO FRONT DESK  7/28/2006 DONE
Routing - PLAN CHECK6/21/2006 7/28/2006 PEND
Plan s haven't been approved for CUP requirements.
Plan assigned to (M_P)4/26/2006 7/28/2006 PASS
7/28/2006 13:09:14 M_P - activity updated through activity BLDA022 from case BLD06-01170.
Plan resubmittals received  7/13/2006  
Received 1 cover transmittal, 1 copy of 3 page plan reveiw response letter, 2 each of the following sheets--A-0.0, A-2.4, A-2.5, A-3.1, A-3.2, A-4.0, E1.0, E2.0 and taken to Mike Phillips
1st review completed  6/21/2006 FAIL
Failed Plan check.
Routing - FIRE6/15/2006 6/21/2006 PASS
Attached review comments to plans.
Routing - PLAN CHECK5/17/2006 6/15/2006 FAIL
Plan review completed, sent correction report to the architect requesting additional information be submitted for further review prior to issuing permit.
Routing - PLANNING5/9/2006 5/17/2006 PASS
DRH05-00405- Julie A CUP04-00101- Mark P
Routing - PLUMBING5/8/2006 5/9/2006 PASS
per plans and 2003 upc
Routing - Erosion and Sediment5/3/2006 5/8/2006 PASS
ESC plan approved with attached conditions.5/8/06 Refer to ESC06-00711 as master ESC plan for project.adh.
Routing - PUBLIC WORKS4/28/2006 5/3/2006 PASS
Routing - PLANNING Land Div4/26/2006 4/28/2006 PASS
Ok for construction of building. Condo Plat (sub04-00078) has not been recorded yet. As such, no sale of individual units is allowed.
Plans ACCEPTED BY PLAN TECH  4/26/2006  
Recd Pcfee & Taken To Pln CK  4/25/2006  
Application received  4/24/2006  
Routing - PLANNING7/28/2006 2/28/2006 PASS