Second Notice BLD | 8/11/2008 | 8/11/2008 | 9/3/2008 | | DONE |
Cathy Brown
|
|
|
First Notice has not been responded to.
|
First Notice | 6/6/2008 | 6/6/2008 | 8/11/2008 | | DONE |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 6/6/2008 | 6/6/2008 | 6/6/2008 | | PASS |
Tom Arcoraci
|
|
|
|
DOC - Permit Finaled | 6/6/2008 | 6/6/2008 | 6/6/2008 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Final | 3/26/2008 | 3/26/2008 | 3/26/2008 | P | PASS |
Tom Arcoraci
|
|
|
Phone #: ###-#### Internet Inspection Request from: Todd Kurns
|
Code Occupancy Approval | 3/13/2008 | 3/13/2008 | 3/13/2008 | P | PASS |
Dena Gambrel
|
|
|
3-13-08 1113 Passed.
|
BLD-Aging Inspection | 1/15/2008 | 1/15/2008 | 1/15/2008 | | FAIL |
Dena Gambrel
|
|
|
1-14-07 Spoke to Todd. He has still not installed the handicap parking and above ground handicap signs. D. Gambrel
|
Code Occupancy Approval | 11/15/2007 | 11/15/2007 | 11/15/2007 | P | FAIL |
Dena Gambrel
|
|
|
11-14-07 Need more handicap spaces and above ground signs per what the stamped plans indicated.
|
BLD-Aging Inspection | 11/14/2007 | 11/14/2007 | 11/14/2007 | | CANC |
Tom Arcoraci
|
|
|
|
FIRE-Final Inspection | 9/13/2007 | 9/14/2007 | 9/14/2007 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed.
|
FIRE-Final Inspection | 9/12/2007 | 9/13/2007 | 9/13/2007 | A | CANC |
Troy Cobbley
|
|
|
Troy,
I think I have the correct documentation for you to do your inspection. Call me and let me know when you will be at Hillcrest.
Thanks,
Todd Phone #: ###-#### Internet Inspection Request from: Todd Kurns Inspection cancelled from web by: Todd Kurns
|
FIRE-Final Inspection | 8/24/2007 | 8/27/2007 | 8/27/2007 | A | FAIL |
Troy Cobbley
|
|
|
The city approved plans on site were the resubmittals and they were missing the fire dept plan review comments. They were not available on line either. No inspection performed.
|
BLD-Aging Inspection | 8/23/2007 | 8/23/2007 | 8/23/2007 | | CANC |
Tom Arcoraci
|
|
|
|
DOC - Permit Expired | 8/23/2007 | 8/23/2007 | 8/23/2007 | P | PASS |
Tom Arcoraci
|
|
|
|
CHANGE STATUS TO (ISS) | | | 8/23/2007 | | DONE |
|
|
|
Per Tom, reopen permit didn't mean to expire this one
|
Inspection Record Card- Bld | | | 7/3/2007 | | DONE |
|
|
|
|
BLD-Aging Inspection | 5/15/2007 | 5/15/2007 | 5/15/2007 | | NR |
Tom Arcoraci
|
|
|
|
BLD-Final | 2/5/2007 | 2/5/2007 | 2/5/2007 | P | NR |
Tom Arcoraci
|
|
|
Tom, Can you please call me and let me know where I can meet you to pick up the final certificates. Thanks, Todd Phone #: ###-#### needs zoning and fire
|
Plan Reviewer's activity | | | 1/12/2007 | | PASS |
|
|
|
For the exterior wall finish, a 3-coat stucco system was approved in lieu of the originally proposed EIFS. According to the Structural Engineer, the structural design allows for the added dead load. The use of OSB was allowed to be expanded since the concealed spaces were required to be fire sprinkered anyway. Approved revised drawings. CJW
|
(F) Reprint permit | | | 1/12/2007 | | DONE |
|
|
|
|
Telephone call | | | 1/12/2007 | | DONE |
|
|
|
Called Ed and told him that the permit is ready & no fees due///1/12/07 @ 8:15am BAS
|
FIRE-Final Inspection | 12/11/2006 | 12/12/2006 | 12/11/2006 | A | CANC |
Troy Cobbley
|
|
|
Phone #: ###-#### Internet Inspection Request from: Todd Kurns Inspection cancelled from web by: Todd Kurns
|
BLD-Framing/Rough-in | 10/17/2006 | 10/19/2006 | 10/19/2006 | A | PART |
Dave Hannah
|
|
|
Phone #: ###-#### Internet Inspection Request from: Todd Kurns work in progress
|
Plan resubmittals received | | | 10/16/2006 | | |
|
|
|
Received 3 copies of letter from Rex Harrison, 3 copies of revised structrual calcs, 3 copies of the following sheets--A2.1, A2.2, A2.3, A4.1, A4.2, A8.1 and taken to Carl Westfall
|
BLD-Framing/Rough-in | 10/10/2006 | 10/10/2006 | 10/10/2006 | P | PART |
Tom Arcoraci
|
|
|
Tom, this is another partial for framing so the sheating can continue to be installed. Thanks, Todd; Phone #: ###-#### Internet Inspection Request from: Todd Kurns
|
BLD-Framing/Rough-in | 9/18/2006 | 9/18/2006 | 9/18/2006 | P | PART |
Tom Arcoraci
|
|
|
Tom, I need you to look at another portion of the framing in order for us to sheath it. Thanks, Todd; Phone #: ###-#### Internet Inspection Request from: Todd Kurns
|
BLD-Framing/Rough-in | 8/24/2006 | 8/25/2006 | 8/25/2006 | A | PART |
Tom Arcoraci
|
|
|
Inspector, Can you please call me on your way over there so that I can meet you at the job site. Thanks, Todd; Phone #: ###-#### Internet Inspection Request wip east ok from: Todd Kurns wip east side ok
|
(F) Reprint permit | | | 6/13/2006 | | |
|
|
|
|
Inspection Record Card- Bld | | | 6/13/2006 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 6/9/2006 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/7/2006 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/7/2006 | | DONE |
|
|
|
|
Telephone call | | | 6/7/2006 | | |
|
|
|
tlk to ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 6/7/2006 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 4/28/2006 | | 6/7/2006 | | PASS |
|
|
|
6/7/2006 09:09:31 CJW - activity updated through activity BLDA022 from case BLD06-01173.
|
Routing - PLAN CHECK | 5/24/2006 | | 6/7/2006 | | PASS |
|
|
|
Drawings approved after resubmittal review
|
Plan resubmittals received | | | 6/2/2006 | | |
|
|
|
Received 3 copys of sheets A0.1,A1.2,A2.1,A2.2,A2.3,A4.1,A5.2,A4.3,A8.1,A10.1,A10.2,S1 taken to Carl W.
|
Routing - FIRE | 5/22/2006 | | 5/24/2006 | | PASS |
|
|
|
Attached review comments to plans.
|
1st review completed | | | 5/24/2006 | | FAIL |
|
|
|
Failed Plan Check.
|
Routing - PLAN CHECK | 5/11/2006 | | 5/22/2006 | | FAIL |
|
|
|
The IBC plan review was started on May 18, 2006 and was finished on May 22, 2006. The drawings were required to be revised. See the plan review report.
|
Routing - Erosion and Sediment | 5/10/2006 | | 5/11/2006 | | PASS |
|
|
|
ESC waiver request approved with attached conditions.
|
Routing - PLANNING | 5/11/2006 | | 5/11/2006 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 5/10/2006 | | 5/10/2006 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/9/2006 | | PASS |
|
|
|
|
Plan resubmittals received | | | 5/9/2006 | | DONE |
|
|
|
Received 1 ESC Application put with plans
|
Telephone call | | | 5/8/2006 | | |
|
|
|
Called Graig 5-8-06 11:10 left message we need ESC APP and Waiver letter. Plans now in hold box (Barb & Darlas room)
|
Plan resubmittals received | | | 5/4/2006 | | DONE |
|
|
|
Received 1 waiver request for Steve Webb taken to Carl W.
|
Plans ACCEPTED BY PLAN TECH | | | 4/28/2006 | | FAIL |
|
|
|
Plans on hold waiting for ESC application and waiver letter. Barb calling architect. Plans in Marlene's cubicle.
|
Application received | | | 4/24/2006 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/24/2006 | | DONE |
|
|
|
|