Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD06-01173
StatusFinaled
Name GENTHER MASONRY INC
Site Address 5120 W OVERLAND RD
Project NameHILLCREST SHOPPING CENTER
Customer Number 
ePlanReviewNo
Description
(HILLCREST SHOPPING CENTER - EXTERIOR FACADE REMODEL) This building is fire sprinklered for unlimited area. To remodel about 1,100 lineal feet of the exterior facade of the Hillcrest Shopping Center. Work is to include non-fire-resistance-rated parapet structures, steel stud framing, structural wood sheathing, gypsum sheathing, EIFS, veneer brick, some new steel roof joists, and structural modifications to existing steel roof joists. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes. The fire sprinkler system shall comply with NFPA 13 as regulated by the Fire Department. DRH06-00095 **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice BLD8/11/20088/11/20089/3/2008 DONE
DetailsCathy Brown
First Notice has not been responded to.
First Notice6/6/20086/6/20088/11/2008 DONE
DetailsTom Arcoraci
BLD-Aging Inspection6/6/20086/6/20086/6/2008 PASS
DetailsTom Arcoraci
DOC - Permit Finaled6/6/20086/6/20086/6/2008PPASS
DetailsTom Arcoraci
BLD-Final3/26/20083/26/20083/26/2008PPASS
DetailsTom Arcoraci
Phone #: ###-#### Internet Inspection Request from: Todd Kurns
Code Occupancy Approval3/13/20083/13/20083/13/2008PPASS
DetailsDena Gambrel
3-13-08 1113 Passed.
BLD-Aging Inspection1/15/20081/15/20081/15/2008 FAIL
DetailsDena Gambrel
1-14-07 Spoke to Todd. He has still not installed the handicap parking and above ground handicap signs. D. Gambrel
Code Occupancy Approval11/15/200711/15/200711/15/2007PFAIL
DetailsDena Gambrel
11-14-07 Need more handicap spaces and above ground signs per what the stamped plans indicated.
BLD-Aging Inspection11/14/200711/14/200711/14/2007 CANC
DetailsTom Arcoraci
FIRE-Final Inspection9/13/20079/14/20079/14/2007APASS
DetailsTroy Cobbley
Life safety passed.
FIRE-Final Inspection9/12/20079/13/20079/13/2007ACANC
DetailsTroy Cobbley
Troy,

I think I have the correct documentation for you to do your inspection. Call me and let me know when you will be at Hillcrest.

Thanks,

Todd Phone #: ###-#### Internet Inspection Request from: Todd Kurns Inspection cancelled from web by: Todd Kurns
FIRE-Final Inspection8/24/20078/27/20078/27/2007AFAIL
DetailsTroy Cobbley
The city approved plans on site were the resubmittals and they were missing the fire dept plan review comments. They were not available on line either. No inspection performed.
BLD-Aging Inspection8/23/20078/23/20078/23/2007 CANC
DetailsTom Arcoraci
DOC - Permit Expired8/23/20078/23/20078/23/2007PPASS
DetailsTom Arcoraci
CHANGE STATUS TO (ISS)  8/23/2007 DONE
Per Tom, reopen permit didn't mean to expire this one
Inspection Record Card- Bld  7/3/2007 DONE
BLD-Aging Inspection5/15/20075/15/20075/15/2007 NR
DetailsTom Arcoraci
BLD-Final2/5/20072/5/20072/5/2007PNR
DetailsTom Arcoraci
Tom, Can you please call me and let me know where I can meet you to pick up the final certificates. Thanks, Todd Phone #: ###-#### needs zoning and fire
Plan Reviewer's activity  1/12/2007 PASS
For the exterior wall finish, a 3-coat stucco system was approved in lieu of the originally proposed EIFS. According to the Structural Engineer, the structural design allows for the added dead load. The use of OSB was allowed to be expanded since the concealed spaces were required to be fire sprinkered anyway. Approved revised drawings. CJW
(F) Reprint permit  1/12/2007 DONE
Telephone call  1/12/2007 DONE
Called Ed and told him that the permit is ready & no fees due///1/12/07 @ 8:15am BAS
FIRE-Final Inspection12/11/200612/12/200612/11/2006ACANC
DetailsTroy Cobbley
Phone #: ###-#### Internet Inspection Request from: Todd Kurns Inspection cancelled from web by: Todd Kurns
BLD-Framing/Rough-in10/17/200610/19/200610/19/2006APART
DetailsDave Hannah
Phone #: ###-#### Internet Inspection Request from: Todd Kurns work in progress
Plan resubmittals received  10/16/2006  
Received 3 copies of letter from Rex Harrison, 3 copies of revised structrual calcs, 3 copies of the following sheets--A2.1, A2.2, A2.3, A4.1, A4.2, A8.1 and taken to Carl Westfall
BLD-Framing/Rough-in10/10/200610/10/200610/10/2006PPART
DetailsTom Arcoraci
Tom, this is another partial for framing so the sheating can continue to be installed. Thanks, Todd; Phone #: ###-#### Internet Inspection Request from: Todd Kurns
BLD-Framing/Rough-in9/18/20069/18/20069/18/2006PPART
DetailsTom Arcoraci
Tom, I need you to look at another portion of the framing in order for us to sheath it. Thanks, Todd; Phone #: ###-#### Internet Inspection Request from: Todd Kurns
BLD-Framing/Rough-in8/24/20068/25/20068/25/2006APART
DetailsTom Arcoraci
Inspector, Can you please call me on your way over there so that I can meet you at the job site. Thanks, Todd; Phone #: ###-#### Internet Inspection Request wip east ok from: Todd Kurns wip east side ok
(F) Reprint permit  6/13/2006  
Inspection Record Card- Bld  6/13/2006 DONE
Issue PAID IN FULL permit  6/9/2006 DONE
PLANS/APPL TAKEN TO FRONT DESK  6/7/2006 DONE
Inspection Record Card- Bld  6/7/2006 DONE
Telephone call  6/7/2006  
tlk to ###-#### that permit and fees are ready to be picked up
Permit Ready to Issue  6/7/2006 DONE
Plan assigned to (CJW)4/28/2006 6/7/2006 PASS
6/7/2006 09:09:31 CJW - activity updated through activity BLDA022 from case BLD06-01173.
Routing - PLAN CHECK5/24/2006 6/7/2006 PASS
Drawings approved after resubmittal review
Plan resubmittals received  6/2/2006  
Received 3 copys of sheets A0.1,A1.2,A2.1,A2.2,A2.3,A4.1,A5.2,A4.3,A8.1,A10.1,A10.2,S1 taken to Carl W.
Routing - FIRE5/22/2006 5/24/2006 PASS
Attached review comments to plans.
1st review completed  5/24/2006 FAIL
Failed Plan Check.
Routing - PLAN CHECK5/11/2006 5/22/2006 FAIL
The IBC plan review was started on May 18, 2006 and was finished on May 22, 2006. The drawings were required to be revised. See the plan review report.
Routing - Erosion and Sediment5/10/2006 5/11/2006 PASS
ESC waiver request approved with attached conditions.
Routing - PLANNING5/11/2006 5/11/2006 PASS
Routing - PUBLIC WORKS5/10/2006 5/10/2006 PASS
Plans ACCEPTED BY PLAN TECH  5/9/2006 PASS
Plan resubmittals received  5/9/2006 DONE
Received 1 ESC Application put with plans
Telephone call  5/8/2006  
Called Graig 5-8-06 11:10 left message we need ESC APP and Waiver letter. Plans now in hold box (Barb & Darlas room)
Plan resubmittals received  5/4/2006 DONE
Received 1 waiver request for Steve Webb taken to Carl W.
Plans ACCEPTED BY PLAN TECH  4/28/2006 FAIL
Plans on hold waiting for ESC application and waiver letter. Barb calling architect. Plans in Marlene's cubicle.
Application received  4/24/2006  
Recd Pcfee & Taken To Pln CK  4/24/2006 DONE