(F) Reprint permit | | | 1/25/2007 | | |
|
|
|
|
Second Notice BLD | 12/27/2006 | 12/27/2006 | 1/8/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 9/28/2006 | 12/27/2006 | | DONE |
|
|
|
|
Permanent occupancy UNPAID FEE | | | 9/28/2006 | | DONE |
|
|
|
Perm.Occ. Cert. #11228 issued on 9-28-06 to Cabela's.
|
BLD-Final | 9/26/2006 | 9/27/2006 | 9/27/2006 | A | PASS |
Mike Jordan
|
|
|
dwayne - call 1/2 hr prior to meet there; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley. ok for perm occ. All issues have been resolved.
|
Permanent Occupancy | | 9/27/2006 | 9/27/2006 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 8/31/2006 | | DONE |
|
|
|
|
Code Occupancy Approval | | | 8/24/2006 | | PASS |
|
|
|
ALL IN AS REQUIRED AND FINAL SIGNED OFF.
|
FIRE-Final Inspection | 8/21/2006 | 8/21/2006 | 8/21/2006 | P | PASS |
Troy Cobbley
|
|
|
Life safety finaled
|
FIRE-Final Inspection | 8/21/2006 | 8/21/2006 | 8/21/2006 | P | PASS |
Troy Cobbley
|
|
|
Life safety finaled
|
BLD-Final | 8/15/2006 | 8/17/2006 | 8/17/2006 | P | PART |
Tom Arcoraci
|
|
|
mark; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley ok for temp occ by g slane
|
Code Occupancy Approval Temp | 8/17/2006 | 8/17/2006 | 8/17/2006 | P | DONE |
Scott M.Brown
|
|
|
place in as required, some roof not done and construction supplies in parking area to west so only signed temporary.
|
FIRE-Final Inspection | 8/15/2006 | 8/17/2006 | 8/17/2006 | A | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given with dave hanniman's permission until the dry system for the outside canopy has been completed. At that point the fire alarm permit that covered both the interior and the exterior canopy can be finaled. All life safety items are ok to final when this is done.
|
Temporary occupancy | | | 8/17/2006 | | DONE |
|
|
|
Temp. Occ. Cert. # 5425 issued 8-17-06 to Cabela's.
|
FIRE-Final Inspection | 8/15/2006 | 8/15/2006 | 8/15/2006 | P | FAIL |
Troy Cobbley
|
|
|
Testing today was for the exit signs/emergency lights for all areas north of the mountain. All devices worked except for an emergency light at the exit from the warehouse to the gun sales and the exit light from the gun library has no battery backup.
|
Override - Parcel Holds | 1/1/1900 | 1/1/1900 | 8/15/2006 | | |
|
|
|
|
Override - Parcel Holds | 1/1/1900 | 1/1/1900 | 8/15/2006 | | |
|
|
|
|
Override - Parcel Holds | | | 8/15/2006 | | |
|
|
|
|
FIRE-Final Inspection | 8/14/2006 | 8/14/2006 | 8/14/2006 | P | FAIL |
Troy Cobbley
|
|
|
Testing today was for the exit signs and emergency lights for all areas south of the mountain which passed.
|
BLD-Final | 8/14/2006 | 8/14/2006 | 8/14/2006 | P | NR |
Jim Sly
|
|
|
Mark; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt Need Min Temp Occ from all trades and CDHD, Code enforce, and fire prior to calling for Bldg final.
|
Override - Parcel Holds | | | 8/14/2006 | | |
|
|
|
|
Conference | 8/11/2006 | 8/11/2006 | 8/11/2006 | | PART |
Bob Archibald
|
|
|
Final inspection for occupancy requirements, correction notice issued. Ok for occupancy when all other departments have signed and corrections made.
|
BLD-Conference | 8/1/2006 | 8/1/2006 | 8/1/2006 | P | PART |
Mike Jordan
|
|
|
mark ; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley. Performed walkthru with contractor. Noted some penetrations that still require firecaulking. Checked several doors, frames and hardware for proper ul listing. Noted air duct in exit passageway that needs to be removed. West side by general store. Still need documentation on interior finishes and will need final aff. letter from special insp.
|
BLD-Wall cover | 7/17/2006 | 7/17/2006 | 7/17/2006 | P | PASS |
Mike Jordan
|
|
|
Mark; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt. ceiling grid insp. at front offices, cashroom and back warehouse area.
|
BLD-Conference | 7/11/2006 | 7/11/2006 | 7/11/2006 | P | PASS |
Mike Jordan
|
|
|
mark; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Interior framning at aquarium.
|
BLD-Framing/Rough-in | 6/22/2006 | 6/23/2006 | 6/23/2006 | A | PART |
Mike Jordan
|
|
|
mark; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley. Reviewed approval for exterior framing for dens glass. inspected soffits for fly shop, bargaincave and grid for hardlid at gunshop. interior framing at restrooms, pending plumbing ri. Needs to comnplete firecaulking and get special insp. for welding and bolting.
|
BLD-Framing/Rough-in | 6/19/2006 | 6/19/2006 | 6/19/2006 | P | PART |
Mike Jordan
|
|
|
mark; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley.contractor to supply connection detail for 2.5 inch steel studs to exterior face of split face CMU wall.
|
BLD-Other | 6/13/2006 | 6/14/2006 | 6/14/2006 | P | DEFR |
Mike Jordan
|
|
|
kevin Note: rebar and columns; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Conc columns inspected by special insp. at north side of bldg. Bottom of column was cleaned.
|
BLD-Framing/Rough-in | 6/13/2006 | 6/14/2006 | 6/14/2006 | A | PASS |
Mike Jordan
|
|
|
marc ; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley. Interior steel stud framing at north end of bldg as well as interior framed columns.
|
BLD-Concrete | 6/12/2006 | 6/13/2006 | 6/13/2006 | A | PART |
Mike Jordan
|
|
|
kevin - rebar; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley. Concrete columns, north side of bldg. Needs to clean out all dirt, tie wire, and rocks from bottom of column.
|
BLD-Framing/Rough-in | 6/8/2006 | 6/8/2006 | 6/8/2006 | P | PART |
Mike Jordan
|
|
|
mark - ; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley. ok to cover 2nd side of one hour walls at south end og bldg. Also reviewed UL report for 1 hour wall construction. All applicable elec boxes were putty padded
|
BLD-Framing/Rough-in | 6/7/2006 | 6/7/2006 | 6/7/2006 | P | PART |
Mike Jordan
|
|
|
Mark; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt. Framing on interior columns south half ok. Framing at fly fishing display ok. Still need to putty pad steel elec. boxes in one hour wall were applicable.
|
Permit Ready to Issue | | | 6/5/2006 | | DONE |
|
|
|
|
Print Occupancy Form | | | 6/5/2006 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 6/5/2006 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 6/2/2006 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/2/2006 | | DONE |
|
|
|
|
Print Occupancy Form | | | 6/2/2006 | | DONE |
|
|
|
|
Plan assigned to (R_H) | 5/17/2006 | | 6/2/2006 | | PASS |
|
|
|
6/2/2006 11:58:15 RMH - activity updated through activity BLDA022 from case BLD06-01174.
|
Routing - PLAN CHECK | 5/26/2006 | | 6/2/2006 | | PASS |
|
|
|
|
Plan resubmittals received | | | 6/1/2006 | | |
|
|
|
Received 1 cover transmittal, 3 copies of ME0.1 and taken to Ron Hill
|
Plan resubmittals received | | | 5/31/2006 | | |
|
|
|
Recieved 4pg. response to comments, 2pg. response to comments, 3 sets of structural calculations, 3 copies of the following: E1.1, E1.3, E1.5, E1.6, A1.1b, A1.2b, A1.3b, A1.4b, A1.5a, A1.5b, A1.6b, A4.23, A7.1, A1.23, taken to Ron Hill.
|
1st review completed | | | 5/26/2006 | | FAIL |
|
|
|
Failed Plan Check.
|
Routing - FIRE | 5/25/2006 | | 5/26/2006 | | PASS |
|
|
|
Faxed review comments to architect, Brian Haines. Attached review comments to plans.
|
Case Summary (BLD) | | | 5/25/2006 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 5/22/2006 | | 5/25/2006 | | FAIL |
|
|
|
Faxed and emailed requirements to architect Brian
|
Routing - PLUMBING | 5/17/2006 | | 5/22/2006 | | PASS |
|
|
|
additional cross connection protection may be required at the cart wash, mountain water fall, etc.
|
Routing - PLANNING | 5/17/2006 | | 5/17/2006 | | PASS |
|
|
|
Cody Riddle DRH06-00057
|
Routing - PUBLIC WORKS | 5/17/2006 | | 5/17/2006 | | PASS |
|
|
|
|
Plan resubmittals received | | | 5/16/2006 | | |
|
|
|
received 2 copies "5" pages of app, 2 pages from crabtree, rohrbaugh & asso., & "3" sets of stamped approval from cdh CS.2 as requested, "3" sets of A1.22-1, "3" sets S2.04, "3"sets E1.7-
|
Plans ACCEPTED BY PLAN TECH | | | 5/16/2006 | | |
|
|
|
|
Routing Off Site - C.D.H | 4/27/2006 | | 5/16/2006 | | PASS |
|
|
|
4/27/06-Picked up by contractor to take to CDH for review.
cdh approval was on 5/12/06
|
Plans ACCEPTED BY PLAN TECH | | | 4/25/2006 | | FAIL |
|
|
|
Plans lacking some specific pages and Central District Health approval. Contacted by Barbara Stitt.
|
Application received | | | 4/24/2006 | | |
|
|
|
|
Third Notice BLD | 1/8/2007 | 1/8/2007 | | | |
|
|
|
Second Notice has not been responded to.
|
BLD-Final | 8/9/2006 | 8/16/2006 | | P | |
George Slane
|
|
|
Mark; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
|
Routing Off Site - C.D.H | 4/27/2006 | | | | |
|
|
|
|