Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD06-01174
StatusFinaled
Name LAYTON CONSTRUCTION
Site Address 8109 W FRANKLIN RD
Project NameFRANKLIN TOWN PLAZA
Customer Number 
ePlanReviewNo
Description
RCE-6233 (CABELA'S-TENANT IMPROVEMENT)(FRANKLIN TOWN PLAZA) To construct interior tenant improvements for a 136,194 sq.ft. retail tenant per approved plans. Work to include, construction of interior partitions, installation of suspended ceiling systems, construction of a new mens and womens accessible restrooms, construction of a small kitchen area, miscelaneous related finishes. Defered submittals for the mountain and aquarium fixtures. Separate permit and engineering required for any storage racking over eight feet high. Demo permit was issued under Bld06-00505 / Exterior structural permit was issued under Bld06-00632. This building is fully fire sprinklered for unlimited area provisions, any alterations or modifications to the sprinkler system shall be per NFPA #13 as regulated by the fire department. RMH
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
(F) Reprint permit  1/25/2007  
Second Notice BLD12/27/200612/27/20061/8/2007 DONE
First Notice has not been responded to.
First Notice 9/28/200612/27/2006 DONE
Permanent occupancy UNPAID FEE  9/28/2006 DONE
Perm.Occ. Cert. #11228 issued on 9-28-06 to Cabela's.
BLD-Final9/26/20069/27/20069/27/2006APASS
DetailsMike Jordan
dwayne - call 1/2 hr prior to meet there; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley. ok for perm occ. All issues have been resolved.
Permanent Occupancy 9/27/20069/27/2006 DONE
Details
Case Summary (BLD)  8/31/2006 DONE
Code Occupancy Approval  8/24/2006 PASS
ALL IN AS REQUIRED AND FINAL SIGNED OFF.
FIRE-Final Inspection8/21/20068/21/20068/21/2006PPASS
DetailsTroy Cobbley
Life safety finaled
FIRE-Final Inspection8/21/20068/21/20068/21/2006PPASS
DetailsTroy Cobbley
Life safety finaled
BLD-Final8/15/20068/17/20068/17/2006PPART
DetailsTom Arcoraci
mark; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley ok for temp occ by g slane
Code Occupancy Approval Temp8/17/20068/17/20068/17/2006PDONE
DetailsScott M.Brown
place in as required, some roof not done and construction supplies in parking area to west so only signed temporary.
FIRE-Final Inspection8/15/20068/17/20068/17/2006APART
DetailsTroy Cobbley
A temporary occupancy was given with dave hanniman's permission until the dry system for the outside canopy has been completed. At that point the fire alarm permit that covered both the interior and the exterior canopy can be finaled. All life safety items are ok to final when this is done.
Temporary occupancy  8/17/2006 DONE
Temp. Occ. Cert. # 5425 issued 8-17-06 to Cabela's.
FIRE-Final Inspection8/15/20068/15/20068/15/2006PFAIL
DetailsTroy Cobbley
Testing today was for the exit signs/emergency lights for all areas north of the mountain. All devices worked except for an emergency light at the exit from the warehouse to the gun sales and the exit light from the gun library has no battery backup.
Override - Parcel Holds1/1/19001/1/19008/15/2006  
Override - Parcel Holds1/1/19001/1/19008/15/2006  
Override - Parcel Holds  8/15/2006  
FIRE-Final Inspection8/14/20068/14/20068/14/2006PFAIL
DetailsTroy Cobbley
Testing today was for the exit signs and emergency lights for all areas south of the mountain which passed.
BLD-Final8/14/20068/14/20068/14/2006PNR
DetailsJim Sly
Mark; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
Need Min Temp Occ from all trades and CDHD, Code enforce, and fire prior to calling for Bldg final.
Override - Parcel Holds  8/14/2006  
Conference8/11/20068/11/20068/11/2006 PART
DetailsBob Archibald
Final inspection for occupancy requirements, correction notice issued. Ok for occupancy when all other departments have signed and corrections made.
BLD-Conference8/1/20068/1/20068/1/2006PPART
DetailsMike Jordan
mark ; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley. Performed walkthru with contractor. Noted some penetrations that still require firecaulking. Checked several doors, frames and hardware for proper ul listing. Noted air duct in exit passageway that needs to be removed. West side by general store. Still need documentation on interior finishes and will need final aff. letter from special insp.
BLD-Wall cover7/17/20067/17/20067/17/2006PPASS
DetailsMike Jordan
Mark; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt. ceiling grid insp. at front offices, cashroom and back warehouse area.
BLD-Conference7/11/20067/11/20067/11/2006PPASS
DetailsMike Jordan
mark; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Interior framning at aquarium.
BLD-Framing/Rough-in6/22/20066/23/20066/23/2006APART
DetailsMike Jordan
mark; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley. Reviewed approval for exterior framing for dens glass. inspected soffits for fly shop, bargaincave and grid for hardlid at gunshop. interior framing at restrooms, pending plumbing ri. Needs to comnplete firecaulking and get special insp. for welding and bolting.
BLD-Framing/Rough-in6/19/20066/19/20066/19/2006PPART
DetailsMike Jordan
mark; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley.contractor to supply connection detail for 2.5 inch steel studs to exterior face of split face CMU wall.
BLD-Other6/13/20066/14/20066/14/2006PDEFR
DetailsMike Jordan
kevin Note: rebar and columns; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Conc columns inspected by special insp. at north side of bldg. Bottom of column was cleaned.
BLD-Framing/Rough-in6/13/20066/14/20066/14/2006APASS
DetailsMike Jordan
marc ; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley. Interior steel stud framing at north end of bldg as well as interior framed columns.
BLD-Concrete6/12/20066/13/20066/13/2006APART
DetailsMike Jordan
kevin - rebar; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley. Concrete columns, north side of bldg. Needs to clean out all dirt, tie wire, and rocks from bottom of column.
BLD-Framing/Rough-in6/8/20066/8/20066/8/2006PPART
DetailsMike Jordan
mark - ; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley. ok to cover 2nd side of one hour walls at south end og bldg. Also reviewed UL report for 1 hour wall construction. All applicable elec boxes were putty padded
BLD-Framing/Rough-in6/7/20066/7/20066/7/2006PPART
DetailsMike Jordan
Mark; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt. Framing on interior columns south half ok. Framing at fly fishing display ok. Still need to putty pad steel elec. boxes in one hour wall were applicable.
Permit Ready to Issue  6/5/2006 DONE
Print Occupancy Form  6/5/2006  
Issue PAID IN FULL permit  6/5/2006 DONE
Case Summary (BLD)  6/2/2006 DONE
PLANS/APPL TAKEN TO FRONT DESK  6/2/2006 DONE
Print Occupancy Form  6/2/2006 DONE
Plan assigned to (R_H)5/17/2006 6/2/2006 PASS
6/2/2006 11:58:15 RMH - activity updated through activity BLDA022 from case BLD06-01174.
Routing - PLAN CHECK5/26/2006 6/2/2006 PASS
Plan resubmittals received  6/1/2006  
Received 1 cover transmittal, 3 copies of ME0.1 and taken to Ron Hill
Plan resubmittals received  5/31/2006  
Recieved 4pg. response to comments, 2pg. response to comments, 3 sets of structural calculations, 3 copies of the following: E1.1, E1.3, E1.5, E1.6, A1.1b, A1.2b, A1.3b, A1.4b, A1.5a, A1.5b, A1.6b, A4.23, A7.1, A1.23, taken to Ron Hill.
1st review completed  5/26/2006 FAIL
Failed Plan Check.
Routing - FIRE5/25/2006 5/26/2006 PASS
Faxed review comments to architect, Brian Haines. Attached review comments to plans.
Case Summary (BLD)  5/25/2006 DONE
Routing - PLAN CHECK5/22/2006 5/25/2006 FAIL
Faxed and emailed requirements to architect Brian
Routing - PLUMBING5/17/2006 5/22/2006 PASS
additional cross connection protection may be required at the cart wash, mountain water fall, etc.
Routing - PLANNING5/17/2006 5/17/2006 PASS
Cody Riddle DRH06-00057
Routing - PUBLIC WORKS5/17/2006 5/17/2006 PASS
Plan resubmittals received  5/16/2006  
received 2 copies "5" pages of app, 2 pages from crabtree, rohrbaugh & asso., & "3" sets of stamped approval from cdh CS.2 as requested, "3" sets of A1.22-1, "3" sets S2.04, "3"sets E1.7-
Plans ACCEPTED BY PLAN TECH  5/16/2006  
Routing Off Site - C.D.H4/27/2006 5/16/2006 PASS
4/27/06-Picked up by contractor to take to CDH for review.

cdh approval was on 5/12/06
Plans ACCEPTED BY PLAN TECH  4/25/2006 FAIL
Plans lacking some specific pages and Central District Health approval. Contacted by Barbara Stitt.
Application received  4/24/2006  
Third Notice BLD1/8/20071/8/2007   
Second Notice has not been responded to.
BLD-Final8/9/20068/16/2006 P 
DetailsGeorge Slane
Mark; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
Routing Off Site - C.D.H4/27/2006