Case Summary (BLD) | | | 3/14/2016 | | DONE |
|
|
|
|
BLD-Aging Inspection | 6/3/2008 | 6/3/2008 | 6/3/2008 | | PASS |
Jim Storey
|
|
|
doc expired no longer in bld.
|
DOC - Permit Expired | 6/3/2008 | 6/3/2008 | 6/3/2008 | P | PASS |
Jim Storey
|
|
|
idaho truss no longer in bld.
|
BLD-Aging Inspection | 3/27/2008 | 3/27/2008 | 3/27/2008 | | DEFR |
Jim Storey
|
|
|
pending fire isues.
|
BLD-Aging Inspection | 1/23/2008 | 1/23/2008 | 1/23/2008 | | DEFR |
Jim Storey
|
|
|
pending fire action.
|
BLD-Final | 11/20/2007 | 11/21/2007 | 11/26/2007 | A | CANC |
Forrest France
|
|
|
Need project related fire alarm permit finaled.
|
BLD-Aging Inspection | 11/19/2007 | 11/19/2007 | 11/20/2007 | | DEFR |
Jim Storey
|
|
|
to fire
|
FIRE-Final Inspection | 6/4/2007 | 6/4/2007 | 6/5/2007 | P | FAIL |
Forrest France
|
|
|
Pending project related fire alarm modifications for supervision of the antifreeze loop tamper switches.
|
BLD-Aging Inspection | 5/28/2007 | 5/28/2007 | 5/29/2007 | | DEFR |
Jim Storey
|
|
|
to fire
|
BLD-Aging Inspection | 1/9/2007 | 1/9/2007 | 1/9/2007 | | DEFR |
Jim Storey
|
|
|
to fir and ele
|
BLD-Aging Inspection | 11/8/2006 | 11/8/2006 | 11/8/2006 | | NR |
Jim Storey
|
|
|
ele and fire
|
BLD-Final | 9/6/2006 | 9/7/2006 | 9/7/2006 | A | NR |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 9/6/2006 at 1:28:11 PM. Contact: ###-####. Bldg annexed to Boise City......Fire Dept is Req sprinklers at Ext. overhangs.....that plan in design review.....NR Need Fire final prior to Struct final.
|
BLD-Aging Inspection | 9/6/2006 | 9/6/2006 | 9/6/2006 | | NR |
Jim Storey
|
|
|
pending fire
|
BLD-Other | 7/3/2006 | 7/5/2006 | 7/5/2006 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 7/3/2006 at 2:06:46 PM. ok for temp occ.
|
FIRE-Final Inspection | 7/3/2006 | 7/3/2006 | 7/3/2006 | P | PART |
Forrest France
|
|
|
Life safety c/n items from previous inspection have been completed. Project related fire alarm work is not yet completed, the FA panel has been verified for functionality per conditions of temproary occupancy request. Project related fire sprinkler work is not completed pending application and issuance of a fire sprinkler permit to perform required corrections. BLD final pending alarm and sprinkler permit finals.
|
FIRE-Final Inspection | 6/30/2006 | 6/30/2006 | 6/30/2006 | P | NR |
Forrest France
|
|
|
The project related fire alarm permit must be requested for inspection and final prior to life safety final approval.
|
FIRE-Conference | 6/22/2006 | 6/23/2006 | 6/23/2006 | P | FAIL |
Forrest France
|
|
|
New stair from the 2nd floor office mezzanine is not yet completed, provide approved door hardware at the main entry/exit, provide approved hardware at two office door locations, provide building address numbers of the appropriate size, one attatched exterior canopy is not fire sprinklered (permit pending).
|
Case Summary (BLD) | | | 6/22/2006 | | DONE |
|
|
|
|
BLD-Other | 6/19/2006 | 6/21/2006 | 6/21/2006 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 6/19/2006 at 3:45:55 PM. Contact: ###-####. remove flush bolts back exit/ lever at resaroom/ knob change east storage area.
|
Issue PAID IN FULL permit | | | 5/15/2006 | | DONE |
|
|
|
|
Print Occupancy Form | | | 5/12/2006 | | |
|
|
|
|
Telephone call | | | 5/12/2006 | | DONE |
|
|
|
tlk to todd monroe ###-#### that permit and fees are ready to be picked - he needs to sign a paper verify he is repsonsible CG and need new cert of value
|
Permit Ready to Issue | | | 5/12/2006 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 5/11/2006 | | 5/12/2006 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/12/2006 | | DONE |
|
|
|
|
Plan assigned to (R_H) | 5/2/2006 | | 5/12/2006 | | PASS |
|
|
|
5/12/2006 13:33:05 RMH - activity updated through activity BLDA022 from case BLD06-01235.
|
Routing - FIRE | 5/11/2006 | | 5/11/2006 | | PASS |
|
|
|
|
Plan resubmittals received | | | 5/11/2006 | | |
|
|
|
received "3" sheets site plans for fire hydrant
|
Plan resubmittals received | | | 5/11/2006 | | PASS |
|
|
|
Faxed review comments to architect. Attached review comments to plans.
|
1st review completed | | | 5/11/2006 | | FAIL |
|
|
|
Failed Fire.
|
Routing - FIRE | 5/8/2006 | | 5/10/2006 | | FAIL |
|
|
|
Faxed resubmittal items and review notes to Brian Hauff.
|
Plan resubmittals received | | | 5/9/2006 | | |
|
|
|
received "3" sets of sheet 2 of 4, 3 of 4, & 4 of 4 a 2 page letter from brian hauff & associates llc, a 2 page letter of calculations from performance engineers, & a letter from delta machinery-gave plans to ron hill
|
Case Summary (BLD) | | | 5/8/2006 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 5/2/2006 | | 5/8/2006 | | PASS |
|
|
|
Faxed and Mailed requirements to the architect on 5/8/06, Routed to fire on same day.
|
Recd Pcfee & Taken To Pln CK | | | 5/2/2006 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/2/2006 | | |
|
|
|
|
Application received | | | 4/28/2006 | | |
|
|
|
|