Permit Information
Permit NumberBLD06-01246
StatusFinaled
Name TRUAX COMPANY
Site Address 3913 N MAPLE GROVE RD
Project Name 
Customer Number 
ePlanReviewNo
Description
"CONTRACTOR ROBERT TRUAX REGISTRATION NUMBER RCE-6390" To construct a 1672sq.ft. Two story single family dwelling (850sq.ft. Main floor / 822sq.ft. Upper floor) with a 80sq.ft. Covered front porch, and a 572sq.ft. Attached garage per approved plans, all red-lining, and Plan review report. THE PERMIT HOLDER is responsible to comply with current wall bracing requirements adopted by Boise city. R-1C zoning district, building setbacks, and CZC05-00170 per Susan Riggs with Planning and Zoning. (SRZ)
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final2/15/20072/16/20072/16/2007PPASS
DetailsJim Sly
john - please call 1/2 hr prior to inspection ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
C/C issued
DOC - Permit Finaled2/16/20072/16/20072/16/2007PPASS
DetailsJim Sly
BLD-Energy code compliance9/25/20069/26/20069/26/2006PPASS
DetailsJim Storey
traux Note:please call when on the way; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Framing/Rough-in9/20/20069/21/20069/21/2006APASS
DetailsJim Sly
john - call prior to insp; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
BLD-Foundation7/21/20067/24/20067/24/2006PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 7/21/2006 at 7:22:08 AM. Contact: ###-####.
BLD-Footing7/21/20067/21/20067/21/2006PPASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 7/21/2006 at 7:20:53 AM. Contact: ###-####.
Issue PAID IN FULL permit  7/18/2006 DONE
Plan assigned to (SRZ)6/9/20066/9/20066/9/2006 PASS
6/9/2006 11:09:26 SRZ - activity updated through activity BLDA022 from case BLD06-01246.
Plan assigned to (SAM)5/1/20065/1/20066/9/2006 DONE
Case Summary (BLD)  6/9/2006  
PLANS/APPL TAKEN TO FRONT DESK  6/9/2006 DONE
Inspection Record Card- Bld  6/9/2006 DONE
Telephone call  6/9/2006 DONE
lft vm with traux ###-#### that permit and fees are ready to be picked up
Permit Ready to Issue  6/9/2006 DONE
Routing - PLAN CHECK5/19/2006 6/9/2006 PASS
Routing - PLANNING5/3/2006 5/18/2006 PASS
Routing - PLANNING Land Div5/3/2006 5/3/2006 PASS
parcel created by one time lot split.
Application received  5/1/2006  
Routing - PUBLIC WORKS5/18/2006