Information based on query as of Saturday, August 17, 2024.
Permit Information
Permit NumberBLD06-01283
StatusFinaled
Name DESIGN RESOURCES
Site Address 5551 W BLOOM ST
Project NameCHALLENGER SCHOOL
Customer Number 
ePlanReviewNo
Description
(CHALLENGER SCHOOL) To remodel an existing 9,834 sq.ft. day care (pre-school) and add 88 sq. ft. to the lobby for new owner/operator per approved plans. Other work includes interior demo per plan, a new 6 x 6 22 foot high bell tower and new interior shear walls per approved plans. No conditional use is required per Scott Spjute, Zoning Mgr. Zoning certificate for design review changes submitted on 5/16/06.
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
(F) Reprint permit  2/15/2007  
Third Notice BLD1/8/20071/8/20071/26/2007 DONE
Second Notice has not been responded to.
Second Notice BLD9/25/20069/25/20061/8/2007 DONE
First Notice has not been responded to.
First Notice 9/1/20069/25/2006 DONE
Permanent occupancy  9/1/2006 DONE
Perm. Occ. Cert. # 11197 issued 9-1-06 to the Challenger School
Permanent Occupancy 8/31/20068/31/2006 DONE
Details
BLD-Final8/22/20068/23/20068/23/2006ACANC
DetailsTony Young
jason; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley - canceled by contractor
Temporary occupancy  8/23/2006 DONE
Temp. Occ. Cert. # 5427 issued 8-23-06 to the Challenger School.
BLD-Final8/21/20068/22/20068/22/2006PPART
DetailsTony Young
jason; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
ok for temp occ.
BLD-Final8/18/20068/21/20068/21/2006PPART
DetailsTony Young
jason ; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
need trades 1st
FIRE-Final Inspection8/18/20068/21/20068/21/2006APASS
DetailsTroy Cobbley
Life safety finaled. Only the new construction areas as per the approved plans were inspected.
Print Occupancy Form  8/15/2006 DONE
BLD-Other7/13/20067/14/20067/14/2006APASS
DetailsTony Young
jason Note: shear wall nailing; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
all shear ok to cover
BLD-Framing/Rough-in7/14/20067/14/20067/14/2006PPASS
DetailsTony Young
jason Note: shear wall nailing; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
all ok to cover
BLD-Framing/Rough-in7/11/20067/11/20067/11/2006PPART
DetailsTony Young
jason - outside nail; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
ext shear ok to cover
BLD-Other7/6/20067/7/20067/7/2006APART
DetailsTony Young
jason Note: nailing ins sheer wall/look at roof also; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
shear wall #1 interior ok,, exterior ok to cover,, overlay roof ok to cover
BLD-Framing/Rough-in6/28/20066/29/20066/29/2006APART
DetailsTony Young
jason Note; hold downs; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
interior shear holddowns ok,, ok to apply shear panels pending electrical approval
BLD-Footing6/23/20066/26/20066/26/2006APART
DetailsTony Young
Scheduled by a contractor via Hello! on 6/23/2006 at 2:30:18 PM. Contact: ###-####.
foundation ok
BLD-Conference6/23/20066/23/20066/23/2006PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 6/23/2006 at 9:15:44 AM. Contact: ###-####.
discussed A D A restroom unisex and kids restroom,, needs to talk w/ architect and plan review,, also other changes
BLD-Footing6/22/20066/23/20066/23/2006APART
DetailsTony Young
Scheduled by a contractor via Hello! on 6/22/2006 at 1:13:42 PM. Contact: ###-####.
wip
FIRE-Conference6/12/20066/12/20066/14/2006PDONE
DetailsTroy Cobbley
melanie; Phone #: ###-#### Per sam rogers and my discussion the existing fire alarm system can remain "as is". Permits will be required for any modifications due to the remodel work. Limited modifications such as the addition of a smoke detector over the panel or relocation of a pull station will not drive a IFC compliant fire alarm system for the entire building. The day care will have to comply with the boise city ordinances for day cares 7-01-70.
FIRE-Conference6/9/20066/12/20066/12/2006AFAIL
DetailsTroy Cobbley
melanie kreizenbeck - call prior to insp; Phone #: ###-#### No one on site and phone calls were not answered.
Print Occupancy Form  6/6/2006 DONE
Issue & PRINT to be Invoiced  6/6/2006 DONE
Plan assigned to (MLO)5/16/2006 6/5/2006 PASS
6/5/2006 14:01:28 MLO - activity updated through activity BLDA022 from case BLD06-01283.
Plan resubmittals received  6/5/2006 DONE
Received 2 calcs,& 2 copys of sheets A0.1,A1.0,A1.1,A2.1,A3.1,A7.1,S1.1,S2.1,EN1.1 taken to Mike O.
Case Summary (BLD)  6/5/2006  
Routing - PLAN CHECK6/5/2006 6/5/2006 PASS
PLANS/APPL TAKEN TO FRONT DESK  6/5/2006 DONE
Routing - PLANNING5/26/2006 5/27/2006 PASS
Exterior changes okay per C. Riddle, Design Review. Change in use okay per Scott Spjute.
1st review completed  5/25/2006 FAIL
Failed Plan Check.
Routing - FIRE5/23/2006 5/25/2006 PASS
Attached review comments to plans. Faxed review comments to Rocky Towle.
Plan resubmittals requested  5/23/2006 DONE
IBC corrections
Routing - PLAN CHECK5/22/2006 5/23/2006 FAIL
corrections sent to architect
Routing - PLUMBING5/17/2006 5/22/2006 PASS
per plans and 2003 upc
Routing - PLANNING5/17/2006 5/17/2006 FAIL
Building permit submitted concurrently with Zoning Certificate. Planning cannot review/approve building plans prior to zoning approval. CER
Routing - PUBLIC WORKS5/16/2006 5/17/2006 PASS
Routing - Erosion and Sediment6/17/2006 5/17/2006 PASS
ESC plan waiver request approved with attached conditions.
Plans ACCEPTED BY PLAN CHECK  5/16/2006 PASS
5/16/06-Plans began routing on this date as DR zoning certificate was applied for by Rocky Towle. CU modification was waived by Scott Spjute on 5/10/06 - see copy attached to plans.
Plans ACCEPTED BY PLAN TECH  5/5/2006 FAIL
Plans need CU and DR modifications prior to routing.
Recd Pcfee & Taken To Pln CK  5/5/2006  
Application received  5/3/2006  
Routing - PLAN CHECK5/27/2006