Permit Information
Permit NumberBLD06-01340
StatusFinaled
Name NATURE CONSERVANCY / GLOBAL FIRE
Site Address 950 W BANNOCK ST Unit: 210
Project Name10TH & BANNOCK-2ND FLR
Customer Number 
ePlanReviewNo
Description
(RCE-8247 THE CHRISTENSEN CORPORATION) (THE NATURE CONSERVANCY & GLOBAL FIRE INITIATIVE - BANNER BANK - STE 210) To create a 2,787 square foot office tenant space on the 2nd story of an existing high-rise building. Work is to include Nordwall demountable partitions, interior nonrated doors, glass sidelights, and a new fire rated door in the 1-hr corridor wall. The access floor system and the suspended ceilings were installed under permit BLD05-02939. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes. The fire sprinkler system shall comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  11/6/2015 DONE
(F) Reprint permit  8/2/2007 DONE
Second Notice BLD5/9/20075/9/20075/25/2007 DONE
First Notice has not been responded to.
First Notice 4/23/20075/9/2007 DONE
Permanent occupancy  4/23/2007 DONE
Perm. Occ. Cert. # 11538 issued 4-23-07 to the Nature Conservancy/Global Fire in the Banner Bank bldg.
BLD-Final6/28/20066/29/20066/29/2006PPASS
DetailsDave Hannah
greg ; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley ok for perm occ
FIRE-Final Inspection6/28/20066/29/20066/29/2006APASS
DetailsForrest France
Fire life safety is satisfactory, inspection passed.
Permanent Occupancy 6/29/20066/29/2006 DONE
Details
BLD-Framing/Rough-in6/20/20066/21/20066/21/2006APASS
DetailsDave Hannah
Greg; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
Issue PAID IN FULL permit  6/1/2006 DONE
Print Occupancy Form  5/30/2006 DONE
Telephone call  5/30/2006  
called ###-#### (Christensen Corp.) and left voicemessage that permit is ready and fee
Permit Ready to Issue  5/30/2006 DONE
Plan assigned to (CJW)5/11/2006 5/26/2006 PASS
5/26/2006 15:54:46 CJW - activity updated through activity BLDA022 from case BLD06-01340.
Routing - FIRE5/24/2006 5/26/2006 PASS
Attached review comments to plans.
1st review completed  5/26/2006 PASS
Routing - PLAN CHECK5/26/2006 5/26/2006 DONE
PLANS/APPL TAKEN TO FRONT DESK  5/26/2006 DONE
Routing - PLAN CHECK5/11/2006 5/24/2006 PASS
The IBC plan review was started on May 22, 2006 and was finished on May 24, 2006. The drawings were approved.
Routing - PUBLIC WORKS5/11/2006 5/11/2006 PASS
Plans ACCEPTED BY PLAN TECH  5/10/2006  
Application received  5/9/2006  
Recd Pcfee & Taken To Pln CK  5/9/2006 DONE
Third Notice BLD5/25/20075/25/2007   
Second Notice has not been responded to.