BLD-Footing | 9/12/2006 | 9/13/2006 | 9/13/2006 | A | PASS |
Dave Hannah
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|
PubWorks Subgrade Approval | 9/13/2006 | 9/13/2006 | 9/13/2006 | | DONE |
|
|
|
Footing subgrade for front column footing has been approved by the geotechnical engineer with a net allowable sois bearing capacity of 2500 psf
|
BLD-Conference | 9/11/2006 | 9/11/2006 | 9/11/2006 | P | DONE |
Dave Hannah
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|
BLD-Footing | 9/6/2006 | 9/7/2006 | 9/7/2006 | A | PART |
Dave Hannah
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley ok to pour colunms in back
|
PubWorks Subgrade Approval | 9/7/2006 | 9/7/2006 | 9/7/2006 | | PART |
|
|
|
Geotechnical engineer has approved the subgrade for the footing at the rear of the house. The front columns must have roots removed and reinspection from geotech before pouring.
|
BLD-Footing | 9/5/2006 | 9/6/2006 | 9/6/2006 | P | FAIL |
Jim Storey
|
|
|
john; Phone #: ###-#### Note: concrete around 2:00 pm Internet Inspection Request from: Cathy Chiles no pw no insp. no ancer on phone left word.
|
Issue PAID IN FULL permit | | | 6/30/2006 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 6/29/2006 | 6/29/2006 | 6/29/2006 | P | DONE |
|
|
|
6/29/2006 15:30:24 PEP - activity updated through activity BLDA022 from case BLD06-01343.
|
Routing Walk-In (BLD) | 6/28/2006 | 6/28/2006 | 6/29/2006 | P | DONE |
|
|
|
6/29/2006 13:03:25 RAD - activity updated through activity BLDI252 from case BLD06-01343.
|
Case Summary (BLD) | | | 6/29/2006 | | |
|
|
|
|
Inspection Record Card- Bld | | | 6/29/2006 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/29/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/29/2006 | | |
|
|
|
|
Routing Walk-In (BLD) | 5/9/2006 | 5/9/2006 | 6/28/2006 | P | DONE |
|
|
|
6/28/2006 14:23:11 MLS - activity updated through activity BLDI252 from case BLD06-01343.
|
Routing - Erosion and Sediment | 5/10/2006 | | 5/10/2006 | | PASS |
|
|
|
ESC waiver request approved with attached conditions.
|
CHANGE STATUS TO (PND) | | | 5/9/2006 | | |
|
|
|
ROUTING TO STEVE WEBB FOR ESC PLAN WAIVER REQUEST REVIEW.
|
Application received | | | 5/9/2006 | | |
|
|
|
|
Routing - PLAN CHECK | 5/10/2006 | | | | |
|
|
|
|