Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD06-01351
StatusFinaled
Name WEIBYE BRIAN K
Site Address 2927 N CRIBBENS AVE
Project Name 
Customer Number 
ePlanReviewNo
Description
(NO CONTRACTOR REGISTRATION PROVIDED. APPLICANT CERTIFIES EXEMPTION PER IDAHO STATUTE 54-5205) THIS PROJECT IS FOR THE ADDITION OF 920S.F. TO AN EXISTING 860S.F. 1-STORY SINGLE FAMILY DWELLING. THE ADDITION WILL CONSIST OF A NEW MASTER SUITE AND FAMILY ROOM. "The permit holder is responsible to comply with current wall bracing requirements as adopted by Boise City." A NEW EGRESS WINDOW MUST BE ADDED TO THE EXISTING BEDROOM AT THIS ADDITION AND THE MAX. U-VALUE FOR SAME IS .40. R-1C OK PER COLLEEN CARROLL. SEPARATE ELECTRICAL, PLUMBING, MECHANICAL AND esc PERMITS ARE REQUIRED. ALL PER THE APPROVED PLANS AS MARKED RESCHECK AND PLAN REVIEW NOTES. pep
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  4/15/2016 DONE
BLD-Final5/4/20075/7/20075/7/2007APASS
DetailsJim Sly
or ###-#### brian; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
C/C issued
DOC - Permit Finaled5/7/20075/7/20075/7/2007PPASS
DetailsJim Sly
BLD-Final5/3/20075/4/20075/4/2007ANH
DetailsJim Sly
Brian call 30 minutes prior; Phone #: ###-#### Internet Inspection Request from: Andrea Whiteman
Called....never called back...........wrong #
BLD-Final5/1/20075/1/20075/1/2007PNR
DetailsJim Sly
Brian; Phone #: ###-#### Internet Inspection Request from: Andrea Whiteman
Need both Mech permits finaled.
BLD-Final4/30/20075/1/20075/1/2007ANR
DetailsJim Sly
Brian call 30 minutes before; Phone #: ###-#### Internet Inspection Request from: Andrea Whiteman
BLD-Energy code compliance2/6/20072/7/20072/7/2007APASS
DetailsJim Sly
brian Note:please call 1/2 hr prior to inspection to meet with; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Framing/Rough-in1/17/20071/18/20071/18/2007APASS
DetailsJim Sly
BRIAN - PLEASE CALL 30 MIN PRIOR TO INSPECT; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
BLD-Foundation9/11/20069/11/20069/11/2006PPASS
DetailsJim Sly
brian; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
BLD-Foundation8/31/20068/31/20068/31/2006PPASS
DetailsJim Sly
dave; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
BLD-Footing8/29/20068/30/20068/30/2006PPASS
DetailsJim Sly
brian; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
Routing Walk-In (Erosion)5/10/20065/10/20065/31/2006APASS
Routing Walk-In (BLD)5/10/20065/10/20065/10/2006APASS
Plan assigned to (PEP)5/10/2006 5/10/2006 PASS
5/10/2006 09:36:31 PEP - activity updated through activity BLDA022 from case BLD06-01351.
Case Summary (BLD)  5/10/2006  
PLANS/APPL TAKEN TO FRONT DESK  5/10/2006 DONE
Issue PAID IN FULL permit  5/10/2006 DONE
Application received  5/10/2006