VOIDED CHANGE STATUS | | | 10/30/2007 | | DONE |
|
|
|
per letter from Jedd Jones
|
BLD-Aging Inspection | 5/8/2007 | 5/8/2007 | 5/8/2007 | | NR |
Mike Jordan
|
|
|
|
CHANGE STATUS TO (ISS) | | | 5/7/2007 | | DONE |
|
|
|
|
(F) Reprint permit | | | 5/7/2007 | | DONE |
|
|
|
|
Ready Permit EXTENDED | | | 2/26/2007 | | DONE |
|
|
|
Extended permit application by 180 days to May 7, 2007. Original expiration date was November 6, 2007.
|
Telephone call | | | 2/9/2007 | | DONE |
|
|
|
wes edwards at ###-#### permit is ready
|
Telephone call | | | 12/21/2006 | | DONE |
|
|
|
lft ms for westcott edwards ###-#### that permit and fees are ready to picked up
|
Telephone call | | | 10/19/2006 | | DONE |
|
|
|
lft ms for westcott edwards ###-#### that permit and fees are ready to picked up
|
Override - Parcel Holds | | | 10/19/2006 | | |
|
|
|
|
Override - Parcel Holds | | | 10/19/2006 | | |
|
|
|
|
Permit Ready to Issue | | | 10/19/2006 | | DONE |
|
|
|
|
Plan assigned to (JCM) | 10/2/2006 | 10/2/2006 | 10/18/2006 | | PASS |
|
|
|
10/18/2006 09:02:37 JCM - activity updated through activity BLDA022 from case BLD06-01355.
|
Routing - PUBLIC WORKS | 10/17/2006 | | 10/18/2006 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 10/18/2006 | | 10/18/2006 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/18/2006 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 10/18/2006 | | |
|
|
|
|
Override - Parcel Holds | | | 10/18/2006 | | |
|
|
|
|
Inspection Record Card- Bld | | | 10/18/2006 | | DONE |
|
|
|
|
Routing - PLUMBING | 10/11/2006 | | 10/17/2006 | | PASS |
|
|
|
per plans and 2003 upc
|
Routing - PLANNING | 10/9/2006 | | 10/11/2006 | | PASS |
|
|
|
Design Review Modification #1 approved- Josh Wilson
|
Routing - PLAN CHECK | 10/3/2006 | | 10/9/2006 | | PASS |
|
|
|
|
Plan Modification Accepted | | | 10/2/2006 | | |
|
|
|
Plan Modification accepted for Bld06-01355 for the stone wainscott reduced, which reduced stem wall, tenant slab omitted, changed arch. timbers to steel, changed roof material, omitted mechanical mezzanine & moved HVAC units to roof on 3 copies the following sheets: C-3, A1.0, A1.1, A2.1, A2.2, A2.3, A2.4, A3.1, A4.1, A4.2, A5.1, A5.2, A5.3, A5.4, A5.5, A5.6, A7.1, A7.2, A8.3, A8.4, S1.0, S1.1, S1.2, S2.0, S3.0, S3.1, M1.1, M1.2, M3.1, M4.1, P1.1, P1.2, P3.1, P4.1, E2.0L, E2.0P, E2.0,F, E2.1, E3.0, L1.0, L1.1, and 2 copies of structural calculations; routed to John Menard
|
(F) Reprint permit | | | 7/14/2006 | | |
|
|
|
|
Override - Parcel Holds | | | 7/13/2006 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 7/13/2006 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 6/27/2006 | | |
|
|
|
|
Inspection Record Card- Bld | | | 6/27/2006 | | DONE |
|
|
|
|
Telephone call | | | 6/27/2006 | | DONE |
|
|
|
tlk to ruby edwards ###-#### that permit and fees are ready to be picked up but needs RP, GC and copy of ACHD
|
Override - Parcel Holds | | | 6/27/2006 | | |
|
|
|
|
Permit Ready to Issue | | | 6/27/2006 | | |
|
|
|
|
Routing - PUBLIC WORKS | 6/21/2006 | | 6/23/2006 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 6/23/2006 | | 6/23/2006 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/23/2006 | | DONE |
|
|
|
|
Plan assigned to (JCM) | 5/15/2006 | | 6/23/2006 | | PASS |
|
|
|
6/23/2006 13:33:25 JCM - activity updated through activity BLDA022 from case BLD06-01355.
|
Routing - PLAN CHECK | 6/9/2006 | | 6/21/2006 | | |
|
|
|
|
Plan resubmittals received | | | 6/15/2006 | | |
|
|
|
Received 1 transmittal, & 3 copys of sheets C-1,C-2,C-3,C-4,C-5,C-6,C-7 taken to Jim Wylie
|
Routing Off Site - STRUCTURAL | 6/8/2006 | | 6/12/2006 | | PASS |
|
|
|
Called Action Couriers for pick up - Received a faxed letter from the consulting structural engineer approving the resubmittals. JCM
|
Routing - Erosion and Sediment | 6/7/2006 | | 6/9/2006 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Plan resubmittals received | | | 6/7/2006 | | |
|
|
|
Recieved 1pg. letter to John Menard, 1pg. response, 2 sets of 5pg. structural calculations, 3 copies of S1.1; taken to John Menard.
|
Routing - FIRE | 6/2/2006 | | 6/6/2006 | | PASS |
|
|
|
Attached review comments to plans.
|
1st review completed | | | 6/6/2006 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 6/2/2006 | | PASS |
|
|
|
Plans reviewed and approved as submitted with attached comment. JCM
|
Routing - PLAN CHECK | 5/26/2006 | | 6/2/2006 | | PASS |
|
|
|
|
Plan resubmittals received | | | 6/1/2006 | | |
|
|
|
letter from quadrant consulting, 11 pages from erosion & sediment control plan, transmission form, 1 set of c-1 to c7, sheet 1 of 1 p-1-d, sheet 1 of 1 p-1-g, sheet 1 of 2 p-1-h,
|
Plan resubmittals requested | | | 5/31/2006 | | DONE |
|
|
|
Faxed the architect a copy of the comment from the consulting structural engineer requesting revisions. JCM
|
Routing Off Site - STRUCTURAL | 5/15/2006 | | 5/31/2006 | | FAIL |
|
|
|
Called Action Couriers for pick up - Received comment list from the consulting structural engineer requesting revisions. JCM
|
Routing - PLANNING | 5/22/2006 | | 5/26/2006 | | PASS |
|
|
|
DRH05-00225 w/ redline on sheet L1.1 for addition of 5 shrubs around trash enclosure per DR approval
|
Routing - PLUMBING | 5/19/2006 | | 5/22/2006 | | PASS |
|
|
|
see bld06-01356 for comments
|
Routing - Erosion and Sediment | 5/19/2006 | | 5/19/2006 | | FAIL |
|
|
|
ESC plan does not meet requirements per BMC 8-17 and plan designer manual. Checklist completed and faxed to applicant.
|
Routing - PUBLIC WORKS | 5/15/2006 | | 5/19/2006 | | FAIL |
|
|
|
Note revisions plus 10 ft seperation: Contact Brian Murphy ###-####: Portions of the site improvements are located in a floodway zone. Remove Floodway encroachments or request a variance to allow placement of road in the floodway. Contact Jim Wyllie at ###-####
|
Routing - PLANNING Land Div | 5/15/2006 | | 5/15/2006 | | PASS |
|
|
|
property is a platted lot in a subdivision with a parcel number.
|
Recd Pcfee & Taken To Pln CK | | | 5/12/2006 | | DONE |
|
|
|
|
Application received | | | 5/10/2006 | | |
|
|
|
|