Permit Information
Permit NumberBLD06-01360
StatusFinaled
Name JAYO CONSTRUCTION
Site Address 3316 W CRESCENT RIM DR
Project Name 
Customer Number 
ePlanReviewNo
Description
Jayo Construction contractor registration number is RCE-2103. To construct a four bedroom, five and one quarter bathroom 6622 sq. ft. two story single family dwelling (3784 sq. ft. first floor/1475 sq. ft. second floor/1363 sq. ft. FINISHED basement) with two attached two car garages (465 sq. ft. garage one/478 sq. ft. garage two) with a 82 sq. ft. covered deck off bedroom #1, a 143 sq. ft. covered deck off the game room, a 96 sq. ft. covered front porch, a 683 sq. ft. deck off the back of the house and a 683 sq. ft. covered porch off the basement level. Per approved plans, engineering and requirement list. CFH06-00016 per Susan Riggs with Planning and Zoning. This lot is within a hillside area and is subject to the hillside ordinances. A class "A" roof system and defensible area will be maintained. (SAM)
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Grading Inspection9/13/20129/13/20129/13/2012AFAIL
DetailsTerry Records
Permit finaled without Public Works approval of grading.
BLD-Final7/19/20127/20/20128/1/2012PPASS
DetailsTom Arcoraci
Justin-Please call for access information Phone #: ###-####
DOC - Permit Finaled8/1/20128/1/20128/1/2012PPASS
DetailsTom Arcoraci
BLD-Conference7/26/20127/27/20127/27/2012APASS
DetailsTom Arcoraci
Reopen Permit (ISS)  7/19/2012 DONE
DetailsBarbara Stitt
Re=open expired permit for final inspection per Bob Archibald//BAS
Telephone call  4/5/2012 DONE
DetailsTisha Gallop
Jayo Construction called, said he still had original plans and project is done. Told him need to pay 2 hr admin fee on this building permit and need to have E-Zee Elec reopen electrical permit Ele for 2 hr admin fee and need to have Wedge Plumbing reopen plumbing permit Plm for 2 hr admin fee. Terry Records also needs to sign off on building permit before we can issue the residential c of o because he only signed off for part.
BLD-Conference6/24/20106/24/20106/28/2010PPASS
DetailsTom Arcoraci
talked to contractor about finals
BLD-Framing/Rough-in4/16/20074/16/20074/16/2007PPASS
DetailsTom Arcoraci
justin ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
BLD-Framing/Rough-in3/28/20073/29/20073/29/2007APART
DetailsMike Jordan
justin; Phone #: ###-#### Internet Inspection Request from: Victoria Beall. Complete nailing of all simpson hangars. Provide full bearing on columns to concrete footings for elevated decks in back. Install remaining anchor bolts on base plates for TS columns. Complete airseal package prior to insul. Fire block all furouts, mech. chases and above fireplaces. ok to insul AFTER mech ri insp has passed and airseal package complete. c/n posted on window in garage.
BLD-Framing/Rough-in2/9/20072/9/20072/9/2007PPART
DetailsDave Hannah
justin; Phone #: ###-#### Internet Inspection Request from: Patricia Smith walked project with frammers no inspection done waiting for other trades to finish their work
BLD-Footing9/11/20069/12/20069/12/2006APASS
DetailsMike Jordan
Ed; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
PubWorks Subgrade Approval9/11/20069/11/20069/11/2006 PART
FOOTING SUBGRADE FOR THE MASTER BATH, WALK IN CLOSET, NORTH GARAGE, FAMILY ROOM AND CHANGING ROOM HAVE BEEN APPROVED.
BLD-Footing8/21/20068/22/20068/23/2006PPART
DetailsTom Arcoraci
ed; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
PubWorks Subgrade Approval8/23/20068/23/20068/23/2006 PART
The footing subgrade for the east end planter retaining wall and the west footing line for the main house have been approved by the geotechnical engineer.
BLD-Footing8/10/20068/11/20068/11/2006PPART
DetailsTom Arcoraci
ed; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Foundation7/21/20067/24/20067/24/2006APASS
DetailsTom Arcoraci
ed ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Footing7/13/20067/14/20067/14/2006APASS
DetailsMike Jordan
ed ; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
PubWorks Subgrade Approval7/14/20067/14/20067/14/2006 DONE
footing subgrade approved by geotechnical engineer
Issue PAID IN FULL permit  6/16/2006  
Plan assigned to (SAM)5/10/20066/8/20066/15/2006 PASS
6/15/2006 11:32:58 SAM - activity updated through activity BLDA022 from case BLD06-01360.
Routing - PLAN CHECK5/18/2006 6/15/2006 PASS
Case Summary (BLD)  6/15/2006  
PLANS/APPL TAKEN TO FRONT DESK  6/15/2006 DONE
Inspection Record Card- Bld  6/15/2006 DONE
Permit Ready to Issue  6/15/2006 DONE
Telephone call  6/15/2006 DONE
lft ms with secretary ###-#### that permit and fees are ready to be picked up
Plan Reviewer's activity  6/8/2006 DONE
6/8/06 13:10 I called and left Lee Harrison and Shane Jayo messages. I let them know that I have questons on the engineering for this project. Plans are on hold.
Routing - PLANNING5/11/2006 5/18/2006 PASS
Deck in the rear yard may not extend more than 4' into the setback including eaves. I red lined the plans.
Routing - FIRE5/15/2006 5/16/2006 PASS
No fire sprinkler requirements (Crescent Park Sub)
Routing - Erosion and Sediment5/12/2006 5/15/2006 PASS
ESC plan approved with attached conditions.
Routing - PUBLIC WORKS GRADING5/12/2006 5/12/2006 PASS
Approved as Category 1 by CFH06-00016
Routing - PUBLIC WORKS5/12/2006 5/12/2006 PASS
Application received  5/10/2006  
Routing - PLANNING5/18/2006