Second Notice BLD | 4/9/2007 | 4/9/2007 | 4/19/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 3/27/2007 | 4/9/2007 | | DONE |
|
|
|
|
First Notice | | 3/22/2007 | 4/5/2007 | | DONE |
|
|
|
|
BLD-Final | 3/26/2007 | 3/27/2007 | 3/27/2007 | A | PASS |
Dave Hannah
|
|
|
mark ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith ok for perm occ
|
Permanent occupancy | | | 3/27/2007 | | DONE |
|
|
|
Perm. Occ. Cert. # 11499 issued 3-27-07 to the Esther Simplot Performing Arts Academy.
|
CHANGE STATUS TO (ISS) | | | 3/26/2007 | | |
|
|
|
there was never a final bld. inspection - was signed off by mistake
|
FIRE-Final Inspection | 3/21/2007 | 3/22/2007 | 3/22/2007 | A | PASS |
Forrest France
|
|
|
Life safety final inspection passed, noted automatic flush bolts at the inactive leaf on the pair of doors from the studio were not functional-contractor in process of repair to be completed prior to structural final.
|
Permanent occupancy | | | 3/22/2007 | | PASS |
Wm. Michael Meloy
|
|
|
Compliance met.
|
BLD-Other | 2/20/2007 | 2/21/2007 | 2/21/2007 | P | PART |
Dave Hannah
|
|
|
mark - grid inspection; Phone #: ###-#### Internet Inspection Request from: Victoria Beall needs to wire up mec fixtures
|
BLD-Wall cover | 12/20/2006 | 12/21/2006 | 12/21/2006 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/20/2006 at 2:21:56 PM. Contact: ###-####. ok to cover
|
BLD-Framing/Rough-in | 12/13/2006 | 12/14/2006 | 12/14/2006 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/13/2006 at 9:35:48 AM. Contact: ###-####. ok to insulate
|
BLD-Framing/Rough-in | 10/27/2006 | 10/27/2006 | 10/27/2006 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 10/27/2006 at 8:10:59 AM. Contact: ###-####. parapit
|
BLD-Conference | 10/27/2006 | 10/27/2006 | 10/27/2006 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 10/27/2006 at 8:11:32 AM. Contact: ###-####.
|
BLD-Concrete | 10/19/2006 | 10/20/2006 | 10/20/2006 | A | PART |
Dave Hannah
|
|
|
mark; Phone #: ###-#### Internet Inspection Request from: Patricia Smith slab on grade
|
BLD-Foundation | 10/11/2006 | 10/12/2006 | 10/12/2006 | A | PASS |
Dave Hannah
|
|
|
Mark Note: mid morning; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Footing | 10/6/2006 | 10/9/2006 | 10/9/2006 | A | PASS |
Dave Hannah
|
|
|
Mark, late a.m., please; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt ftgs for ramp and stairs
|
BLD-Foundation | 9/7/2006 | 9/7/2006 | 9/7/2006 | P | PASS |
Dave Hannah
|
|
|
mark; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
Telephone call | | | 7/19/2006 | | DONE |
|
|
|
called ###-#### and told Mark Bowen that permit is ready, fee, and need ACHD
|
Permit Ready to Issue | | | 7/19/2006 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 7/19/2006 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/18/2006 | | DONE |
|
|
|
|
Print Occupancy Form | | | 7/18/2006 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 7/6/2006 | | 7/18/2006 | | PASS |
|
|
|
(7-15-06) Reviewed resubmitted structural sheets. Structural concerns were resolved. Waiting for a copy of the ACHD license agreement. (7-18-06) The ACHD license agreement was provided. The drawings were approved.
|
Plan assigned to (CJW) | 5/18/2006 | | 7/18/2006 | | PASS |
|
|
|
7/18/2006 12:50:03 CJW - activity updated through activity BLDA022 from case BLD06-01383.
|
Plan resubmittals received | | | 7/17/2006 | | |
|
|
|
recieved copy of ACHD temporary lisence agreement; taken to Carl Westfall
|
Plan resubmittals received | | | 7/12/2006 | | DONE |
|
|
|
received 1comments , 2 structural calcs, & 2 copys of sheets S5.0,S4.0,S2.0 taken to Carl W.
|
Routing - PLANNING | 7/5/2006 | | 7/6/2006 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 6/21/2006 | | 7/5/2006 | | |
|
|
|
(6-26-06) On hold until resolution of planning and building concerns. (7-5-06) Sent back to Planning
|
Routing Off Site - STRUCTURAL | 6/26/2006 | | 7/3/2006 | | PASS |
|
|
|
Called Action Couriers for pick up (7-3-06) Approved by consultant Structural Engineer.
|
Plan Reviewer's activity | | | 6/26/2006 | | DONE |
|
|
|
Reviewed the submitted items. 3 items were not resolved. One item is pending until the Consultant Engineer had completed his review. E-mailed the Architect and ask for resolution of the other 2 items.
|
Plan resubmittals received | | | 6/23/2006 | | |
|
|
|
Recieved 1 copy of pg S2.0 & S6.0; taken to Carl Westfall
|
Plan resubmittals received | | | 6/22/2006 | | |
|
|
|
Recieved 1pg letter to Carl Westfall from Insight Arch. (Rick Stewart), 1 pg. response, 3 copies of 8pg. structural calculations, 2 copies of the following pages: A0.0, A0.1, AS-1, A1.0, A2.0, A3.0, A4.0, S1.0, S2.0, S3.0, S4.0, S5.0, S6.0, M1.0, M1.1, M2.0, M3.0, M4.0, E1.0, E2.0, E3.0 (all E pages are not stamped or signed by arch./eng.); taken to Carl Westfall.
|
Routing - FIRE | 6/20/2006 | | 6/21/2006 | | PASS |
|
|
|
Attached review comments to plans.
|
1st review completed | | | 6/21/2006 | | FAIL |
|
|
|
Failed Planning and Plan Check.
|
Routing - PLAN CHECK | 6/6/2006 | | 6/20/2006 | | FAIL |
|
|
|
The IBC plan review was started on June 16, 2006 and was finished on June 20, 2006. Revised drawings were required. See the plan review report.
|
Routing - PLANNING | 6/5/2006 | | 6/6/2006 | | FAIL |
|
|
|
Greg Johnson DRH05-00351 - Failed due to changes in elevation design on north, east, and west elevations.
|
Routing - Erosion and Sediment | 6/5/2006 | | 6/5/2006 | | PASS |
|
|
|
ESC waiver request approved with attached conditions.
|
Routing - PUBLIC WORKS | 6/1/2006 | | 6/5/2006 | | PASS |
|
|
|
|
Routing - PLANNING Land Div | 5/18/2006 | | 6/1/2006 | | PASS |
|
|
|
The existing parcel lines show current ownership. A record of survey (3565) was recorded in 1996, however, it was never perfected or completed with the recordation of new deeds. As such, the parcels as currently shown are correct.
|
Routing Off Site - STRUCTURAL | 5/18/2006 | | 6/1/2006 | | FAIL |
|
|
|
First structural review did NOT pass.
|
Plans ACCEPTED BY PLAN TECH | | | 5/12/2006 | | |
|
|
|
|
Application received | | | 5/11/2006 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/11/2006 | | |
|
|
|
|