Case Summary (BLD) | | | 8/21/2012 | | DONE |
|
|
|
|
BLD-Aging Inspection | 4/19/2010 | 4/19/2010 | 4/20/2010 | | DONE |
Tony Young
|
|
|
|
DOC - Permit Finaled | 4/20/2010 | 4/20/2010 | 4/20/2010 | P | PASS |
Tony Young
|
|
|
|
BLD-Aging Inspection | 9/11/2008 | 9/11/2008 | 9/17/2008 | | PEND |
Tony Young
|
|
|
|
BLD-Final | 4/16/2007 | 4/18/2007 | 4/18/2007 | A | PASS |
Tony Young
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles final ok,, will need zoning sooner or later
|
FIRE-Final Inspection | 4/16/2007 | 4/17/2007 | 4/17/2007 | P | PASS |
Forrest France
|
|
|
Life safety field inspection passed.
|
(F) Reprint permit | | | 2/21/2007 | | |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 2/20/2007 | | DONE |
|
|
|
paid for and picked up approved plan mod
|
(F) Reprint permit | | | 2/20/2007 | | |
|
|
|
|
Telephone call | | | 2/16/2007 | | DONE |
|
|
|
called ###-#### and told Ryan McCaene that permit is ready and fee is $447.27//2/16/07 LEG
|
Override - Parcel Holds | | | 2/16/2007 | | |
|
|
|
|
Permit Ready to Issue | | | 2/16/2007 | | DONE |
|
|
|
|
Print Occupancy Form | | | 2/16/2007 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 2/2/2007 | | 2/15/2007 | | PASS |
|
|
|
Route back to Plan Check
|
Routing - Erosion and Sediment | 2/13/2007 | | 2/15/2007 | | PASS |
|
|
|
PLAN MODIFICATION * ESC waiver request approved with attached conditions.
Routing to ESC for the second time. No comments were entered to the permit on January 12th routing.
|
Case Summary (BLD) | | | 2/15/2007 | | DONE |
|
|
|
PLAN MODIFICATION *
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/15/2007 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 2/15/2007 | | |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 2/15/2007 | | DONE |
|
|
|
PLAN MODIFICATION *
|
Plan Reviewer's activity | | | 2/15/2007 | | DONE |
|
|
|
Removed parcel hold on BLDG 8 as of 2/2/07
|
Plan assigned to (M_P) | 11/9/2006 | | 2/15/2007 | | PASS |
|
|
|
2/15/2007 15:55:39 M_P - activity updated through activity BLDA022 from case BLD06-01384.
|
Routing - PLANNING Land Div | 1/31/2007 | | 2/2/2007 | | PASS |
|
|
|
Amended condo drawings match the architectural.
Prior to occupancy, the amended condo documents must be recorded.
|
Routing - PLAN CHECK | 1/16/2007 | | 1/31/2007 | | |
|
|
|
Routing to Subdivision.
|
Routing - PLANNING Land Div | 1/16/2007 | | 1/16/2007 | | FAIL |
|
|
|
Prior to issuance of building permit, applicant must provide revised condominium drawings that match architectural drawings. Called Tim Fox on January16, 2007. No revised condo drawings have been completed on Building 8.
|
Routing - PLAN CHECK | 1/12/2007 | | 1/12/2007 | | |
|
|
|
PLAN MODIFICATION * Routing to ESC.
|
Routing - PLAN CHECK | 12/26/2006 | | 1/12/2007 | | PEND |
|
|
|
PLAN MODIFICATION * Waiting for others to approve prior to issuing permit.
|
Plan resubmittals received | | | 1/2/2007 | | |
|
|
|
Received 1pg. response letter, copy of letter from Mike Phillips to Ryan McCaene, 3 copies of Structural Design Calculations, 3 copies of the following pages: a2.11, a2.12, a2.13, a2.14, a4.10, a4.11, a7.12; taken to Mike Phillips
|
Routing - FIRE | 12/20/2006 | | 12/26/2006 | | PASS |
|
|
|
PLAN MODIFICATION - Attached updated review comment to plans.
|
Routing - PLAN CHECK | 12/4/2006 | | 12/20/2006 | | FAIL |
|
|
|
PLAN MODIFICATION * Sent corrections to the architect requesting additional information to be submitted for further review prior to issuing permit.
|
Case Summary (BLD) | | | 12/20/2006 | | |
|
|
|
|
BLD-Energy code compliance | 12/7/2006 | 12/8/2006 | 12/8/2006 | A | PASS |
Dave Hannah
|
|
|
###-#### - mike
|
Override - Parcel Holds | | | 12/7/2006 | | |
|
|
|
|
Override - Parcel Holds | | | 12/7/2006 | | |
|
|
|
|
BLD-Framing/Rough-in | 12/5/2006 | 12/5/2006 | 12/5/2006 | P | PASS |
Jim Sly
|
|
|
###-#### - mike All framing ok except for bsmnt
|
Override - Parcel Holds | | | 12/5/2006 | | |
|
|
|
|
Override - Parcel Holds | | | 12/5/2006 | | |
|
|
|
|
Routing - PLANNING | 11/27/2006 | | 12/1/2006 | | PASS |
|
|
|
PLAN MODIFICATION
|
BLD-Footing | 11/27/2006 | 11/28/2006 | 11/28/2006 | A | PART |
Tony Young
|
|
|
###-#### - john - porch stair ftgs,, need to get permit for this,, recomend to get soils tested 1st, and plans
|
Routing - PUBLIC WORKS | 11/27/2006 | | 11/27/2006 | | PASS |
|
|
|
PLAN MODIFICATION *
|
Override - Parcel Holds | | | 11/27/2006 | | |
|
|
|
|
Override - Parcel Holds | | | 11/27/2006 | | |
|
|
|
|
Routing - Addressing | 11/24/2006 | | 11/24/2006 | | PASS |
|
|
|
|
Routing - PLANNING Land Div | 11/15/2006 | | 11/22/2006 | | FAIL |
|
|
|
PLAN MODIFICATION * Prior to issuance of building permit, revised condominium drawings shall be provided that show a basement unit for Building #8. The amended condominium plat shall be recorded prior to issuance of an Occupancy Permit.
|
BLD-Energy code compliance | 11/15/2006 | 11/16/2006 | 11/16/2006 | A | PART |
Dave Hannah
|
|
|
Mike ###-#### ok to cover qud 232
|
Override - Parcel Holds | | | 11/15/2006 | | |
|
|
|
|
Override - Parcel Holds | | | 11/15/2006 | | |
|
|
|
|
BLD-Framing/Rough-in | 11/9/2006 | 11/9/2006 | 11/9/2006 | P | PASS |
Tony Young
|
|
|
john; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
Override - Parcel Holds | 1/1/1900 | 1/1/1900 | 11/9/2006 | | |
|
|
|
|
Plan Modification Accepted | | | 11/9/2006 | | |
|
|
|
Plan modification accepted for Bld06-01384 to add the following spaces to existing permit: (2) non-habitable dwelling unit basement spaces. (1) ext. basement access stair. Add (1) basement access stair. Extend existing concrete to sidewalk to ext. basement access stair, on pages a0.11, a0.22, a2.11, a2.12, a2.13, a2.14, a4.10, a4.11, a7.11, a7.12. Also received 2pg. letter to Mike Phillips from Cabal Architects and 3 copies of Structural Design Calculations. Routed to Mike Phillips
|
BLD-Framing/Rough-in | 11/7/2006 | 11/7/2006 | 11/7/2006 | P | NR |
Tony Young
|
|
|
john - quad 232; Phone #: ###-#### Internet Inspection Request from: Patricia Smith need trades 1st,,
|
BLD-Framing/Rough-in | 11/6/2006 | 11/7/2006 | 11/7/2006 | A | NR |
Dave Hannah
|
|
|
John King ###-####//inspection is for quad 232 needs mec r/i and fire caulking around piping in floor
|
Override - Parcel Holds | 1/1/1900 | 1/1/1900 | 11/7/2006 | | |
|
|
|
|
Override - Parcel Holds | | | 11/6/2006 | | |
|
|
|
|
Override - Parcel Holds | | | 8/24/2006 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 8/24/2006 | | DONE |
|
|
|
|
Telephone call | | | 8/21/2006 | | DONE |
|
|
|
tlk to ryan mccarne ###-#### that permit and fees are ready to be picked up
|
Override - Parcel Holds | | | 8/21/2006 | | |
|
|
|
|
Permit Ready to Issue | | | 8/21/2006 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/18/2006 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 8/18/2006 | | |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 8/18/2006 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 8/18/2006 | | DONE |
|
|
|
|
Print Occupancy Form | | | 8/18/2006 | | DONE |
|
|
|
|
Plan assigned to (M_P) | 5/22/2006 | | 8/18/2006 | | PASS |
|
|
|
8/18/2006 15:07:38 M_P - activity updated through activity BLDA022 from case BLD06-01384.
|
Routing - PLAN CHECK | 7/28/2006 | | 8/18/2006 | | PASS |
|
|
|
|
Plan resubmittals received | | | 8/10/2006 | | |
|
|
|
Received 1pg. letter to Mike Phillips from Robert Marcantel w/Cabal Architects, and 3 copies of the following pages: a0.11, a2.12, a2.13, a4.10, a4.11, a7.11; taken to Mike Phillips
|
1st review completed | | | 7/28/2006 | | FAIL |
|
|
|
Failed plan check.
|
Routing - PLAN CHECK | 7/28/2006 | | 7/28/2006 | | |
|
|
|
Routed to Hall Simmons
|
Routing - FIRE | 7/25/2006 | | 7/28/2006 | | PASS |
|
|
|
Attached review comments plans. Red lined notes on plans.
|
Routing - PLANNING | 7/28/2006 | | 7/28/2006 | | PASS |
|
|
|
5/22/06- Unassigned - send to Hal S.
|
Routing - PLAN CHECK | 6/6/2006 | | 7/25/2006 | | FAIL |
|
|
|
Called architect and requested structural drawings to be submitted for review.
|
Case Summary (BLD) | | | 7/25/2006 | | |
|
|
|
|
Plan resubmittals received | | | 6/7/2006 | | |
|
|
|
Recieved letter to Mike P. from Cabal Architects, 1 copy of Involved Parties page from application, 3 copies of the following: a0.11, a0.22, a0.23, a2.11, a2.12, a2.13, a4.10; taken to Mike P.
|
Routing - PUBLIC WORKS | | | 6/6/2006 | | PASS |
|
|
|
|
Routing - PLANNING Land Div | 5/22/2006 | | 5/31/2006 | | PEND |
|
|
|
Pending, do not issue building permit without final approval of a Staff Level Conditional Use Modification. No final occupancy is approved until a amendment to the Condominium Declarations are recorded.
|
Meeting | | | 5/19/2006 | | DONE |
|
|
|
5/19/06-Meeting w/owner, architect, Hal S., Dave A. and Marlene S. Determination made that the following are required prior to issuance of a building permit: a conditional use modification (staff level), recorded amended condo plat and recorded amended declaration for condo plat. Continue to process plans and if listed items are not completed by June 30, 2006 then permit to be voided. (msouthard)
|
Plans ACCEPTED BY PLAN TECH | | | 5/12/2006 | | |
|
|
|
|
Application received | | | 5/11/2006 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/11/2006 | | DONE |
|
|
|
|
First Notice | 4/20/2010 | 4/20/2010 | | | |
Tony Young
|
|
|
|