Permit Information
Permit NumberBLD06-01416
StatusFinaled
Name LA VIE EN ROSE
Site Address 928 W MAIN ST
Project NameIDANHA-1ST FLR
Customer Number 
ePlanReviewNo
Description
KNOTHE ZIOR CASALI CONST// RCE #13544 (LA VIE EN ROSE RESTAURANT - IDANHA 1ST STORY) This building is fire sprinklered for story and height increase. To remodel a 3,561 square foot area on the 1st story of the Idanha building to be used as a restaurant (1,566 square foot kitchen/storage/office area, 1,502 square foot upper seating/bar area, 493 square foot lower seating area). Work is to include a grease hood and duct, kitchen equipment, interior nonbearing walls, millwork alterations, and finishes. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes. The fire sprinkler system shall comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD2/12/20072/12/20073/20/2007 DONE
Second Notice has not been responded to.
Second Notice BLD2/2/20072/2/20072/12/2007 DONE
First Notice has not been responded to.
First Notice 1/10/20072/2/2007 DONE
BLD-Final1/9/20071/10/20071/10/2007APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 1/9/2007 at 12:37:05 PM. Contact: ###-####. ok for perm occ
Permanent Occupancy 1/10/20071/10/2007 DONE
Details
Print Occupancy Form  1/10/2007 DONE
Permanent occupancy  1/10/2007 DONE
Perm. Occ. Cert. # 11391 issued 1-10-07 to La Vie En Rose Restaurant on the 1st floor of the Idanha Bldg.
CHANGE STATUS TO (ISS)  1/9/2007 DONE
BLD-Final8/31/20069/1/20069/1/2006APART
DetailsDave Hannah
andy - call prior to meet there; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley ok for temp occ needs to remove bolt on door
FIRE-Final Inspection8/31/20068/31/20068/31/2006PPASS
DetailsForrest France
Items on previous c/n have been verified for completion, inspeciton passed.
FIRE-Final Inspection8/30/20068/30/20068/30/2006PFAIL
DetailsForrest France
Need to post max. occupant load sign per review comments, repair door leaf at the north entry/exit doors, install missing ceiling tile and sprinkler escutcheon at the dry storage room, provide one additional PFE for the back office and storage area as discussed.
BLD-Framing/Rough-in8/22/20068/22/20068/22/2006PPASS
DetailsDave Hannah
andy - ceiling; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley ok to cover ceiling
BLD-Framing/Rough-in8/15/20068/16/20068/16/2006APART
DetailsDave Hannah
andy - call prior for access (ceiling grid insp); Phone #: ###-#### Internet Inspection Request from: Barbara Buckley grid ok but need to fix holes in ceiling
Routing - PLAN CHECK6/23/2006 6/26/2006  
PLANS/APPL TAKEN TO FRONT DESK  6/26/2006 DONE
Print Occupancy Form  6/26/2006 DONE
Permit Ready to Issue  6/26/2006 DONE
Telephone call  6/26/2006 DONE
tlk to lori ###-#### that permit and fees are ready to be picked up
Issue PAID IN FULL permit  6/26/2006 DONE
Plan assigned to (CJW)5/22/2006 6/26/2006 PASS
6/26/2006 08:43:13 CJW - activity updated through activity BLDA022 from case BLD06-01416.
Routing - PLAN CHECK6/20/2006 6/23/2006 PASS
(6-21-06) Drawings approved after resubmittal review. (6-23-06) Drawings sent back to fire after the resubittal was received.
Routing - FIRE6/23/2006 6/23/2006 PASS
Attached review comments to plans.
Plan resubmittals received  6/23/2006  
recieved 3 copies of M1.1; taken to Carl Westfall
Plan resubmittals received  6/21/2006 DONE
Received 1 Project letter,1 Bar Store Restaurant Design & Supplies. taken to Carl W.
Routing - PLAN CHECK6/19/2006 6/20/2006  
Sent back to fire
Routing - FIRE6/20/2006 6/20/2006 FAIL
Faxed resubmittal items to architect. Attached review comments to plans.
Telephone call  6/20/2006 DONE
Spoke with kitchen supplier. Described in detail what is necessary for the review to be completed regarding the product information of the type 1 hood assembly.
Routing - PLUMBING6/8/2006 6/19/2006 PASS
Big dipper now shown on plan, also Plumber to connect owner suppied kitchen equipment plumbing. Approved per plan and 2003 UPC
Plan resubmittals received  6/13/2006  
received "3" sheets of A2.1, "3" sheets of M1.1 with project letter, report etl testing inc cover letter & page 2 & 10, conclusion page c1, memorandum (3 pages)
Routing - PUBLIC WORKS6/7/2006 6/8/2006 PASS
Plan resubmittals received  6/7/2006 DONE
Received 1 project letter, & 1 elevation of new opening in existing masonary wall. taken to Carl W.
Routing - FIRE6/2/2006 6/7/2006 FAIL
Faxed resubmittal requirements to architect. Attached review comment to plans.
1st review completed  6/7/2006 DONE
Routing - PLAN CHECK5/25/2006 6/2/2006 FAIL
The IBC plan review was started on May 31 and was finished on June 2. Revise drawings were required. See the plan review report.
Plan resubmittals received  5/31/2006 DONE
Received 1 transmittal & 3 copys of sheet P1.1 taken to Carl W.
Routing - PLUMBING5/23/2006 5/25/2006 FAIL
rerout to plumbing after public works pretreatment approval.
Routing - PUBLIC WORKS5/22/2006 5/23/2006 FAIL
Need to provide grease abatement information. Contact Mike Hunter at ###-####
Plans ACCEPTED BY PLAN TECH  5/17/2006  
Recd Pcfee & Taken To Pln CK  5/17/2006  
Application received  5/16/2006