Permit Information
Permit NumberBLD06-01424
StatusFinaled
Name STEED CONSTRUCTION
Site Address 7940 W RIFLEMAN ST
Project NameTowne Square Station
Customer Number 
ePlanReviewNo
Description
(RCE-2056)Towne Square Station - Building "A" (Shell Only) - To construct a new 13,550 square foot, one story, wood framed retail shell building and related site improvements. This is a shell permit only and no occupancy is allowed under this pemit. Separate tenant improvement permits will be required to finish this building for occupancy. All construction per the approved plans. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 7/26/20107/29/2010 DONE
First Notice6/30/20106/30/20107/16/2010 DONE
DetailsMike Jordan
BLD-Final6/30/20106/30/20106/30/2010PPASS
DetailsMike Jordan
odie Phone #: ###-####
DOC - Permit Finaled6/30/20106/30/20106/30/2010PPASS
DetailsMike Jordan
Letter of compliance was issued.
BLD-Energy code compliance6/30/20106/30/20106/30/2010PPASS
DetailsMike Jordan
odie Phone #: ###-####
FIRE-Final Inspection6/29/20106/30/20106/30/2010APASS
DetailsTroy Cobbley
Life safety passed. Per Scott the fire hydrant was previously approved to be relocated from the position shown on the approved plans to the location near Emerald.
Override - Parcel Holds6/30/20101/1/19006/30/2010  
on the shell - not the t.i.
Override - Parcel Holds6/29/20101/1/19006/29/2010  
fire life safety
BLD-Aging Inspection5/24/20105/24/20105/27/2010 PASS
DetailsMike Jordan
Spoke to odie with Steed const. He noted that he has pulled 2 vanilla finish prmits for bldg. and is aware that shell and core has not yet been finaled. Odie noted that he will complete shell and core along with ti permits.
BLD-Conference2/25/20082/25/20082/25/2008PDONE
DetailsMike Jordan
Called Steed const. and left message with front desk to have person in charge of project contact me so that remaining issues can be resolved and get shell and core finaled.
Code Occupancy Approval4/6/20074/6/20074/6/2007PPASS
DetailsScott M.Brown
OK FOR FINAL SIGNED OFF
FIRE-Final Inspection4/4/20074/4/20074/4/2007AFAIL
DetailsTroy Cobbley
Need the fire alarm and fire sprinkler permits finaled as well as the knox box and signage on the riser room door.
BLD-Framing/Rough-in12/5/200612/5/200612/5/2006PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 12/5/2006 at 10:10:23 AM. Contact: ###-####.
BLD-Framing/Rough-in10/30/200610/30/200610/30/2006APART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 10/30/2006 at 7:22:50 AM. Contact: ###-####. Shear nailing on roof and shear walls. All hardware installed. Also reviewed rfi on built up ledgers on north wall.
BLD-Aging Inspection10/26/200610/26/200610/26/2006 PASS
DetailsMike Jordan
wip
(F) Reprint permit  7/28/2006  
Issue PAID IN FULL permit  7/27/2006 DONE
Inspection Record Card- Bld  7/11/2006 DONE
Telephone call  7/11/2006  
tlk to wes steele ###-#### that permit and fees are ready to be picked up
Permit Ready to Issue  7/11/2006 DONE
Routing - PLAN CHECK7/7/2006 7/10/2006  
PLANS/APPL TAKEN TO FRONT DESK  7/10/2006  
Plan assigned to (JCM)5/18/2006 7/10/2006 PASS
7/10/2006 08:52:19 B_S - activity updated through activity BLDA022 from case BLD06-01424.
Routing - PUBLIC WORKS7/7/2006 7/7/2006 PASS
Routing - PLAN CHECK6/12/2006 6/20/2006  
Routing - PLANNING6/20/2006 6/20/2006 PASS
Routing Off Site - STRUCTURAL6/15/2006 6/20/2006 PASS
Received letter from consulting structural engineer approving resubmitted plans. JCM
Plan resubmittals received  6/15/2006  
Received 1 copy of cover transmittal letter, 1 copy of 1 page letter to John M from TRU Engineering, 3 copies of additional calculations, 4 copies of the following sheets- S-1, S-2, S-3, S-6 and taken to John Menard
1st review completed  6/12/2006 FAIL
Failed Structural.
Routing - FIRE6/8/2006 6/12/2006 PASS
Attached review comments to plans.
Routing - PLAN CHECK6/7/2006 6/8/2006 PASS
John M.
Routing - PLANNING6/5/2006 6/7/2006 PASS
Julie A.
Routing - PLUMBING5/23/2006 6/5/2006 PASS
per plans and 2003 upc
Plan Reviewer's activity  6/5/2006 PASS
Plans reviewed and approved as submitted. JCM
Routing Off Site - STRUCTURAL5/18/2006 6/1/2006 FAIL
Called Action Courers for pick up - Received comment list from the consulting structural engineer requesting revisions. JCM
Plan resubmittals requested  6/1/2006 DONE
Faxed the architect a copy of the comment list from the consulting structural engineer requesting revisions. JCM
Routing - PUBLIC WORKS5/19/2006 5/23/2006 FAIL
Will need street lights on W. Emerald St and additional street lights on W. Rifleman Street. Please submit 3 sets of street lighting plans to Bill Colson. ###-####
Routing - PLANNING Land Div5/18/2006 5/19/2006 PASS
Routing - Erosion and Sediment5/18/2006 5/18/2006 PASS
ESC plan approved with attached conditions. Refer to ESC06-00115 as master ESC plan for project.
Plans ACCEPTED BY PLAN TECH  5/18/2006  
Plan routing begun/NEW & ADDTN  5/18/2006  
Application received  5/17/2006