Third Notice BLD | 3/5/2008 | 3/5/2008 | 7/14/2008 | | DONE |
Cathy Brown
|
|
|
Second Notice has not been responded to.
|
Telephone call | | | 5/14/2008 | | DONE |
|
|
|
lft ms for erick payne for final values varies for subcontractors
|
Second Notice BLD | 2/6/2008 | 2/6/2008 | 3/5/2008 | | DONE |
Cathy Brown
|
|
|
First Notice has not been responded to.
|
First Notice | | 1/14/2008 | 2/6/2008 | | DONE |
|
|
|
|
Permanent Occupancy | | | 1/14/2008 | | DONE |
|
|
|
|
BLD-Final | 1/3/2008 | 1/4/2008 | 1/5/2008 | P | PASS |
Dave Hannah
|
|
|
eric Phone #: ###-#### ok for perm occ
|
BLD-Final | 1/2/2008 | 1/2/2008 | 1/2/2008 | P | FAIL |
Jim Storey
|
|
|
eric Phone #: ###-#### bathroom exust ducts cannot termanate on west wall./lock unlock indacator on dead bolt.
|
FIRE-Final Inspection | 12/31/2007 | 1/2/2008 | 1/2/2008 | A | PASS |
Forrest France
|
|
|
Items on correction notice verified for completion, life safety inspection passed.
|
FIRE-Final Inspection | 12/28/2007 | 12/31/2007 | 12/31/2007 | A | FAIL |
Forrest France
|
|
|
Provide building address numbers per requirements, post "door to remain unlocked while building is occupied" signage at the main entry/exit door, need approved hardware installed at the office, attatch cover plate for the open electrical junction box at the furnace room.
|
BLD-Final | 12/20/2007 | 12/21/2007 | 12/21/2007 | A | NR |
Dave Hannah
|
|
|
Erik Phone #: ###-#### needs other trades signed off
|
BLD-Energy code compliance | 4/26/2007 | 4/27/2007 | 4/27/2007 | P | PASS |
Dave Hannah
|
|
|
Matt; Phone #: ###-#### Internet Inspection Request from: Victoria Beall ok to cover
|
BLD-Framing/Rough-in | 3/13/2007 | 3/14/2007 | 3/14/2007 | A | PART |
Jim Storey
|
|
|
erik -; Phone #: ###-#### Internet Inspection Request from: Victoria Beall pending wall exterior infil and trade aproval ok to insulate.
|
BLD-Aging Inspection | 11/15/2006 | 11/15/2006 | 11/20/2006 | | PASS |
Dave Hannah
|
|
|
|
Issue PAID IN FULL permit | | | 8/16/2006 | | DONE |
|
|
|
|
Print Occupancy Form | | | 8/8/2006 | | DONE |
|
|
|
|
Telephone call | | | 8/8/2006 | | DONE |
|
|
|
lft vm with andrew davis ###-#### that permit and fees are ready to be picked up but needs GC and RCE #
|
Permit Ready to Issue | | | 8/8/2006 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 6/21/2006 | | 8/7/2006 | | PASS |
|
|
|
|
Plan resubmittals received | | | 8/7/2006 | | |
|
|
|
Received 1 cover transmittal, a 2 page letter from BRS, 2 pages from Pilkington Pyrostop (Fire Info), 3 copies of A-1 and taken to Ron Hill
|
Case Summary (BLD) | | | 8/7/2006 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/7/2006 | | DONE |
|
|
|
|
Plan assigned to (R_H) | 5/25/2006 | | 8/7/2006 | | PASS |
|
|
|
8/7/2006 15:44:12 RMH - activity updated through activity BLDA022 from case BLD06-01439.
|
Routing - FIRE | 6/20/2006 | | 6/21/2006 | | PASS |
|
|
|
Attached review coments to plans.
|
1st review completed | | | 6/21/2006 | | PASS |
|
|
|
|
Case Summary (BLD) | | | 6/20/2006 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 5/30/2006 | | 6/20/2006 | | FAIL |
|
|
|
faxed and mailed requirements to the architect on 6/19/06. Routed plans to fire on 6/20/06
|
Routing - PUBLIC WORKS | 5/26/2006 | | 5/30/2006 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/19/2006 | | |
|
|
|
|
Application received | | | 5/18/2006 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/18/2006 | | DONE |
|
|
|
|