First Notice | | 7/23/2009 | 8/5/2009 | | DONE |
|
|
|
|
Permanent Occupancy | | | 7/23/2009 | | DONE |
|
|
|
|
FIRE-Final Inspection | 7/13/2009 | 7/14/2009 | 7/14/2009 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed.
|
BLD-Final | 2/27/2009 | 2/27/2009 | 3/2/2009 | A | CANC |
Dave Hannah
|
|
|
|
BLD-Final | 2/26/2009 | 2/26/2009 | 2/26/2009 | A | PART |
Dave Hannah
|
|
|
Dave; We have all the signatures for this permit. Can we get the Temp.Oc. today?
Thanks, Bob Phone #: ###-#### Internet Inspection Request from: bob austin ok for temp occ ok for perm occ after fire gos perm
|
FIRE-Final Inspection | 2/25/2009 | 2/26/2009 | 2/26/2009 | A | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given until the project related fire alarm permit is finaled. Life safety items will be ok to pass at that time.
|
FIRE-Final Inspection | 2/23/2009 | 2/24/2009 | 2/25/2009 | A | FAIL |
Troy Cobbley
|
|
|
Life safety items are ok. Just waiting for the fire alarm resubmittals which were required due to changes/additional devices.
|
FIRE-Final Inspection | 2/24/2009 | 2/24/2009 | 2/24/2009 | A | DONE |
Scott Arellano
|
|
|
Emergency egress lighting and generator satisfactory.
|
PubWorks Occupancy Approval | 2/18/2009 | 2/18/2009 | 2/18/2009 | | DONE |
|
|
|
|
Zoning Approval | 2/11/2009 | 2/11/2009 | 2/11/2009 | | PASS |
Cody Riddle
|
|
|
|
BLD-Framing/Rough-in | 11/20/2008 | 11/21/2008 | 11/22/2008 | A | PART |
Dave Hannah
|
|
|
Dave; Could we get a re-inspect for the lower units( C3,4,5)? Bob Phone #: ###-#### Internet Inspection Request from: bob austin ok to cover lids c3,4,5 level 1 ok to cover drops level 6 ok to start insulating roof /ceiling level7
|
BLD-Framing/Rough-in | 10/10/2008 | 10/10/2008 | 10/13/2008 | A | PART |
Dave Hannah
|
|
|
Dave; Could you do a framing inspection for the trash room, generator room, pump room, and mechanical rooms on levels P1,2,3.
Bob Phone #: ###-#### Internet Inspection Request from: bob austin ok to cover
|
BLD-Framing/Rough-in | 8/20/2008 | 8/20/2008 | 8/21/2008 | A | PART |
Dave Hannah
|
|
|
Dave; I would like to cover one side of the Trash Room wall;metal studs in garage.Two of the walls are shaft liner,no rough-in in them. Other walls have rough-in,will do one side only. Thanks, Bob Phone #: ###-#### Internet Inspection Request from: bob austin ok to cover this area
|
BLD-Framing/Rough-in | 8/20/2008 | 8/20/2008 | 8/21/2008 | P | CANC |
Dave Hannah
|
|
|
Dave; I would like to cover one side of the Trash Room wall;metal studs in garage.Two of the walls are shaft liner,no rough-in in them. Other walls have rough-in,will do one side only. Thanks, Bob Phone #: ###-#### Internet Inspection Request from: bob austin ok to cover this area
|
BLD-Concrete | 2/12/2008 | 2/13/2008 | 2/13/2008 | P | PART |
Dave Hannah
|
|
|
Rebar,tendon inspection for L3 PT slab. Phone #: ###-#### Internet Inspection Request from: bob austin
|
BLD-Conference | 2/8/2008 | 2/11/2008 | 2/12/2008 | P | PASS |
Dave Hannah
|
|
|
Dave; Have you had a chance to check on the framing detail where the 1hr floor meets the 2hr shaft. You were going to run it by George and/or Marlene, I think. Let me know. Thanks, Bob Phone #: ###-#### Internet Inspection Request from: bob austin
|
BLD-Conference | 2/5/2008 | 2/5/2008 | 2/5/2008 | P | DONE |
Dave Hannah
|
|
|
Dave; If possible,could you stop by the job between 1-2:45pm and look over a couple details the arch. was needing OKed.If this time frame is good today,we could get together tomorrow. Thanks, Bob Phone #: ###-#### Internet Inspection Request from: bob austin
|
BLD-Conference | 1/23/2008 | 1/23/2008 | 1/23/2008 | P | DONE |
Jim Storey
|
|
|
Dave; I have a couple quick questions on framing I need to run by you. Could we meet at job trailer some time today? Bob Phone #: ###-#### Internet Inspection Request from: bob austin Architect to provide new wall details for approval.......or Call Dave
|
BLD-Conference | 12/28/2007 | 1/3/2008 | 1/3/2008 | A | DONE |
Dave Hannah
|
|
|
Owner,Arch.,framer,myself would like to meet to go over some possible question/problem areas with reguard to framing.If possible,10:30 at 420 Main St.,suite 202(Veltex Bldg.)Let me know if this time is a problem. Thanks, Bob Phone #: ###-#### Internet Inspection Request from: bob austin
|
BLD-Foundation | 12/26/2007 | 12/27/2007 | 12/28/2007 | A | PART |
Dave Hannah
|
|
|
Wall rebar for L2.MTI will inspect.
Thanks, Bob Phone #: ###-#### Internet Inspection Request from: bob austin
|
BLD-Foundation | 12/12/2007 | 12/12/2007 | 12/13/2007 | P | PART |
Dave Hannah
|
|
|
Rebar for L1 walls. MTI will inspect.
Thanks, Bob Phone #: ###-#### Internet Inspection Request from: bob austin
|
BLD-Foundation | 12/4/2007 | 12/4/2007 | 12/4/2007 | P | PART |
Dave Hannah
|
|
|
Rebar for L1 walls; MTI will inspect also.
Thanks, Bob Phone #: ###-#### Internet Inspection Request from: bob austin
|
BLD-Conference | 11/28/2007 | 11/29/2007 | 11/29/2007 | A | PASS |
Dave Hannah
|
|
|
Conference with subs on floor/wall penetrations at 10:00 am. Have confirmed with Dave Hannah. Thanks, Bob fire protection Thanks, Bob Phone #: ###-#### Internet Inspection Request from: bob austin
|
BLD-Foundation | 11/19/2007 | 11/19/2007 | 11/19/2007 | P | PART |
Jim Storey
|
|
|
P1 wall rebar-MTI will inspect. pending reports
Thanks, Bob Phone #: ###-#### Internet Inspection Request from: bob austin
|
BLD-Foundation | 11/1/2007 | 11/1/2007 | 11/2/2007 | P | PART |
Dave Hannah
|
|
|
Rebar for walls at P2 level.MTI will inspect.
Thanks, Bob Phone #: ###-#### Internet Inspection Request from: bob austin
|
BLD-Concrete | 10/25/2007 | 10/26/2007 | 10/26/2007 | P | PASS |
Dave Hannah
|
|
|
This is for post-tensioned(PT)slab P1.All rebar and tendons have been inspected by MTI.
Thanks Phone #: ###-#### Internet Inspection Request from: bob austin
|
BLD-Foundation | 10/12/2007 | 10/12/2007 | 10/12/2007 | P | PART |
Dave Hannah
|
|
|
Level 2 wall rebar. My appologies;I failed to notify you of a floor pour on Oct.5th.I was out of town from Oct.3rd-8th.It was inspected by MTI and structural engineer from Seatle. Phone #: ###-#### Internet Inspection Request from: bob austin
|
BLD-Foundation | 8/31/2007 | 9/4/2007 | 9/4/2007 | A | PART |
Dave Hannah
|
|
|
Rebar for walls - special inspection will do also. Phone #: ###-#### Internet Inspection Request from: bob austin
|
BLD-Foundation | 8/14/2007 | 8/15/2007 | 8/15/2007 | A | PART |
Dave Hannah
|
|
|
Wall rebar Phone #: ###-#### Internet Inspection Request from: bob austin rebar ok crew still setting forms spec inspection will final befor pour
|
BLD-Footing | 8/2/2007 | 8/3/2007 | 8/3/2007 | A | PART |
Tony Young
|
|
|
Phone #: ###-#### Internet Inspection Request from: bob austin pending S.I. report
|
BLD-Other | 7/24/2007 | 7/25/2007 | 7/25/2007 | P | PART |
Dave Hannah
|
|
|
around 2 if possible please---Re-bar walls and 4 column footings only please--###-####spec inpection on site
|
CHANGE STATUS TO (ISS) | | | 7/25/2007 | | DONE |
|
|
|
Called Dave and told him plan mod is ready & fees///7/25/07 @ 8:30am BAS
|
(F) Reprint permit | | | 7/25/2007 | | DONE |
|
|
|
|
Print Occupancy Form | | | 7/25/2007 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 7/24/2007 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/24/2007 | | DONE |
|
|
|
PLAN MODIFICATION approved and taken to permit desk.
|
Permit Ready to Issue | | | 7/24/2007 | | |
|
|
|
|
Plan assigned to (M_P) | 6/28/2007 | | 7/24/2007 | | DONE |
|
|
|
PLAN MODIFICATION for slab and wall changes submitted. Sent to outside engineering for review.
7/19/07: Outside review completed and approved.
|
Routing - PLAN CHECK | 6/28/2007 | | 7/24/2007 | | PASS |
|
|
|
PLAN MODIFICATION for minor structural changes sent to outside engineering for review on 6/29/07.
7/24/07: Plan mod approved by outside engineer. Plans taken to permit desk to issue and collect fees.
|
Routing Off Site - STRUCTURAL | 7/19/2007 | | 7/19/2007 | | PASS |
|
|
|
Called Action Courier for pick up on 7/19/07 @ 12:27pm BAS
|
Plan resubmittals received | | | 7/19/2007 | | |
|
|
|
received 1 transmittal,1 response,1 supplemental calcs and 1 copy of sheets S2.03-F ,S3-03A taken to Mike P.
|
Plan resubmittals received | | | 7/18/2007 | | |
|
|
|
received 1 transmittal,2 response for plan mod and 2 copys of sheets S3.03A,S2.03-F taken to Mike P.
|
BLD-Foundation | 7/12/2007 | 7/17/2007 | 7/17/2007 | A | PART |
Dave Hannah
|
|
|
Rebar please @ Gridline 1 & M & A- ###-#### Bob Austin spec inspection on site
|
BLD-Footing | 7/12/2007 | 7/17/2007 | 7/17/2007 | A | PART |
Dave Hannah
|
|
|
Footing @ area D & H around 10 if possible ###-#### Bob Austin spec inspection on site
|
Override - Parcel Holds | | | 7/12/2007 | | |
|
|
|
|
Override - Parcel Holds | | | 7/12/2007 | | |
|
|
|
|
BLD-Footing | 6/29/2007 | 7/3/2007 | 7/3/2007 | P | PART |
Dave Hannah
|
|
|
Around 1:30 if possible please--###-#### Bob ok to pour first section of basement wall ftg
|
Routing Off Site - STRUCTURAL | 6/29/2007 | | 7/3/2007 | | FAIL |
|
|
|
PLAN MODIFICATION with minor structural changes sent to outside engineering for review on 6/29/07. Plan sheets only, no calcs.
E-mailed copy of structural review to the architect. Requested additional information to be submitted for further review and approval.
|
Override - Parcel Holds | | | 6/29/2007 | | |
|
|
|
|
Plan Modification Accepted | | | 6/28/2007 | | DONE |
|
|
|
PLAN MODIFICATION accepted for Structural revisions to slab and walls, Elevator removed, exterior shaft added. revised sheets are S1.00,1.01,2.00-F, 2.01-R,S2.02-F, S2.02-R, S2.03-F, S2.02-R, 2.03-F, S2.03-R, S3.00, S3.01, S3.02, S3.03, S3.03A, S3.04, S3.05, S4.00, S4.01, S4.02, S4.03 & S4.04 Routed to Mike P.
|
Plan resubmittals received | | | 6/27/2007 | | DONE |
|
|
|
received 1 copy of sheets S1.00,S1.01,S2.00-F,S2.01-F,S2.01-R,S2.02-F,S2.02-R,S2.03-F,S2.03-R,S3.00,S3.01,S3.02,S3.03,S3.03A,S3.04,S3.05,S4.00,S4.01,S4.02,S4.03,S4.04 PLANS ISSUED 4-25-07 TAKEN TO MIKE P.
|
(F) Reprint permit | | | 4/26/2007 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 4/25/2007 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/17/2007 | | |
|
|
|
|
Permit Ready to Issue | | | 4/17/2007 | | DONE |
|
|
|
|
Telephone call | | | 4/17/2007 | | |
|
|
|
left mess that permit is ready with matt at ###-####
|
Routing - PLAN CHECK | 4/13/2007 | | 4/16/2007 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/16/2007 | | DONE |
|
|
|
|
Plan assigned to (M_P) | 5/22/2006 | | 4/16/2007 | | PASS |
|
|
|
4/16/2007 14:46:41 M_P - activity updated through activity BLDA022 from case BLD06-01450.
|
Routing - PLUMBING | 4/12/2007 | | 4/13/2007 | | PASS |
|
|
|
per plans and 2003 upc
|
Routing - PLAN CHECK | 4/9/2007 | | 4/12/2007 | | |
|
|
|
Routing to Plumbing.
|
Plan resubmittals received | | | 4/12/2007 | | |
|
|
|
received transmittal letter from erstad arch & "2" sheets each of C2.O--plans taken to Mike Phillips
|
Routing - PLANNING | 4/6/2007 | | 4/9/2007 | | PASS |
|
|
|
Construction must comply with the requirements of CUP, DR and DA approvals.
|
Routing - PLAN CHECK | 4/6/2007 | | 4/6/2007 | | |
|
|
|
Routing to Planning.
|
Routing - PLUMBING | 4/4/2007 | | 4/6/2007 | | FAIL |
|
|
|
Insert plans and route to Plumbing. 6" sewer is too small.
|
Routing - PLAN CHECK | 4/4/2007 | | 4/4/2007 | | |
|
|
|
Routing to Plumbing.
|
Plan resubmittals received | | | 4/4/2007 | | |
|
|
|
Received 1 cover transmittal, 2 copies of sheets A005, A006, A704 and taken to Mike Phillips
|
Routing - PLANNING | 3/30/2007 | | 4/4/2007 | | FAIL |
|
|
|
Contacted developer; Need a final, recorded copy of the approved landscape easement.
|
Plan resubmittals received | | | 4/2/2007 | | |
|
|
|
Received 1 cover transmittal and 3 copies of sheets M100, M201 and M202 and taken to Mike Phillips
|
Plan resubmittals received | | | 3/30/2007 | | |
|
|
|
Received 1 cover transmittal, 4 copies of A300, 3 copies of A301 and taken to Mike Phillips
|
Routing - PLAN CHECK | 1/31/2007 | | 3/30/2007 | | |
|
|
|
Routing to Planning.
|
Plan resubmittals received | | | 3/8/2007 | | |
|
|
|
received erosion & sediment control permit & "2" sets of structural calculations. also "2" sheets of S-1/plans taken to mike phillips
|
Routing - PLANNING | 1/29/2007 | | 1/31/2007 | | FAIL |
|
|
|
Building elevations do not match those approved by DR. Applicant contacted via email today.
|
Routing - PLAN CHECK | 1/16/2007 | | 1/29/2007 | | |
|
|
|
Routing to Planning.
|
Routing - PLAN CHECK | 12/21/2006 | | 1/16/2007 | | |
|
|
|
Routing to Land Division
|
Routing - PLANNING Land Div | 1/16/2007 | | 1/16/2007 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 12/19/2006 | | 12/21/2006 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 11/28/2006 | | 12/19/2006 | | |
|
|
|
Routing to P.W.
|
Routing - PLUMBING | 11/28/2006 | | 11/28/2006 | | FAIL |
|
|
|
Only one of 6 corrections requested on plumbing plan review of 6/21/2006 were corrected on resubmittal. Called mechanical engineer and left message and faxed original copy of plumbing plan review from 6/21/2006. did not contact architect this time.
|
Routing - FIRE | 11/22/2006 | | 11/28/2006 | | PASS |
|
|
|
Attached updated review comments to the plans.
|
Routing - PLANNING Land Div | 11/20/2006 | | 11/22/2006 | | FAIL |
|
|
|
ROS06-00041 not completed. Need copies of recorded notice of buildable parcels, recorded deed and new tax parcel number.
|
Routing - PLANNING | 11/20/2006 | | 11/20/2006 | | FAIL |
|
|
|
The applicant has not submitted the lic. agreement or landscape easement as required by the CUP.
|
Routing - PLAN CHECK | 9/29/2006 | | 11/20/2006 | | |
|
|
|
Routing to Planning, Plumbing, Land Division and Fire
|
Routing - PLAN CHECK | 7/26/2006 | | 9/29/2006 | | FAIL |
|
|
|
Second review failed. Sent correction report to the architect requesting additional information to be submitted for further review prio to issuing permit.
|
Plan resubmittals received | | | 9/13/2006 | | DONE |
|
|
|
ReceiveD\d 4 copys of sheets A206,A311,A801,A822,S1-00,S1-01,S2-00F,S2-01F,S2-02R,S2-02F,S2-02R,S2-03F,S2-03R,S2-04,S2-05,S2-06,S2-08,S3-03A,S4-03,S5-00,S5-01,S5-03 inserted into plans and taken back to Mike P.
|
Routing Off Site - STRUCTURAL | | | 9/11/2006 | | PASS |
|
|
|
Received date unknown as revised structural sent directly to Boise's contract engineer by the designing engineer. Revisions were approved on 9/11/06.
|
Plan resubmittals received | | | 8/10/2006 | | |
|
|
|
received transmittal sheet from erstad architects & 14 pages from driscoll architects regarding response to corrections, & "2" sets of plans including cover sheet, wp1, wp 2, wp3, wp4, wp5, wp6, A001, a002a, a002b, a003, a004, a100, a200, a201, a202, a203, a204, a205, a206, a220, a221, a222, a223, a224, a240, a241, a250, a251, a252, a300, a301, a310, a311, a312, a360, a361, a362, a500, a501, a700, a701, a702, a703, a704, a710, a800, a801, a802, a810, a811, a820, a821, a822, a900, a901, a902, s1.00, m102 & m201--plans taken to mike phillips
|
Routing Off Site - STRUCTURAL | 7/18/2006 | | 8/9/2006 | | FAIL |
|
|
|
Called Action Couriers for pick up
Second review failed.
|
1st review completed | | | 7/26/2006 | | FAIL |
|
|
|
Failed Planning,Plumbing & Fire.
|
Routing - FIRE | 7/21/2006 | | 7/26/2006 | | FAIL |
|
|
|
Faxed resubmittal item to Matt Driscoll @ 1-###-####. Inserted review comments into plans.
|
Routing - PLAN CHECK | 6/27/2006 | | 7/21/2006 | | FAIL |
|
|
|
Plan review completed, sent correction report to the architect requesting additional informaiton be subnmitted for further review prior to issuing permit.
|
Plan resubmittals received | | | 7/13/2006 | | |
|
|
|
Received 1 copy of cover transmittal, 3 copies of Review comments, 4 copies each of the following sheets--A206, S1.00, S1.01, S2.00F, S2.01F, S2.01R, S2.02F, S2.02R, S2.03F, S2.03R, S2.03W, S2.04, S2.05, S2.06, S2.07, S2.08, S3.00, S3.01, S3.02, S3.03, S3.04, S3.05, S4.00, S4.01, S4.02, S4.03, S4.04, S5.00, S5.01, S5.02, S5.03, S5.04, S5.05, S5.06 and taken to Mike Phillips
|
Plan resubmittals received | | | 7/13/2006 | | |
|
|
|
Received 1 cover transmittal letter, 1 copy of the following sheets--A06, S1.00, S1.01, S2.00-F, S2.01-R, S2.02-F, S2.02-R, S2.03-F, S2.03-R, S2.03-W, S2.04, S2.05, S2.06, S2.07, S2.08, S3.00, S3.01, S3.02, S3.03, S3.04, S3.05, S4.00, S4.01, S4.02, S4.03, S4.04, S5.00, S5.01,S5.02, S5.03, S5.04, S5.05, S5.06 and taken to Mike Phillips
|
Routing - PLANNING | 6/21/2003 | | 6/27/2006 | | FAIL |
|
|
|
DRH05-00396, CUP05-00150 Cody R.
Issues with changes to elevations, parking requirements, and required easments. Faxed applicant a list of necessary corrections.
|
Routing - PLUMBING | 6/15/2006 | | 6/21/2006 | | FAIL |
|
|
|
pump discharge may not tie to the 2" gravity line, two 35 gpm pumps is 140 fixture units. max f.u. loading on a 6" drain line is 720, you have 820 f.u. total. show interceptor venting and detail. address suds relief. prv's may be required at each floor. show sump venting. address items 2 and 3 for grading and drainage permit.
|
Routing - Erosion and Sediment | 6/14/2006 | | 6/15/2006 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PUBLIC WORKS | 6/1/2006 | | 6/14/2006 | | PASS |
|
|
|
|
Routing Off Site - STRUCTURAL | 5/22/2006 | | 6/7/2006 | | FAIL |
|
|
|
E-mailed comments to the architect additional review requried.
|
Plan resubmittals received | | | 6/2/2006 | | |
|
|
|
Received 1 cover letter from Kent Adamson to Aimee Hughes and 2 copies of C5.0 and taken to Mike Phillips
|
Routing - PLANNING Land Div | 5/22/2006 | | 6/1/2006 | | FAIL |
|
|
|
An application for a record of survey (ROS06-00041) has been submitted for the property. Do not issue a Building Permit until the record of survey has been finalized.
|
Telephone call | | | 5/22/2006 | | DONE |
|
|
|
called Action Couriers for pick-up to Stapley Eng.
|
Plan routing begun/NEW & ADDTN | | | 5/22/2006 | | |
|
|
|
|
Application received | | | 5/19/2006 | | |
|
|
|
|