Permit Information
Permit NumberBLD06-01450
StatusFinaled
Name CM INVESTMENTS LLC
Site Address 323 W JEFFERSON ST
Project NameTHE JEFFERSON BLDG
Customer Number 
ePlanReviewNo
Description
(The Jefferson Building Parking Garage, Grading, Drainage, Underground Utilities & Landscaping) - To construct a new 35,040 square feet, single story, shell only building, with a multi-level (4 teared) basement parking garage, below a three hour horizontal assembly per IBC Section 508.2. The first floor is 11,680 square feet, will be finished with three dwelling units, along with the entry lobby and accessory storage area for the dwelling units. The basements area is 23,360 square feet and will be used as a private parking garage. This building is requried to be fire sprinklered with a NFPA 13 fire sprinkler system. Refer to BLD 06-01451 for the construction of the upper five floors, the completition of the interior of the dwelling units, the entry lobby, the parking garage and the accessory storage area. NOTE: This permit is for a shell only. The minimum ceiling height in vehicle and pedestrian areas is 7 feet. All construction per the approved plans and attached comment list. DRH05-00396 CUP05-00150 (7/24/07: Plan modification for structural slab and wall changes approved.) MJP
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 7/23/20098/5/2009 DONE
Permanent Occupancy  7/23/2009 DONE
FIRE-Final Inspection7/13/20097/14/20097/14/2009APASS
DetailsTroy Cobbley
Life safety passed.
BLD-Final2/27/20092/27/20093/2/2009ACANC
DetailsDave Hannah
BLD-Final2/26/20092/26/20092/26/2009APART
DetailsDave Hannah
Dave; We have all the signatures for this permit. Can we get the Temp.Oc. today?

Thanks, Bob Phone #: ###-#### Internet Inspection Request from: bob austin ok for temp occ ok for perm occ after fire gos perm
FIRE-Final Inspection2/25/20092/26/20092/26/2009APART
DetailsTroy Cobbley
A temporary occupancy was given until the project related fire alarm permit is finaled. Life safety items will be ok to pass at that time.
FIRE-Final Inspection2/23/20092/24/20092/25/2009AFAIL
DetailsTroy Cobbley
Life safety items are ok. Just waiting for the fire alarm resubmittals which were required due to changes/additional devices.
FIRE-Final Inspection2/24/20092/24/20092/24/2009ADONE
DetailsScott Arellano
Emergency egress lighting and generator satisfactory.
PubWorks Occupancy Approval2/18/20092/18/20092/18/2009 DONE
Zoning Approval2/11/20092/11/20092/11/2009 PASS
DetailsCody Riddle
BLD-Framing/Rough-in11/20/200811/21/200811/22/2008APART
DetailsDave Hannah
Dave; Could we get a re-inspect for the lower units( C3,4,5)?
Bob Phone #: ###-#### Internet Inspection Request from: bob austin ok to cover lids c3,4,5 level 1 ok to cover drops level 6 ok to start insulating roof /ceiling level7
BLD-Framing/Rough-in10/10/200810/10/200810/13/2008APART
DetailsDave Hannah
Dave; Could you do a framing inspection for the trash room, generator room, pump room, and mechanical rooms on levels P1,2,3.

Bob Phone #: ###-#### Internet Inspection Request from: bob austin ok to cover
BLD-Framing/Rough-in8/20/20088/20/20088/21/2008APART
DetailsDave Hannah
Dave; I would like to cover one side of the Trash Room wall;metal studs in garage.Two of the walls are shaft liner,no rough-in in them. Other walls have rough-in,will do one side only. Thanks, Bob Phone #: ###-#### Internet Inspection Request from: bob austin ok to cover this area
BLD-Framing/Rough-in8/20/20088/20/20088/21/2008PCANC
DetailsDave Hannah
Dave; I would like to cover one side of the Trash Room wall;metal studs in garage.Two of the walls are shaft liner,no rough-in in them. Other walls have rough-in,will do one side only. Thanks, Bob Phone #: ###-#### Internet Inspection Request from: bob austin ok to cover this area
BLD-Concrete2/12/20082/13/20082/13/2008PPART
DetailsDave Hannah
Rebar,tendon inspection for L3 PT slab. Phone #: ###-#### Internet Inspection Request from: bob austin
BLD-Conference2/8/20082/11/20082/12/2008PPASS
DetailsDave Hannah
Dave; Have you had a chance to check on the
framing detail where the 1hr floor meets the
2hr shaft. You were going to run it by George
and/or Marlene, I think. Let me know.
Thanks, Bob Phone #: ###-#### Internet Inspection Request from: bob austin
BLD-Conference2/5/20082/5/20082/5/2008PDONE
DetailsDave Hannah
Dave; If possible,could you stop by the job
between 1-2:45pm and look over a couple
details the arch. was needing OKed.If this
time frame is good today,we could get
together tomorrow. Thanks, Bob
Phone #: ###-#### Internet Inspection Request from: bob austin
BLD-Conference1/23/20081/23/20081/23/2008PDONE
DetailsJim Storey
Dave; I have a couple quick questions on
framing I need to run by you. Could
we meet at job trailer some time
today? Bob Phone #: ###-####
Internet Inspection Request from: bob austin
Architect to provide new wall details for approval.......or Call Dave
BLD-Conference12/28/20071/3/20081/3/2008ADONE
DetailsDave Hannah
Owner,Arch.,framer,myself would like to meet to
go over some possible question/problem areas with reguard to framing.If possible,10:30 at
420 Main St.,suite 202(Veltex Bldg.)Let me know
if this time is a problem. Thanks, Bob Phone #: ###-#### Internet Inspection Request from: bob austin
BLD-Foundation12/26/200712/27/200712/28/2007APART
DetailsDave Hannah
Wall rebar for L2.MTI will inspect.

Thanks, Bob Phone #: ###-#### Internet Inspection Request from: bob austin
BLD-Foundation12/12/200712/12/200712/13/2007PPART
DetailsDave Hannah
Rebar for L1 walls. MTI will inspect.

Thanks, Bob Phone #: ###-#### Internet Inspection Request from: bob austin
BLD-Foundation12/4/200712/4/200712/4/2007PPART
DetailsDave Hannah
Rebar for L1 walls; MTI will inspect also.

Thanks, Bob Phone #: ###-#### Internet Inspection Request from: bob austin
BLD-Conference11/28/200711/29/200711/29/2007APASS
DetailsDave Hannah
Conference with subs on floor/wall
penetrations at 10:00 am. Have confirmed
with Dave Hannah.
Thanks, Bob fire protection

Thanks, Bob Phone #: ###-#### Internet Inspection Request from: bob austin
BLD-Foundation11/19/200711/19/200711/19/2007PPART
DetailsJim Storey
P1 wall rebar-MTI will inspect. pending reports

Thanks, Bob Phone #: ###-#### Internet Inspection Request from: bob austin
BLD-Foundation11/1/200711/1/200711/2/2007PPART
DetailsDave Hannah
Rebar for walls at P2 level.MTI will inspect.

Thanks, Bob Phone #: ###-#### Internet Inspection Request from: bob austin
BLD-Concrete10/25/200710/26/200710/26/2007PPASS
DetailsDave Hannah
This is for post-tensioned(PT)slab P1.All rebar
and tendons have been inspected by MTI.

Thanks Phone #: ###-#### Internet Inspection Request from: bob austin
BLD-Foundation10/12/200710/12/200710/12/2007PPART
DetailsDave Hannah
Level 2 wall rebar. My appologies;I failed to notify you of a floor pour on Oct.5th.I was out of town from Oct.3rd-8th.It was inspected by MTI and structural engineer from Seatle. Phone #: ###-#### Internet Inspection Request from: bob austin
BLD-Foundation8/31/20079/4/20079/4/2007APART
DetailsDave Hannah
Rebar for walls - special inspection will do also. Phone #: ###-#### Internet Inspection Request from: bob austin
BLD-Foundation8/14/20078/15/20078/15/2007APART
DetailsDave Hannah
Wall rebar Phone #: ###-#### Internet Inspection Request from: bob austin rebar ok crew still setting forms spec inspection will final befor pour
BLD-Footing8/2/20078/3/20078/3/2007APART
DetailsTony Young
Phone #: ###-#### Internet Inspection Request from: bob austin
pending S.I. report
BLD-Other7/24/20077/25/20077/25/2007PPART
DetailsDave Hannah
around 2 if possible please---Re-bar walls and 4 column footings only please--###-####spec inpection on site
CHANGE STATUS TO (ISS)  7/25/2007 DONE
Called Dave and told him plan mod is ready & fees///7/25/07 @ 8:30am BAS
(F) Reprint permit  7/25/2007 DONE
Print Occupancy Form  7/25/2007 DONE
Override - Parcel Holds  7/24/2007  
PLANS/APPL TAKEN TO FRONT DESK  7/24/2007 DONE
PLAN MODIFICATION approved and taken to permit desk.
Permit Ready to Issue  7/24/2007  
Plan assigned to (M_P)6/28/2007 7/24/2007 DONE
PLAN MODIFICATION for slab and wall changes submitted. Sent to outside engineering for review.
7/19/07: Outside review completed and approved.
Routing - PLAN CHECK6/28/2007 7/24/2007 PASS
PLAN MODIFICATION for minor structural changes sent to outside engineering for review on 6/29/07.
7/24/07: Plan mod approved by outside engineer. Plans taken to permit desk to issue and collect fees.
Routing Off Site - STRUCTURAL7/19/2007 7/19/2007 PASS
Called Action Courier for pick up on 7/19/07 @ 12:27pm BAS
Plan resubmittals received  7/19/2007  
received 1 transmittal,1 response,1 supplemental calcs and 1 copy of sheets S2.03-F ,S3-03A taken to Mike P.
Plan resubmittals received  7/18/2007  
received 1 transmittal,2 response for plan mod and 2 copys of sheets S3.03A,S2.03-F taken to Mike P.
BLD-Foundation7/12/20077/17/20077/17/2007APART
DetailsDave Hannah
Rebar please @ Gridline 1 & M & A- ###-#### Bob Austin spec inspection on site
BLD-Footing7/12/20077/17/20077/17/2007APART
DetailsDave Hannah
Footing @ area D & H around 10 if possible ###-#### Bob Austin spec inspection on site
Override - Parcel Holds  7/12/2007  
Override - Parcel Holds  7/12/2007  
BLD-Footing6/29/20077/3/20077/3/2007PPART
DetailsDave Hannah
Around 1:30 if possible please--###-#### Bob ok to pour first section of basement wall ftg
Routing Off Site - STRUCTURAL6/29/2007 7/3/2007 FAIL
PLAN MODIFICATION with minor structural changes sent to outside engineering for review on 6/29/07. Plan sheets only, no calcs.
E-mailed copy of structural review to the architect. Requested additional information to be submitted for further review and approval.
Override - Parcel Holds  6/29/2007  
Plan Modification Accepted  6/28/2007 DONE
PLAN MODIFICATION accepted for Structural revisions to slab and walls, Elevator removed, exterior shaft added. revised sheets are S1.00,1.01,2.00-F, 2.01-R,S2.02-F, S2.02-R, S2.03-F, S2.02-R, 2.03-F, S2.03-R, S3.00, S3.01, S3.02, S3.03, S3.03A, S3.04, S3.05, S4.00, S4.01, S4.02, S4.03 & S4.04 Routed to Mike P.
Plan resubmittals received  6/27/2007 DONE
received 1 copy of sheets S1.00,S1.01,S2.00-F,S2.01-F,S2.01-R,S2.02-F,S2.02-R,S2.03-F,S2.03-R,S3.00,S3.01,S3.02,S3.03,S3.03A,S3.04,S3.05,S4.00,S4.01,S4.02,S4.03,S4.04 PLANS ISSUED 4-25-07 TAKEN TO MIKE P.
(F) Reprint permit  4/26/2007  
Issue PAID IN FULL permit  4/25/2007 DONE
Inspection Record Card- Bld  4/17/2007  
Permit Ready to Issue  4/17/2007 DONE
Telephone call  4/17/2007  
left mess that permit is ready with matt at ###-####
Routing - PLAN CHECK4/13/2007 4/16/2007 PASS
PLANS/APPL TAKEN TO FRONT DESK  4/16/2007 DONE
Plan assigned to (M_P)5/22/2006 4/16/2007 PASS
4/16/2007 14:46:41 M_P - activity updated through activity BLDA022 from case BLD06-01450.
Routing - PLUMBING4/12/2007 4/13/2007 PASS
per plans and 2003 upc
Routing - PLAN CHECK4/9/2007 4/12/2007  
Routing to Plumbing.
Plan resubmittals received  4/12/2007  
received transmittal letter from erstad arch & "2" sheets each of C2.O--plans taken to Mike Phillips
Routing - PLANNING4/6/2007 4/9/2007 PASS
Construction must comply with the requirements of CUP, DR and DA approvals.
Routing - PLAN CHECK4/6/2007 4/6/2007  
Routing to Planning.
Routing - PLUMBING4/4/2007 4/6/2007 FAIL
Insert plans and route to Plumbing. 6" sewer is too small.
Routing - PLAN CHECK4/4/2007 4/4/2007  
Routing to Plumbing.
Plan resubmittals received  4/4/2007  
Received 1 cover transmittal, 2 copies of sheets A005, A006, A704 and taken to Mike Phillips
Routing - PLANNING3/30/2007 4/4/2007 FAIL
Contacted developer; Need a final, recorded copy of the approved landscape easement.
Plan resubmittals received  4/2/2007  
Received 1 cover transmittal and 3 copies of sheets M100, M201 and M202 and taken to Mike Phillips
Plan resubmittals received  3/30/2007  
Received 1 cover transmittal, 4 copies of A300, 3 copies of A301 and taken to Mike Phillips
Routing - PLAN CHECK1/31/2007 3/30/2007  
Routing to Planning.
Plan resubmittals received  3/8/2007  
received erosion & sediment control permit & "2" sets of structural calculations. also "2" sheets of S-1/plans taken to mike phillips
Routing - PLANNING1/29/2007 1/31/2007 FAIL
Building elevations do not match those approved by DR. Applicant contacted via email today.
Routing - PLAN CHECK1/16/2007 1/29/2007  
Routing to Planning.
Routing - PLAN CHECK12/21/2006 1/16/2007  
Routing to Land Division
Routing - PLANNING Land Div1/16/2007 1/16/2007 PASS
Routing - PUBLIC WORKS12/19/2006 12/21/2006 PASS
Routing - PLAN CHECK11/28/2006 12/19/2006  
Routing to P.W.
Routing - PLUMBING11/28/2006 11/28/2006 FAIL
Only one of 6 corrections requested on plumbing plan review of 6/21/2006 were corrected on resubmittal. Called mechanical engineer and left message and faxed original copy of plumbing plan review from 6/21/2006. did not contact architect this time.
Routing - FIRE11/22/2006 11/28/2006 PASS
Attached updated review comments to the plans.
Routing - PLANNING Land Div11/20/2006 11/22/2006 FAIL
ROS06-00041 not completed. Need copies of recorded notice of buildable parcels, recorded deed and new tax parcel number.
Routing - PLANNING11/20/2006 11/20/2006 FAIL
The applicant has not submitted the lic. agreement or landscape easement as required by the CUP.
Routing - PLAN CHECK9/29/2006 11/20/2006  
Routing to Planning, Plumbing, Land Division and Fire
Routing - PLAN CHECK7/26/2006 9/29/2006 FAIL
Second review failed. Sent correction report to the architect requesting additional information to be submitted for further review prio to issuing permit.
Plan resubmittals received  9/13/2006 DONE
ReceiveD\d 4 copys of sheets A206,A311,A801,A822,S1-00,S1-01,S2-00F,S2-01F,S2-02R,S2-02F,S2-02R,S2-03F,S2-03R,S2-04,S2-05,S2-06,S2-08,S3-03A,S4-03,S5-00,S5-01,S5-03 inserted into plans and taken back to Mike P.
Routing Off Site - STRUCTURAL  9/11/2006 PASS
Received date unknown as revised structural sent directly to Boise's contract engineer by the designing engineer. Revisions were approved on 9/11/06.
Plan resubmittals received  8/10/2006  
received transmittal sheet from erstad architects & 14 pages from driscoll architects regarding response to corrections, & "2" sets of plans including cover sheet, wp1, wp 2, wp3, wp4, wp5, wp6, A001, a002a, a002b, a003, a004, a100, a200, a201, a202, a203, a204, a205, a206, a220, a221, a222, a223, a224, a240, a241, a250, a251, a252, a300, a301, a310, a311, a312, a360, a361, a362, a500, a501, a700, a701, a702, a703, a704, a710, a800, a801, a802, a810, a811, a820, a821, a822, a900, a901, a902, s1.00, m102 & m201--plans taken to mike phillips
Routing Off Site - STRUCTURAL7/18/2006 8/9/2006 FAIL
Called Action Couriers for pick up
Second review failed.
1st review completed  7/26/2006 FAIL
Failed Planning,Plumbing & Fire.
Routing - FIRE7/21/2006 7/26/2006 FAIL
Faxed resubmittal item to Matt Driscoll @ 1-###-####. Inserted review comments into plans.
Routing - PLAN CHECK6/27/2006 7/21/2006 FAIL
Plan review completed, sent correction report to the architect requesting additional informaiton be subnmitted for further review prior to issuing permit.
Plan resubmittals received  7/13/2006  
Received 1 copy of cover transmittal, 3 copies of Review comments, 4 copies each of the following sheets--A206, S1.00, S1.01, S2.00F, S2.01F, S2.01R, S2.02F, S2.02R, S2.03F, S2.03R, S2.03W, S2.04, S2.05, S2.06, S2.07, S2.08, S3.00, S3.01, S3.02, S3.03, S3.04, S3.05, S4.00, S4.01, S4.02, S4.03, S4.04, S5.00, S5.01, S5.02, S5.03, S5.04, S5.05, S5.06 and taken to Mike Phillips
Plan resubmittals received  7/13/2006  
Received 1 cover transmittal letter, 1 copy of the following sheets--A06, S1.00, S1.01, S2.00-F, S2.01-R, S2.02-F, S2.02-R, S2.03-F, S2.03-R, S2.03-W, S2.04, S2.05, S2.06, S2.07, S2.08, S3.00, S3.01, S3.02, S3.03, S3.04, S3.05, S4.00, S4.01, S4.02, S4.03, S4.04, S5.00, S5.01,S5.02, S5.03, S5.04, S5.05, S5.06 and taken to Mike Phillips
Routing - PLANNING6/21/2003 6/27/2006 FAIL
DRH05-00396, CUP05-00150 Cody R.

Issues with changes to elevations, parking requirements, and required easments. Faxed applicant a list of necessary corrections.
Routing - PLUMBING6/15/2006 6/21/2006 FAIL
pump discharge may not tie to the 2" gravity line, two 35 gpm pumps is 140 fixture units. max f.u. loading on a 6" drain line is 720, you have 820 f.u. total. show interceptor venting and detail. address suds relief. prv's may be required at each floor. show sump venting. address items 2 and 3 for grading and drainage permit.
Routing - Erosion and Sediment6/14/2006 6/15/2006 PASS
ESC plan approved with attached conditions.
Routing - PUBLIC WORKS6/1/2006 6/14/2006 PASS
Routing Off Site - STRUCTURAL5/22/2006 6/7/2006 FAIL
E-mailed comments to the architect additional review requried.
Plan resubmittals received  6/2/2006  
Received 1 cover letter from Kent Adamson to Aimee Hughes and 2 copies of C5.0 and taken to Mike Phillips
Routing - PLANNING Land Div5/22/2006 6/1/2006 FAIL
An application for a record of survey (ROS06-00041) has been submitted for the property. Do not issue a Building Permit until the record of survey has been finalized.
Telephone call  5/22/2006 DONE
called Action Couriers for pick-up to Stapley Eng.
Plan routing begun/NEW & ADDTN  5/22/2006  
Application received  5/19/2006