BLD-Final | 6/6/2007 | 6/13/2007 | 6/13/2007 | A | DONE |
Tony Young
|
|
|
Daniel
|
BLD-Final | 6/11/2007 | 6/12/2007 | 6/12/2007 | A | PASS |
Tony Young
|
|
|
dan; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang
|
DOC - Permit Finaled | 6/12/2007 | 6/12/2007 | 6/12/2007 | P | PASS |
Tony Young
|
|
|
c of o issued
|
BLD-Final | 6/6/2007 | 6/6/2007 | 6/6/2007 | P | FAIL |
Tony Young
|
|
|
daniel; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang need hand rail clearance and guard rail space
|
BLD-Energy code compliance | 11/15/2006 | 11/15/2006 | 11/16/2006 | P | PASS |
Tony Young
|
|
|
daniel; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Framing/Rough-in | 11/9/2006 | 11/13/2006 | 11/13/2006 | A | PART |
Tony Young
|
|
|
dan; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles need to fire block 2 areas,, front entry closet and chase walls at top of stairs
|
BLD-Conference | 10/31/2006 | 10/31/2006 | 10/31/2006 | P | PART |
Tony Young
|
|
|
scott; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles general frame conf.,, ok to cover upstairs mechanical room,, and detached garage
|
BLD-Framing/Rough-in | 10/26/2006 | 10/27/2006 | 10/27/2006 | A | FAIL |
Tony Young
|
|
|
scott; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles c/n posted,, do not insulate,, need trades 1st
|
BLD-Framing/Rough-in | 8/25/2006 | 8/25/2006 | 8/25/2006 | P | NR |
Tony Young
|
|
|
william; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Footing | 8/24/2006 | 8/24/2006 | 8/24/2006 | P | PART |
Tony Young
|
|
|
kenny; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles garage ftgs,, wip
|
BLD-Framing/Rough-in | 8/16/2006 | 8/16/2006 | 8/16/2006 | P | PART |
Dave Hannah
|
|
|
daniel - pre-siding; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley ok to cover ext
|
Case Summary (BLD) | | | 8/9/2006 | | |
|
|
|
|
Plan Reviewer's activity | | | 8/9/2006 | | DONE |
|
|
|
Updated existing building permit to include front upper deck, deck over rear patio, and a Hot tub deck over Master bath. (SRZ)
|
BLD-Footing | 6/26/2006 | 6/26/2006 | 6/26/2006 | P | PART |
Tony Young
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
Permit Ready to Issue | | | 6/26/2006 | | DONE |
|
|
|
|
Telephone call | | | 6/26/2006 | | DONE |
|
|
|
spoke to daniel mccown@###-####/told him that permit was ready and fees associated with it
|
Issue PAID IN FULL permit | | | 6/26/2006 | | |
|
|
|
|
BLD-Footing | 6/22/2006 | 6/23/2006 | 6/23/2006 | P | NR |
Tony Young
|
|
|
###-#### - mike
|
Plan assigned to (SRZ) | 6/21/2006 | 6/21/2006 | 6/23/2006 | | PASS |
|
|
|
6/23/2006 12:04:08 SRZ - activity updated through activity BLDA022 from case BLD06-01452.
|
Routing - PLAN CHECK | 5/22/2006 | | 6/23/2006 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 6/23/2006 | | PASS |
|
|
|
Recieved truss framing plan. Designer is to verify girder point loads are incorporated into the floor framing beam designs and call me back. (SRZ)
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/23/2006 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/23/2006 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 6/22/2006 | | |
|
|
|
|
Telephone call | | | 6/22/2006 | | DONE |
|
|
|
I left a message with the Applicant and spoke with the Designer. I requested a new Res-check and resolved a beam question. I was told the Applicant / Builder will get me a Roof framing plan. (SRZ)
|
Plan assigned to (SAM) | 5/19/2006 | 5/19/2006 | 6/21/2006 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 6/21/2006 | | PASS |
|
|
|
Pending New Res-check, and Roof Framing Plan. (SRZ)
|
Early Start Permit | | | 6/2/2006 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS | 5/19/2006 | | 5/22/2006 | | PASS |
|
|
|
|
Application received | | | 5/19/2006 | | |
|
|
|
|
Routing - PLANNING | 5/19/2006 | | 5/19/2006 | | PASS |
|
|
|
Redlined rear setback after discussion with Daniel. See memo from Wayne Gibbs re: side street setbacks on lots platted prior to 5/27/90.
|