Letter of compliance | | | 8/7/2007 | | DONE |
|
|
|
Letter of Compliance issued 8-7-07
|
BLD-Final | 8/3/2007 | 8/6/2007 | 8/6/2007 | A | PASS |
Mike Jordan
|
|
|
mark Phone #: ###-####. Final ok.
|
FIRE-Final Inspection | 8/3/2007 | 8/3/2007 | 8/6/2007 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
FIRE-Final Inspection | 7/23/2007 | 7/23/2007 | 7/23/2007 | P | FAIL |
Troy Cobbley
|
|
|
The exit signs still do not operate on battery backup.
|
FIRE-Final Inspection | 7/16/2007 | 7/17/2007 | 7/17/2007 | A | FAIL |
Troy Cobbley
|
|
|
Repair the existing exit signs and emergency lights
|
BLD-Final | 7/13/2007 | 7/16/2007 | 7/16/2007 | A | NR |
Mike Jordan
|
|
|
MARK Phone #: ###-####. Needs life/safety and mech final.
|
Telephone call | | | 12/12/2006 | | DONE |
|
|
|
At request of Dave Hanneman, I called Gerald Weaver to inquire more about a letter which Gerald wrote to Dave dated 12/8/06, regarding an unspecified "Idaho Power Project", which indicated the existing fire alarm panel needs to be replaced and requested approval "to upgrade the entire facility peripheral devices and bring the facility up to code as it pertains to the fire alarm system prior to the end of the calendar year 2008."
I determined the project relates to this building permit. He mentioned to me that he had written an earlier letter, which I determined was a letter dated 11/17 requesting approval to connect elevator function in one building to an alarm panel in another building. I had referred that letter to Mike Timmerman to discuss with the alarm contractor. Mike had done that and had indicated the proposal would not be acceptable and suggested they consider a different design approach which would not involve a fire alarm panel replacement. Gerald indicated the contractor did not feel that suggestion was feasible and therefore Gerald had written the 12/8 letter requesting to defer any required upgrades associated with a panel replacement until the end of 2008. I explained that we would need to have a letter which referenced this building address and permit number and which indicates specifically which code requirements they have determined cannot be met with the existing system if a new alarm panel were installed, in order for us to evaluate whether those requirements could be deferred. I also indicated that the request may need to acknowledge that the agreement will be recorded and that a bond may be required in the event the specified time frames for completion are not met, but that these conditions would be determined in further consultation with our Legal department. He agreed to discuss this with their alarm contractor and provide the additional information.
|
BLD-Wall cover | 11/28/2006 | 11/28/2006 | 11/28/2006 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 11/28/2006 at 9:28:03 AM. Contact: ###-####. Inspected completion of 1hr wall and ceiling assemblies at corridor on 1st and 2nd floors. Reviewed UL data for fire caulking sysytem being used. Fire caulking in progress, will inspect remainder on final.
|
BLD-Conference | 11/21/2006 | 11/21/2006 | 11/21/2006 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 11/21/2006 at 7:57:25 AM. Contact: ###-####. received and reviewed wp file for rated const. Ok to one side 1hr ceiling assembly down stairs. Inspected 5/8 type x at 2nd floor corridor walls and cewiling assembly.
|
BLD-Framing/Rough-in | 11/20/2006 | 11/20/2006 | 11/20/2006 | P | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 11/20/2006 at 9:19:53 AM. Contact: ###-####. 1hr ceiling assembly in corridors. ok to one side. Needs to provide WP for one hour assembly and UL listings for penetrations.
|
BLD-Other | 9/22/2006 | 9/25/2006 | 9/25/2006 | A | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 9/22/2006 at 3:02:59 PM. Contact: ###-####. Elevator shaft (masonry) 0 to 8ft elev. Will require cleanouts. Also will have special insp.
|
BLD-Framing/Rough-in | 9/21/2006 | 9/22/2006 | 9/22/2006 | P | CANC |
Mike Jordan
|
|
|
mark Note: rebar; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. cnc by contractor.
|
BLD-Conference | 9/18/2006 | 9/18/2006 | 9/18/2006 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 9/18/2006 at 8:21:46 AM. Contact: ###-####.
|
BLD-Foundation | 9/8/2006 | 9/8/2006 | 9/8/2006 | P | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 9/8/2006 at 8:24:40 AM. Contact: ###-####.wip at elvator pit walls.
|
BLD-Footing | 9/6/2006 | 9/7/2006 | 9/7/2006 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 9/6/2006 at 4:29:42 PM. Contact: ###-####. elevator pit footing.
|
Issue PAID IN FULL permit | | | 7/25/2006 | | DONE |
|
|
|
|
Telephone call | | | 7/7/2006 | | |
|
|
|
tlk to gerry weaver ###-#### that permit and fees are ready to be picked up but needs GC and RCE #
|
Permit Ready to Issue | | | 7/7/2006 | | |
|
|
|
|
Plan assigned to (CJW) | 5/26/2006 | | 7/6/2006 | | PASS |
|
|
|
7/6/2006 14:59:20 CJW - activity updated through activity BLDA022 from case BLD06-01463.
|
Routing - FIRE | 7/3/2006 | | 7/6/2006 | | PASS |
|
|
|
Attached review comments to plans.
|
Routing - PLAN CHECK | 7/6/2006 | | 7/6/2006 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/6/2006 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/6/2006 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 6/20/2006 | | 7/3/2006 | | PASS |
|
|
|
(6-27-06) Resubmitted drawings were reviewed. Waiting for response from the Consultant Structural Engineer.
(7-3-06) Notified that the Consultant Structural Engineer was content with the submittal. Drawings approved.
|
Routing Off Site - STRUCTURAL | 6/26/2006 | | 7/3/2006 | | PASS |
|
|
|
Called Action Courier for pick up to Stapley///6/26/06 @ 3:05pm BAS
Drawings approved on July 3, 2006. CJW
|
Plan resubmittals received | | | 6/23/2006 | | DONE |
|
|
|
Received transmittal letter,1,revised structural calc & 3 copys of sheets A101,A301,S101,S201,M101,M102,E101,E102,E103 taken to Carl W.
|
1st review completed | | | 6/20/2006 | | FAIL |
|
|
|
Failed plan Check and Fire.
|
Routing - FIRE | 6/14/2006 | | 6/20/2006 | | FAIL |
|
|
|
Faxed resubmittal item to architect. Attached revie comments to plans.
|
Plan resubmittals received | | | 6/14/2006 | | DONE |
|
|
|
Received 1 transmittal letter,1 copy of demoed sheets 3,2,5,6,113,-end, 3 fire alarm cable-fpl& fpld, 1 copy of sheet 1 of 1,1 con't,2,3,4,5,6,7,8,9,10,11,12,13,14,15,16,17,18,19,22,23,24,25,26,27,28,29,30,31,32,33,34,35,36,37,38,39,40,41,42,43,44,45,46,47,48,49,50,51,52,53,54,55,56,57,58,59,60,a0.1,a0.2,a1.1,a1.2,a2.2,a3.1,a5.1 taken to Carl W.
|
Routing - PLAN CHECK | 5/30/2006 | | 6/14/2006 | | FAIL |
|
|
|
(6-9-06) Waiting for a copy of the original building drawings. Since this building was originally constructed in the County, Boise City does not have a copy of the original drawings. Those drawings are needed to complete the plan review.
(6-14-06) Reviewed the submitted copy of the original building drawings and was able to complete the plan review for the elevator addition. Revised drawings were required. See the plan review report.
|
Routing Off Site - STRUCTURAL | 5/26/2006 | | 6/9/2006 | | FAIL |
|
|
|
Called Action Courier to pick up and take to Stapley///5/26/06 @2:23pm BAS
(6-9-06) The structural review failed. An E-mail was received with a list of items to be addressed.
|
Routing - PUBLIC WORKS | 5/26/2006 | | 5/30/2006 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/23/2006 | | |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/23/2006 | | DONE |
|
|
|
|
Application received | | | 5/22/2006 | | |
|
|
|
|