Permit Information
Permit NumberBLD06-01480
StatusFinaled
Name AEI
Site Address 455 N BENJAMIN LN
Project Name 
Customer Number 
ePlanReviewNo
Description
**(A&H Supply)** To remodel an existing 15000 sq ft office warehouse tenant per approved plans. Work to include, remodel restroom to create a unisex accessible restroom, selective removal of interior partitions and construction of new interior partitions to create office spaces, miscelaneous related interior finishes. A SEPARATE PERMIT WILL BE REQUIRED FOR ANY RACKING OVER EIGHT FEET HIGH. RMH
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD6/6/20086/6/20088/5/2008 PASS
DetailsCathy Brown
Second Notice has not been responded to.
Second Notice BLD4/23/20084/23/20086/6/2008 DONE
DetailsCathy Brown
First Notice has not been responded to.
First Notice2/25/20082/25/20084/23/2008 DONE
DetailsMike Jordan
BLD-Final2/25/20082/25/20082/25/2008PPASS
DetailsMike Jordan
should have doc. finaled when job was completed.
DOC - Permit Finaled2/25/20082/25/20082/25/2008PPASS
DetailsMike Jordan
BLD-Final2/7/20072/7/20072/7/2007PPASS
DetailsMike Jordan
chris; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. All issues have been resolved. final ok.
Reopen Permit (ISS)  2/7/2007  
reopen due the final failed need inspection
BLD-Final11/8/200611/9/200611/9/2006AFAIL
DetailsMike Jordan
Scheduled by a contractor via Hello! on 11/8/2006 at 2:16:57 PM. Contact: ###-####. Door swings need to be changed. Permit also notes remodel work for restroom to meet ada that was not done. Notrified contractor of issues and noted to have permit ammended to reflect work that was actually completed.
FIRE-Final Inspection11/7/200611/8/200611/8/2006APASS
DetailsForrest France
Inspection passed, tenant to mount the provided fire extinguisher on the wall as discussed for compliance prior to structural final.
BLD-Final11/6/200611/7/200611/7/2006ANR
DetailsMike Jordan
Scheduled by a contractor via Hello! on 11/6/2006 at 12:55:08 PM. Contact: ###-####. Needs fire/life/safety final
BLD-Wall cover9/5/20069/5/20069/5/2006PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 9/5/2006 at 8:38:20 AM. Contact: ###-####. New interior framing for new sales counter and offices.
BLD-Other8/10/20068/10/20068/10/2006PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 8/10/2006 at 7:33:39 AM. Contact: ###-####.
BLD-Other7/31/20068/1/20068/1/2006AFAIL
DetailsMike Jordan
Scheduled by a contractor via Hello! on 7/31/2006 at 4:15:56 PM. Contact: ###-####. Needs to provide approved set of plans with ceiling plan. They have installed a fix system that is not complete. provided plans shown no ceiling details. Also elec. work above grid is not complete and needs ri insp.
BLD-Framing/Rough-in7/3/20067/3/20067/3/2006PPASS
DetailsMike Jordan
dan - call first so that dan can meet inspector there; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
Issue PAID IN FULL permit  6/7/2006 DONE
Inspection Record Card- Bld  6/6/2006 DONE
Telephone call  6/6/2006 DONE
tlk to ###-#### that permit and fees are ready to be picked up
Permit Ready to Issue  6/6/2006  
Plan assigned to (R_H)5/24/20065/24/20066/5/2006 PASS
6/5/2006 08:38:08 RMH - activity updated through activity BLDA022 from case BLD06-01480.
Case Summary (BLD)  6/5/2006 DONE
1st review completed  6/5/2006  
Routing - PLANNING6/5/2006 6/5/2006 PASS
All Exterior work has been deleted from plans, only interior work being performed (Ron Hill 6/5/06)
PLANS/APPL TAKEN TO FRONT DESK  6/5/2006 DONE
Routing - FIRE6/5/2006 6/5/2006 PASS
Existing tenant, minor remodel to office area. / Field Verify
Routing - PLAN CHECK5/31/2006 6/5/2006 PASS
Plan resubmittals received  6/2/2006  
Received 3 copys of sheets A0.0,A1.1,A2.1,A2.2, E1.1 taken to Ron H.
Plan resubmittals received  5/31/2006 DONE
Received 1 Erosion & Sediment Control application 1 request for waiver taken to Ron H.
Routing - PLANNING5/30/2006 5/31/2006 FAIL
Exterior changes will require review and approval of a zoning certificate by Design Review Staff. Faxed applicant at 9:30 a.m.
Application received  5/23/2006  
Plans ACCEPTED BY PLAN CHECK  5/23/2006  
Recd Pcfee & Taken To Pln CK  5/23/2006 DONE