Second Notice BLD | 10/17/2007 | 10/17/2007 | 10/30/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 10/2/2007 | 10/17/2007 | | DONE |
|
|
|
|
Permanent Occupancy | | | 10/2/2007 | | DONE |
|
|
|
|
BLD-Final | 9/6/2007 | 9/7/2007 | 9/7/2007 | P | PASS |
Tony Young
|
|
|
mardi Phone #: ###-####
|
FIRE-Final Inspection | 9/6/2007 | 9/7/2007 | 9/7/2007 | A | PASS |
Forrest France
|
|
|
Verified required corrections, inspection passed.
|
FIRE-Final Inspection | 8/30/2007 | 8/31/2007 | 8/31/2007 | P | CANC |
Forrest France
|
|
|
Overbooked
|
Code Occupancy Approval | 8/6/2007 | 8/6/2007 | 8/6/2007 | P | PASS |
Michael Garner
|
|
|
site inspection complete - I found that the property conforms with the approved plans and conditions of approval - PASS
|
FIRE-Final Inspection | 8/2/2007 | 8/3/2007 | 8/3/2007 | A | FAIL |
Forrest France
|
|
|
Provide approved hardware at the two exit doors-see fire code review notes for requirements, mount the PFE on the wall as discussed.
|
BLD-Final | 7/12/2007 | 7/13/2007 | 7/13/2007 | A | NR |
Tony Young
|
|
|
mardi - please call 1/2 hr prior to inspection Phone #: ###-#### need plm, zoning, and f/l/s 1st,, no inspection made
|
BLD-Framing/Rough-in | 5/10/2007 | 5/11/2007 | 5/11/2007 | A | PASS |
Tony Young
|
|
|
ben ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith door frame ok
|
BLD-Footing | 11/30/2006 | 12/1/2006 | 12/1/2006 | P | PART |
Tony Young
|
|
|
marty; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles post holes ok
|
BLD-Conference | 10/13/2006 | 10/13/2006 | 10/13/2006 | P | PASS |
Tony Young
|
|
|
Martie -- after 2pm,?s on ramp; Phone #: ###-#### general ?s
|
BLD-Conference | 10/12/2006 | 10/13/2006 | 10/13/2006 | A | CANC |
Tony Young
|
|
|
Martie, ADA ?s on ramp,, prior to 11am; Phone #: ###-#### out of time
|
Issue PAID IN FULL permit | | | 8/31/2006 | | DONE |
|
|
|
|
Additional plans submitted | | | 8/7/2006 | | DONE |
|
|
|
Received letter requesting alternate to let the tub stay as is as a decorative element with the water and sewer to the tub being disconnected. Routed to Georgr slane building Official and approved. copy on plans and in records.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/7/2006 | | PASS |
|
|
|
Approved for issue as noted on and all attached plan review conditions.
|
Routing - PLANNING | 8/7/2006 | | 8/7/2006 | | PASS |
|
|
|
All requirements of CU and DR have been met.
|
Print Occupancy Form | | | 8/7/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/7/2006 | | DONE |
|
|
|
|
Telephone call | | | 8/7/2006 | | DONE |
|
|
|
Spoke with Pat and told him that permitis ready & fees...also that we need ACHD, GC & the GC's registration #///8/7/06 @ 9:43am BAS
|
Routing - PLAN CHECK | 6/28/2006 | | 8/7/2006 | | PASS |
|
|
|
Approved as red-lined on and attached plan review conditions.
|
Plan resubmittals received | | | 8/4/2006 | | DONE |
|
|
|
Received 1 letter to Marlene S. & George S. taken to George S. to sign then will need to go to Dan S.
|
Telephone call | | | 8/1/2006 | | DONE |
|
|
|
After talking with George and Marlene, I called Pat to tell him to re-write tje last sentence to feflect the water and sewer to the tub will be disconnected and capped; indicate the sign stating for historical decorative feature only, not for use; and provide a signature line and date line for George slane to sign when the request is approved.
|
Print Occupancy Form | | | 7/27/2006 | | DONE |
|
|
|
|
CHANGE STATUS TO (REV) | | | 7/27/2006 | | DONE |
|
|
|
error changed back to rev from Dan Stuart
|
Plan Reviewer's activity | | | 7/27/2006 | | DONE |
|
|
|
Was notified by permit desk that I had errored in taking plans to front for permit issuance. Plans had not been approved by Planning. I faxed Pat McKeegan & Mardi Stacy concerning the Planning requirements needing to be addressed.
|
Plan resubmittals received | | | 7/26/2006 | | |
|
|
|
Received 1 copy of Plan review response letter, 2 copies of beam, column & footing design calcs, 2 copies of the following sheets--T1.0, A0, A1.0, A1.1, A2.0 and taken to Dan Stuart
|
Plan Reviewer's activity | | | 7/26/2006 | | DONE |
|
|
|
After inserting the architect plan resubmittals into original plans and correcting items not answered or addressed correctly by architect I created a plan clarification list with code details and attached to plans as part of the approved plan to avoid further delay in issuing this permit. I e-mailed a copy of the plan clarifications to Pat McKeegan and Mardi Stacy. Routing plans to permit desk.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/26/2006 | | PASS |
|
|
|
Approved as noted on and attached plan review clarifications as part of approved plans.
|
Plan assigned to (DRS) | 6/1/2006 | | 7/26/2006 | | PASS |
|
|
|
7/26/2006 19:26:40 DRS - activity updated through activity BLDA022 from case BLD06-01483.
|
Routing - PLAN CHECK | 7/11/2006 | | 7/25/2006 | | PASS |
|
|
|
Plans approved with attached plan review clarifications of code compliance items not correctly addressed by architect in his resubmittal response, to be verified in field by the contractor and inspectors for code compliance to avoid further delay in issuance of building permit.
|
Routing - Erosion and Sediment | 7/7/2006 | | 7/11/2006 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Plan resubmittals received | | | 7/10/2006 | | DONE |
|
|
|
Received 1 Storm Water Pollution Prevention Plan taken to Dan S.
|
Routing - PUBLIC WORKS | 7/7/2006 | | 7/7/2006 | | PASS |
|
|
|
|
Routing - FIRE | 6/22/2006 | | 6/28/2006 | | PASS |
|
|
|
Attached review comments to plans.
|
1st review completed | | | 6/28/2006 | | FAIL |
|
|
|
Failed plan check.
|
Plan resubmittals requested | | | 6/23/2006 | | DONE |
|
|
|
Faxed and e-mailed copy of plan review items needing response to architect.
|
Routing - PLAN CHECK | 6/9/2006 | | 6/23/2006 | | FAIL |
|
|
|
Plan review e-mailed and faxed to Pat McKeegan for required resubmittals.
|
Plan resubmittals received | | | 6/21/2006 | | DONE |
|
|
|
Recieved esc narrative, routed to plan reviewer
|
Plan resubmittals received | | | 6/21/2006 | | DONE |
|
|
|
Received 1 transmittal, 2 copys of Grading & Drainage sheets & 2 copys of sheets A 0 taken to Dan S.
|
Routing - PLANNING | 6/9/2006 | | 6/9/2006 | | FAIL |
|
|
|
Applicant must submit a copy of parking agreement required by CUP, and a min. of 22' of back-up space must be provided behind parking spaces on alley. Faxed applicant at 3:30 p.m. today. CER
|
Routing - Erosion and Sediment | 6/7/2006 | | 6/9/2006 | | FAIL |
|
|
|
ESC plan failed. Only one copy of the narrative was included with the submittal. Notified PD.
|
Routing - PLANNING Land Div | 6/1/2006 | | 6/7/2006 | | PASS |
|
|
|
parcel is a platted lot.
|
Routing - PUBLIC WORKS | 6/7/2006 | | 6/7/2006 | | FAIL |
|
|
|
Requires drainage plan.
Contact Brian Murphy at ###-####
|
Plans ACCEPTED BY PLAN TECH | | | 5/24/2006 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/24/2006 | | DONE |
|
|
|
|
Application received | | | 5/23/2006 | | |
|
|
|
|
Third Notice BLD | 10/30/2007 | 10/30/2007 | | | |
|
|
|
Second Notice has not been responded to.
|