Third Notice BLD | 3/21/2007 | 3/21/2007 | 3/28/2007 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 3/8/2007 | 3/8/2007 | 3/21/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 2/9/2007 | 3/8/2007 | | DONE |
|
|
|
|
Permanent occupancy UNPAID FEE | | | 2/5/2007 | | DONE |
|
|
|
Perm. Occ. Cert. # 11426 issued 2-5-07 to Muse Studios.
|
BLD-Final | 2/1/2007 | 2/2/2007 | 2/2/2007 | A | PASS |
Dave Hannah
|
|
|
scott; Phone #: ###-#### Internet Inspection Request from: Victoria Beall ok for perm occ
|
Permanent Occupancy | | 2/2/2007 | 2/2/2007 | | DONE |
|
|
|
|
BLD-Final | 1/29/2007 | 1/30/2007 | 1/30/2007 | A | FAIL |
Jim Storey
|
|
|
scott; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles unabl to verify any of the plan or planreview notes
|
FIRE-Final Inspection | 1/29/2007 | 1/29/2007 | 1/29/2007 | P | PASS |
Forrest France
|
|
|
Items on c/n have been verified for completion, life safety finaled.
|
Code Occupancy Approval | 1/19/2007 | 1/19/2007 | 1/19/2007 | P | PASS |
Michael Garner
|
|
|
site inspection complete - officer confirmed that the plans have been followed - pass -
|
COD-Stop Work/Reinspection Fee | 1/19/2007 | 1/19/2007 | 1/19/2007 | P | CANC |
Michael Garner
|
|
|
|
FIRE-Final Inspection | 1/18/2007 | 1/18/2007 | 1/18/2007 | P | FAIL |
Forrest France
|
|
|
Need to provide exit signage as indicated on approved plan set, lower height and relocate the provided fire extinguisher to within allowable travel distances, repair the exit discharge light at the south exit, enable testing for the duct smoke detector.
|
BLD-Aging Inspection | 11/20/2006 | 11/20/2006 | 11/24/2006 | | PASS |
Dave Hannah
|
|
|
|
Issue PAID IN FULL permit | | | 8/21/2006 | | DONE |
|
|
|
|
Telephone call | | | 8/4/2006 | | DONE |
|
|
|
tlk to catherine siewell ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 8/4/2006 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 6/20/2006 | | 8/3/2006 | | PASS |
|
|
|
Drawings approved after resubmittal review.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/3/2006 | | DONE |
|
|
|
|
Print Occupancy Form | | | 8/3/2006 | | |
|
|
|
|
Plan assigned to (CJW) | 6/2/2006 | | 8/3/2006 | | PASS |
|
|
|
8/3/2006 15:11:59 CJW - activity updated through activity BLDA022 from case BLD06-01521.
|
Plan resubmittals received | | | 8/1/2006 | | |
|
|
|
Received transmittal sheet, 2pg. response, 1pg. letter regarding Seismic Analysis of Existing Masonry Wall, 6pg. Structural Calculations, 2 copies of the following pages: A2.1, A3.1, A3.2, A4.1, M2.0, M3.0, E2.0L, E2.0P, E2.0S, E3.0; taken to Carl Westfall
|
1st review completed | | | 6/20/2006 | | FAIL |
|
|
|
Failed Plan check.
|
Routing - FIRE | 6/15/2006 | | 6/20/2006 | | PASS |
|
|
|
Attached review comments to plans.
|
Routing - PLANNING | 6/13/2006 | | 6/15/2006 | | PASS |
|
|
|
To Cody. Has the landscaping work approved in 2002 been completed? Is parking adequate? Have the exterior changes to the North wall that were done in 2002 been approved?
Plans indicate compliance with CZC06-00088. However, occupancy shall not be granted until completion of previous requirements from DRH02-00132.
|
Routing - PLAN CHECK | 6/5/2006 | | 6/13/2006 | | FAIL |
|
|
|
The IBC plan review was started on June 9 and was finished on June 14. Revised drawings were required. See the plan review report.
The conditions of CZC06-00088 have been met. Occupancy shall not be granted until compliance with conditions of DRH02-00132 are met.
|
Routing - PUBLIC WORKS | 6/2/2006 | | 6/5/2006 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/30/2006 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/30/2006 | | |
|
|
|
|
Application received | | | 5/25/2006 | | |
|
|
|
|