Permit Information
Permit NumberBLD06-01538
StatusFinaled
Name INLAND BUILDERS
Site Address 2173 S GEKELER LN
Project NameTAG CONDOMINIUMS
Customer Number 
ePlanReviewNo
Description
(Thomas Lynch - RCE-5293) TAG CONDOMINIUMS (Units 6 & 7 at 2173 & 2175 S. Gekeler Ln) To construct a new 5,050 sq. ft. two story two-family dwelling (duplex) (condominium). Each unit has three bedrooms, two and one-half bathrooms, is a two story unit with 1,978 sq. ft. (769 sq. ft. 1st floor / 1209 sq. ft. 2nd floor) with an attached 547 sq. ft. two car garage and a 28 sq. ft. covered front porch. All construction per approved plans, engineering, red-lined notes & attached plan review clarification conditions of all reviewing agencies. CUP04-00031 per Karen Gallagher with Planning & Zoning. SAM/drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Letter of compliance/Occupancy  6/4/2018 DONE
BLD-Final5/12/20085/13/20085/13/2008APASS
DetailsJim Storey
pat Phone #: ###-####
DOC - Permit Finaled5/13/20085/13/20085/13/2008PPASS
DetailsJim Storey
BLD-Final5/12/20085/12/20085/12/2008PDEFR
DetailsJim Storey
pat Phone #: ###-#### rolled over out of time.
FIRE-Final Inspection5/7/20085/8/20085/8/2008APASS
DetailsTroy Cobbley
fire life safety passed. There was no card on site to sign.
BLD-Final5/2/20085/5/20085/6/2008ANR
DetailsJim Storey
pat
FIRE-Final Inspection5/2/20085/5/20085/5/2008AFAIL
DetailsForrest France
One smoke alarm at the second floor hallway at unit 2175 needs to be relocated due to proximity to the HVAC grill, skylight, and location closer than 3' to the bathroom door containing a shower-see fire code review notes for requirements, retested smoke alarm at unit 2173 repaired okay, remainder of life safety issues are acceptable.
BLD-Final5/2/20085/2/20085/2/2008PNR
DetailsJim Storey
pat Phone #: ###-#### need plm
Code Occupancy Approval  5/1/2008 DONE
Landscaping meets bld requirements
BLD-Final4/28/20084/29/20084/29/2008PCANC
DetailsJim Storey
Pat; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
FIRE-Final Inspection4/28/20084/29/20084/29/2008AFAIL
DetailsForrest France
Noted one smoke alarm at the second floor hallway unti 2173 that is not interconnected, unit 2175 is not ready for final life safety at this time due to condition of the project and missing smoke alarms not yet installed.
Print Occupancy Form  4/24/2008 DONE
Code Occupancy Approval  6/28/2007 DONE
Excellent landscaping on site
FIRE-Final Inspection6/26/20076/27/20076/27/2007ANR
DetailsForrest France
Building is not ready for final inspection at this time.
BLD-Framing/Rough-in1/11/20071/16/20071/16/2007APASS
DetailsJim Storey
bill; Phone #: ###-#### Internet Inspection Request from: Barbara Stitt
BLD-Energy code compliance1/16/20071/16/20071/16/2007PPASS
DetailsJim Storey
bill; Phone #: ###-#### Internet Inspection Request from: Barbara Stitt
BLD-Framing/Rough-in1/8/20071/10/20071/10/2007APART
DetailsJim Storey
bill ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
BLD-Conference12/5/200612/6/200612/6/2006APART
DetailsJim Storey
larry ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith exterior fire protction ok for cover.
BLD-Other11/8/200611/9/200611/9/2006APASS
DetailsJim Storey
larry - note: fire wall inspection for 1st and 2nd floors ; Phone #: ###-#### Internet Inspection Request from: Patricia Smithgyp ok
BLD-Foundation10/17/200610/18/200610/18/2006PPASS
DetailsJim Storey
matt; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
BLD-Footing10/16/200610/17/200610/17/2006PPASS
DetailsJim Storey
matt; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
OVERRIDE  10/5/2006  
Override - People Holds  10/5/2006  
Issue PAID IN FULL permit  10/5/2006 DONE
Print Occupancy Form  10/5/2006 DONE
Telephone call  10/5/2006 DONE
tlk to kris ###-#### that permit and fees are ready to be picked up
Override - People Holds  10/5/2006  
Permit Ready to Issue  10/5/2006 DONE
Routing - Erosion and Sediment10/3/2006 10/4/2006 PASS
Routing - PLAN CHECK10/4/2006 10/4/2006 PASS
Approved as noted on and attached to plans. Routing to permit desk to issue.
PLANS/APPL TAKEN TO FRONT DESK  10/4/2006 PASS
Plan assigned to (DRS)9/20/2006 10/4/2006 PASS
10/4/2006 15:00:01 DRS - activity updated through activity BLDA022 from case BLD06-01538.
Plan resubmittals received  10/3/2006  
Received letter from Elam & Burke Attorneys regarding ACHD review of the drainage plans; taken to Dan Stuart
Routing - PLAN CHECK9/20/2006 10/3/2006 PEND
No additional submittals required. Plans red-lined with attached plan review conditions for clarification. Routing back to ESC for re-review approval of RP.
Plan assigned to (SAM)6/27/2006 9/20/2006 ----
Reassigned to Dan Stuart by M.Southard
Routing - PLAN CHECK7/17/2006 9/20/2006 FAIL
Project transfered to me from Steve Monroe by Marlene.
1st review completed  7/17/2006 FAIL
Failed plan check.
Routing - FIRE7/12/2006 7/17/2006 PASS
Attached rieview comments to plans.
Routing - PLAN CHECK6/27/2006 7/12/2006 FAIL
Routing - PLANNING6/22/2006 6/27/2006 PASS
CUP04-0003 Karen Gallagher. AW: Letter needed from drainage district to certify approval prior to issuance of blg. permit per conditions of approval.CUP04-0003 Karen Gallagher
Plan assigned to (M_P)5/30/2006 6/27/2006 ----
REASSIGNED TO STEVE MUNROE BY MYS
Routing - PLUMBING6/15/2006 6/22/2006 PASS
no review required
Routing - Erosion and Sediment6/14/2006 6/15/2006 PASS
No RP identified. Notified applicant.
Routing - PUBLIC WORKS6/7/2006 6/14/2006 PASS
Routing - PLANNING Land Div6/1/2006 6/7/2006 PASS
condo plat is recorded.
Recd Pcfee & Taken To Pln CK  6/1/2006  
Plans ACCEPTED BY PLAN TECH  6/1/2006  
Plan routing begun/NEW & ADDTN  6/1/2006  
Application received  5/26/2006