BLD-Final | 3/6/2009 | 3/9/2009 | 3/9/2009 | A | PASS |
Jim Storey
|
|
|
Pat ###-####
|
DOC - Permit Finaled | 3/9/2009 | 3/9/2009 | 3/9/2009 | P | PASS |
Jim Storey
|
|
|
|
FIRE-Final Inspection | 3/5/2009 | 3/6/2009 | 3/6/2009 | A | PASS |
Forrest France
|
|
|
Fire life safety inspection completed acceptable, signature card not available on site.
|
Fee Review-notes | 3/5/2009 | 3/5/2009 | 3/5/2009 | | DONE |
Barbara Stitt
|
|
|
Per George Slane re-open to complete final-fire life safety and structural required. 2 hrs admin
|
PubWorks Occupancy Approval | 7/1/2007 | 7/1/2007 | 3/5/2009 | | PASS |
Barbara Stitt
|
|
|
Per phone call with Dan Erskine this project was signed off on 7-1-07 by Dan Erskine///3-5-09 BAS
|
CHANGE STATUS TO (ISS) | | | 3/5/2009 | | DONE |
Barbara Stitt
|
|
|
|
Print Occupancy Form | | | 4/24/2008 | | DONE |
|
|
|
|
Code Occupancy Approval | | | 6/28/2007 | | DONE |
|
|
|
|
FIRE-Final Inspection | 6/26/2007 | 6/27/2007 | 6/27/2007 | A | NR |
Forrest France
|
|
|
Not completed for final at this time.
|
BLD-Framing/Rough-in | 1/31/2007 | 2/1/2007 | 2/1/2007 | A | PASS |
Jim Storey
|
|
|
bill; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
|
BLD-Energy code compliance | 2/1/2007 | 2/1/2007 | 2/1/2007 | P | PASS |
Jim Storey
|
|
|
bill; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
|
BLD-Framing/Rough-in | 1/24/2007 | 1/25/2007 | 1/25/2007 | A | PART |
Jim Storey
|
|
|
bill; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
|
BLD-Foundation | 10/17/2006 | 10/18/2006 | 10/18/2006 | P | PASS |
Jim Storey
|
|
|
matt; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
|
BLD-Footing | 10/16/2006 | 10/17/2006 | 10/17/2006 | P | PASS |
Jim Storey
|
|
|
matt; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
|
OVERRIDE | | | 10/5/2006 | | |
|
|
|
|
Override - People Holds | | | 10/5/2006 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 10/5/2006 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/5/2006 | | DONE |
|
|
|
|
Telephone call | | | 10/5/2006 | | DONE |
|
|
|
|
Override - People Holds | | | 10/5/2006 | | |
|
|
|
|
Permit Ready to Issue | | | 10/5/2006 | | |
|
|
|
|
Routing - Erosion and Sediment | 10/3/2006 | | 10/4/2006 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 10/4/2006 | | 10/4/2006 | | PASS |
|
|
|
Approved as noted on and attached to plans. Routing to permit desk to issue.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/4/2006 | | PASS |
|
|
|
|
Plan assigned to (DRS) | 9/20/2006 | | 10/4/2006 | | PASS |
|
|
|
10/4/2006 15:03:20 DRS - activity updated through activity BLDA022 from case BLD06-01540.
|
Plan resubmittals received | | | 10/3/2006 | | |
|
|
|
|
Routing - PLAN CHECK | 10/3/2006 | | 10/3/2006 | | PEND |
|
|
|
Inserted resubmittals of 8/14/06 into original plans. No other esubmittals are required. Plans have been red-lined with code plan review reference number on plan sheet to the applicable plan review condition for that sheet. Routing to ESC for approval of RP.
|
Plan assigned to (SAM) | 6/27/2006 | | 9/20/2006 | | ---- |
|
|
|
Reassigned to Dan Stuart by M. Southard on 9/20/06
|
Routing - PLAN CHECK | 7/17/2006 | | 9/20/2006 | | FAIL |
|
|
|
Plan reassigned to Dan Stuart.
|
1st review completed | | | 7/17/2006 | | FAIL |
|
|
|
Failed Plan Check.
|
Routing - FIRE | 7/12/2006 | | 7/17/2006 | | PASS |
|
|
|
Attached review comments to plans.
|
Routing - PLAN CHECK | 6/27/2006 | | 7/12/2006 | | FAIL |
|
|
|
|
Routing - PLANNING | 6/22/2006 | | 6/27/2006 | | PASS |
|
|
|
CUP04-0003 Karen Gallagher. AW: Letter needed from drainage district to certify approval prior to issuance of blg. permit per conditions of approval.CUP04-0003 Karen Gallagher
|
Plan assigned to (M_P) | 5/30/2006 | | 6/27/2006 | | ---- |
|
|
|
REASSIGNED BY STEVE MUNROE BY MYS
|
Routing - PLUMBING | 6/15/2006 | | 6/22/2006 | | PASS |
|
|
|
no review required
|
Routing - Erosion and Sediment | 6/14/2006 | | 6/15/2006 | | FAIL |
|
|
|
No RP identified. Notified applicant.
|
Routing - PUBLIC WORKS | 6/7/2006 | | 6/14/2006 | | PASS |
|
|
|
|
Routing - PLANNING Land Div | 6/1/2006 | | 6/7/2006 | | PASS |
|
|
|
condo plat is recorded.
|
Recd Pcfee & Taken To Pln CK | | | 6/1/2006 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/1/2006 | | |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 6/1/2006 | | |
|
|
|
|
Application received | | | 5/26/2006 | | |
|
|
|
|