BLD-Aging Inspection | 7/8/2010 | 7/8/2010 | 7/13/2010 | | DONE |
Mike Jordan
|
|
|
|
DOC - Permit Expired | 7/13/2010 | 7/13/2010 | 7/13/2010 | P | PASS |
Mike Jordan
|
|
|
No new work in 2 plus years on shell and core. Permit is expired.
|
BLD-Framing/Rough-in | 1/24/2007 | 1/25/2007 | 1/25/2007 | A | PART |
Mike Jordan
|
|
|
jeff; Phone #: ###-#### Internet Inspection Request from: Victoria Beall. Roof nailing and trusses ok. Will reinspect after ri are complete. Contractor to install ceiling assembly.
|
BLD-Framing/Rough-in | 1/22/2007 | 1/22/2007 | 1/22/2007 | P | NR |
Mike Jordan
|
|
|
jeff; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD-Framing/Rough-in | 12/19/2006 | 12/19/2006 | 12/19/2006 | P | PART |
Mike Jordan
|
|
|
1 hr. seperation wall.
|
BLD-Framing/Rough-in | 12/19/2006 | 12/19/2006 | 12/19/2006 | P | PART |
Mike Jordan
|
|
|
Shear wall nailing.
|
BLD-Framing/Rough-in | 12/18/2006 | 12/19/2006 | 12/19/2006 | A | CANC |
Mike Jordan
|
|
|
Mark Note: shear panal; Phone #: ###-#### Internet Inspection Request from: Sherri Bennett. Contractor not ready. resceduled for this afternoon.
|
(F) Reprint permit | | | 9/29/2006 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 9/28/2006 | | |
|
|
|
|
Inspection Record Card- Bld | | | 9/12/2006 | | |
|
|
|
|
Telephone call | | | 9/12/2006 | | |
|
|
|
lft ms for jerry teal ###-#### that permit and fees are ready to be picked up but needs ACHD
|
Permit Ready to Issue | | | 9/12/2006 | | |
|
|
|
|
Routing - PLAN CHECK | 9/8/2006 | | 9/11/2006 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/11/2006 | | DONE |
|
|
|
|
Plan assigned to (JCM) | 6/5/2006 | | 9/11/2006 | | PASS |
|
|
|
9/11/2006 11:49:45 JCM - activity updated through activity BLDA022 from case BLD06-01573.
|
Routing - PLANNING Land Div | 9/6/2006 | | 9/7/2006 | | PASS |
|
|
|
site plan matches ROS now.
|
Routing - PLANNING Land Div | 8/14/2006 | | 9/6/2006 | | |
|
|
|
|
Plan Reviewer's activity | | | 9/6/2006 | | DONE |
|
|
|
Inserted revised plan sheets and routed back to Todd in Land-Division for review. JCM
|
Routing - PLAN CHECK | 9/6/2006 | | 9/6/2006 | | |
|
|
|
|
Plan resubmittals received | | | 9/5/2006 | | DONE |
|
|
|
Received 1 transmittal,3 structural calcs and 3 copys of sheets A-1a,A-1b,A1-1c,A2-1,A2.2,A2.3,A2-4,A3.2 Taken to John M.
|
Routing - PLANNING | 7/24/2006 | | 7/25/2006 | | PASS |
|
|
|
Approved per DRH06-00376 Mod #1
|
Plan Reviewer's activity | | | 7/21/2006 | | PASS |
|
|
|
Reviewed and approved resubmitted plans for both structural and non structural revisions with attached comment list and red lined notes. JCM
|
Plan resubmittals received | | | 7/20/2006 | | |
|
|
|
Received 1 plan reveiw response letter from Gerald Teal, 3 sets of plan review responses from Lochsa Engineering, 2 copies of the following sheets--A2-1, A2-2, A3-1, A3-2, A4-1, A4-2, A7-1, A7-2, 3 copies of the following sheets--A1-3, A2-3, A2-4 and taken to John Menard
|
Routing - FIRE | 6/26/2006 | | 6/29/2006 | | PASS |
|
|
|
Attached review comments to plans.
|
1st review completed | | | 6/29/2006 | | FAIL |
|
|
|
Failed Planning & Plan Check.
|
Routing - PLAN CHECK | 6/23/2006 | | 6/26/2006 | | FAIL |
|
|
|
|
Routing - PLANNING | 6/21/2006 | | 6/23/2006 | | FAIL |
|
|
|
Failed: no revised site plan; unapproved changes to building elevations
|
Routing - PLUMBING | 6/9/2006 | | 6/21/2006 | | PASS |
|
|
|
per plans and 2003 upc
|
Routing Off Site - STRUCTURAL | 6/5/2006 | | 6/21/2006 | | FAIL |
|
|
|
Called Action Couriers for pick up - Received comment list from the consulting structural engineer requesting revisions. JCM
|
Plan resubmittals requested | | | 6/21/2006 | | DONE |
|
|
|
Faxed the architect a copy of the comment list from the consulting structural engineer requesting revisions. JCM
|
Plan resubmittals requested | | | 6/20/2006 | | DONE |
|
|
|
E-mailed the architect a copy of the plan review requesting revisions. JCM
|
Plan resubmittals received | | | 6/19/2006 | | |
|
|
|
Received 2 copies of A1-1a and taken to John Menard
|
Routing - Erosion and Sediment | 6/8/2006 | | 6/9/2006 | | PASS |
|
|
|
6/9/06 Refer to ESC05-00837 as master plan for Smoke Ranch #2.adh.
|
Routing - PUBLIC WORKS | 6/7/2006 | | 6/8/2006 | | PASS |
|
|
|
|
Routing - PLANNING Land Div | 6/5/2006 | | 6/7/2006 | | PEND |
|
|
|
A revised site plan is needed showing the proper labeling of the lots as Parcel A and B as per the Record of Survey (7173).
|
Plans ACCEPTED BY PLAN TECH | | | 6/5/2006 | | |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 6/5/2006 | | |
|
|
|
|
Application received | | | 5/31/2006 | | |
|
|
|
|