Permit Information
Permit NumberBLD06-01574
StatusFinaled
Name JAYO CONSTRUCTION
Site Address 10524 W BUSINESSPARK LN
Project NameSouthwind Business Park
Customer Number 
ePlanReviewNo
Description
Southwind Business Park - Building "L" (Shell) - To construct a new 1380 square foot, one story, wood framed office shell building and related site improvements. This is a shell permit only and no occupancy is allowed under this permit. A separate tenant improvement permit is required to finish this building for occupancy. All construction per the approved plans. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Finaled  7/8/2008  
DetailsTisha Gallop
Letter of compliance issued on 4/18/08 by building inspector 450
Temporary occupancy  4/19/2007 DONE
Temp. Occ. Cert. # 5568 issued 4-19-07 to Southwind Business Park, Bldg. L (shell only) ready for letter of compliance when Code Enforcement signs off for final
Code Occupancy Approval Temp4/18/20074/18/20074/18/2007PPASS
DetailsScott M.Brown
WE HAVE BOND FOR TOTAL PROJECT OK FOR TEMP ON THIS BUILDING.
BLD-Final4/17/20074/18/20074/18/2007APART
DetailsMike Jordan
jeff; Phone #: ###-#### Internet Inspection Request from: Victoria Beall. Final is ok. Letter of compliance was issued for shell. Will be ok to final permit once code enforcement goes perm.
FIRE-Final Inspection4/17/20074/17/20074/17/2007PPASS
DetailsTroy Cobbley
Life safety passed
FIRE-Final Inspection4/16/20074/16/20074/16/2007PFAIL
DetailsTroy Cobbley
Provide suite number, tag fire extinguisher and repair the exit sign/emergency light
BLD-Framing/Rough-in3/1/20073/1/20073/1/2007PPASS
DetailsMike Jordan
jeff; Phone #: ###-#### Internet Inspection Request from: Victoria Beall. ok to insul. wip on firecaulking, and eaves.
BLD-Framing/Rough-in1/24/20071/25/20071/25/2007APART
DetailsMike Jordan
jeff; Phone #: ###-#### Internet Inspection Request from: Victoria Beall. Roof nailing ok. Trusses ok. Will reinspect after ri complete. Wants to install ceiling assembly.
BLD-Framing/Rough-in1/22/20071/22/20071/22/2007PNR
DetailsMike Jordan
jeff; Phone #: ###-#### Internet Inspection Request from: Darla Downs
BLD-Conference1/15/20071/16/20071/16/2007APART
DetailsMike Jordan
FIRE WALL Phone #: ###-####. Framing insp on 1hr wall. ok.
BLD-Framing/Rough-in1/15/20071/16/20071/16/2007ACANC
DetailsMike Jordan
Scheduled by a contractor via Hello! on 1/15/2007 at 2:15:36 PM. Contact: ###-####.
BLD-Framing/Rough-in12/22/200612/22/200612/22/2006PPART
DetailsTom Arcoraci
mark//fire wall inspection please; Phone #: ###-#### Internet Inspection Request from: Barbara Stitt nailing ok
BLD-Framing/Rough-in12/19/200612/19/200612/19/2006PPART
DetailsMike Jordan
1 hr seperation wall.
BLD-Framing/Rough-in12/19/200612/19/200612/19/2006PPART
DetailsMike Jordan
shear wall nailing.
BLD-Framing/Rough-in12/18/200612/19/200612/19/2006ACANC
DetailsMike Jordan
Mark Note: shear panal; Phone #: ###-#### Internet Inspection Request from: Sherri Bennett. Contractor not ready. rescheduled for this afternoon.
(F) Reprint permit  9/29/2006  
Issue PAID IN FULL permit  9/28/2006 DONE
Inspection Record Card- Bld  9/12/2006 DONE
Telephone call  9/12/2006  
lft ms for jerry teal ###-#### that permit and fees are ready to be picked up but needs ACHD
Permit Ready to Issue  9/12/2006  
Routing - PLAN CHECK9/8/2006 9/11/2006 PASS
PLANS/APPL TAKEN TO FRONT DESK  9/11/2006 DONE
Plan assigned to (JCM)6/5/2006 9/11/2006 PASS
9/11/2006 11:50:26 JCM - activity updated through activity BLDA022 from case BLD06-01574.
Routing - PLANNING Land Div9/6/2006 9/7/2006 PASS
site plan matches ROS now.
Plan Reviewer's activity  9/6/2006 DONE
Inserted revised plan sheets and routed back to Todd in Land-Division for review. JCM
Routing - PLAN CHECK9/6/2006 9/6/2006  
Plan resubmittals received  9/5/2006 DONE
Received 1 transmittal,3 structural calcs and 3 copys of sheets A-1a,A-1b,A1-1c,A2-1,A2.2,A2.3,A2-4,A3.2 Taken to John M.
Routing - PLANNING7/24/2006 7/25/2006 PASS
Approved per DRH06-00376 Mod #1
Plan Reviewer's activity  7/21/2006 PASS
Reviewed and approved resubmitted plans for both structural and non structural revisions with attached comment list and red lined notes. JCM
Plan resubmittals received  7/20/2006  
Received 1 plan reveiw response letter from Gerald Teal, 3 sets of plan review responses from Lochsa Engineering, 2 copies of the following sheets--A2-1, A2-2, A3-1, A3-2, A4-1, A4-2, A7-1, A7-2, 3 copies of the following sheets--A1-3, A2-3, A2-4 and taken to John Menard
1st review completed  6/29/2006 FAIL
Failed Planning & Plan Check.
Routing - FIRE6/26/2006 6/29/2006 PASS
Attached review comments to plans.
Routing - PLAN CHECK6/23/2006 6/26/2006 FAIL
Routing - PLANNING6/21/2006 6/23/2006 FAIL
Failed: no revised site plan; unapproved changes to building elevations
Routing - PLUMBING6/9/2006 6/21/2006 PASS
per plans and 2003 upc
Routing Off Site - STRUCTURAL6/5/2006 6/21/2006 FAIL
Called Action Couriers for pick up - Received comment list from the consulting structural engineer requesting revisions. JCM
Plan resubmittals requested  6/21/2006 DONE
Faxed the architect a copy of the comment list from the consulting structural engineer requesting revisions. JCM
Plan resubmittals requested  6/20/2006 DONE
E-mailed the architect a copy of the plan review requesting revisions. JCM
Plan resubmittals received  6/19/2006  
Received 2 copies of A1-1a and taken to John Menard
Routing - Erosion and Sediment6/8/2006 6/9/2006 PASS
6/9/06 Refer to ESC05-00837 as master plan for Smoke Ranch #2.adh.
Routing - PUBLIC WORKS6/7/2006 6/8/2006 PASS
Routing - PLANNING Land Div6/5/2006 6/7/2006 PEND
A revised site plan is required showing the property labeling of the lots as Parcel A and B as per the Record of Survey (7173).
Plans ACCEPTED BY PLAN TECH  6/5/2006  
Plan routing begun/NEW & ADDTN  6/5/2006  
Application received  5/31/2006