Permit Information
Permit NumberBLD06-01589
StatusFinaled
Name IDAHO TRUST NATIONAL BANK
Site Address 896 W BROAD ST
Project NameBODO BLDG #4
Customer Number 
ePlanReviewNo
Description
(RCE-764) (IDAHO TRUST NATIONAL BANK - BODO BLDG #4 - 1ST AND 2ND STORIES) This building is fire sprinklered for area increase. To create a 10,108 square foot bank tenant space on the 1st and 2nd stories of BoDo Building #4. The 1st story will have a floor area of 3,591 square feet at grade and 590 square feet on a mezzanine. The 1st story will include a bank lobby, teller station, offices, file room, and secured cash room. The mezzanine will include a gallery for the display of art. The 2nd story will have a floor area of 5,927 square feet. The 2nd story will include a board room, conference rooms, offices, file room, and restrooms. Work on the 1st story includes an elevator pit, a glass elevator shaft, an elevator accessible to the disabled, interior nonbearing walls, interior doors, interior windows, interior bearing walls, shear walls, concrete footings, steel beams and columns, concrete mezzanine floor, and finishes. Work on the 2nd story includes 2 restrooms accessible to the disabled, interior nonbearing walls, an elevator shaft, interior doors, interior windows, and finishes. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes. The fire sprinkler system shall comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice BLD2/2/20072/2/20072/12/2007 DONE
First Notice has not been responded to.
First Notice 1/5/20072/2/2007 DONE
Permanent occupancy  1/5/2007 DONE
Perm. Occ. Cert. # 11381 issued 1-3-07 to the Idaho Trust National Bank.
BLD-Final1/2/20071/3/20071/3/2007APASS
DetailsDave Hannah
Jan; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt ok for perm occ
Temporary occupancy  11/6/2006 DONE
Temp. Occ. Cert. # 5471 issued 11-6-06 to Idaho Trust National Bank.
FIRE-Final Inspection9/28/200610/2/200610/2/2006APASS
DetailsForrest France
Fire life safety passed final inspection.
BLD-Final9/22/20069/25/20069/26/2006PPART
DetailsDave Hannah
jan; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok for temp occ need to relock front door
FIRE-Final Inspection9/25/20069/25/20069/25/2006PPART
DetailsForrest France
Fire life safety is satisfactory pending final of project related alarm permit including completion of smoke and heat detectors at the top of the elevator hoistway. Temporary occupancy has been granted for the second floor portion of this tenant.
FIRE-Final Inspection9/22/20069/25/20069/25/2006AFAIL
DetailsForrest France
Project related fire alarm permit must be finaled prior to life safety final, need to relocate two and add one exit sign as discussed, need to install visual indicators at the main entry/exit door locks per review notes.
BLD-Final9/21/20069/22/20069/25/2006PNR
DetailsDave Hannah
jan ; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley needs other trades finaled
FIRE-Final Inspection9/21/20069/22/20069/22/2006PNR
DetailsForrest France
Project related alarm permit must be finaled prior to BLD life safety final.
BLD-Framing/Rough-in9/14/20069/15/20069/15/2006APART
DetailsDave Hannah
jan -ceiling cover; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley ok to cover ceiling
FIRE-Final Inspection8/18/20068/21/20068/21/2006APART
DetailsForrest France
c/n items related to the 2nd floor life safety have been completed. No inspections for the 1st floor have been done at this time regarding alarm, sprinkler, or life safety.
BLD-Final8/17/20068/18/20068/18/2006APART
DetailsDave Hannah
Jan; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt ok to occ second floor after fire oks
FIRE-Final Inspection8/17/20068/18/20068/18/2006AFAIL
DetailsForrest France
Provide addressing for the second floor, hardware at the boardroom must meet code requirements, 2nd floor only life safety inspection completed today.
BLD-Final8/16/20068/17/20068/17/2006PCANC
DetailsDave Hannah
jan - temp occupancy insp; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
FIRE-Final Inspection8/17/20068/17/20068/17/2006PNR
DetailsForrest France
Project is not ready for life safety inspection at this time, advised contractor of remaining issues.
BLD-Final8/14/20068/15/20068/15/2006PNR
DetailsDave Hannah
jan; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Other8/15/20068/15/20068/15/2006PPART
DetailsDave Hannah
jan; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ceiling grid ok drop in pannels after elec and fire r/is are completed
BLD-Concrete8/14/20068/15/20068/15/2006APART
DetailsDave Hannah
slab inspection; Phone #: ###-#### Internet Inspection Request from: Barbara Stitt slab for mezz. ok to pour
BLD-Wall cover8/2/20068/3/20068/3/2006PPART
DetailsDave Hannah
jan Note: if possible right after lunch or before ; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ground floor ext walls
BLD-Energy code compliance8/2/20068/3/20068/3/2006PPART
DetailsDave Hannah
jan Note: if possible right after lunch or before ; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ground floor ext wall around columns ok to cover
BLD-Energy code compliance7/20/20067/21/20067/21/2006APART
DetailsDave Hannah
jan ; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley needs to finish vapor barr
BLD-Energy code compliance7/19/20067/20/20067/20/2006AFAIL
DetailsDave Hannah
Scheduled by a contractor via Hello! on 7/19/2006 at 3:49:22 PM. Contact: ###-####. needs a class a vis queen
BLD-Wall cover7/18/20067/19/20067/19/2006APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 7/18/2006 at 3:09:00 PM. Contact: ###-####. ok to insulate ext walls on second floor ok to cover perimeter walls on second floor
BLD-Foundation7/17/20067/18/20067/18/2006APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 7/17/2006 at 2:12:37 PM. Contact: ###-####.
BLD-Footing7/14/20067/17/20067/17/2006PFAIL
DetailsDave Hannah
Scheduled by a contractor via Hello! on 7/14/2006 at 10:19:31 AM. Contact: ###-####. rebar not per plan
Print Occupancy Form  7/13/2006 DONE
Telephone call  7/13/2006 DONE
lft vm for martin powell ###-#### that permit and fees are ready to be picked up
Permit Ready to Issue  7/13/2006 DONE
Issue PAID IN FULL permit  7/13/2006 DONE
Plan Reviewer's activity  7/12/2006 DONE
E-mailed the architect's rep. and asked for a copy of mechanical heating and cooling load calculations. They were not included in the resubmittal package.
Plan resubmittals received  7/12/2006  
Received transmittal letter, 2 copies of M1.0; taken to Carl Westfall
Routing - FIRE7/12/2006 7/12/2006 PASS
Attached review comments to plans.
Routing - PLAN CHECK7/12/2006 7/12/2006 DONE
PLANS/APPL TAKEN TO FRONT DESK  7/12/2006 DONE
Plan assigned to (CJW)6/7/2006 7/12/2006 PASS
7/12/2006 14:58:12 CJW - activity updated through activity BLDA022 from case BLD06-01589.
Routing - PLAN CHECK7/7/2006 7/12/2006 PASS
Drawings approved after resubmittal review.
Plan resubmittals received  7/11/2006  
Received 1 Plan review commets letter from ZGA, 2 copies of supplemental structural calcs, 2 copies of A2.1, A2.2, A3.2, A4.1, A4.2, A5.1, A5.2, I-1.01 and taken to Carl Westfall
1st review completed  7/7/2006 FAIL
Failed Plan Check and Fire.
Routing - FIRE7/6/2006 7/7/2006 FAIL
Faxed resubmittal items to architect. Attached review comment to plans.
Routing - PLAN CHECK6/7/2006 7/6/2006 FAIL
The IBC plan review was initially started on June 23, 2006. The review was suspended because the drawings were not complete enough to do a plan review. The IBC plan review was started again on July 3, 2006 and was finished on July 6, 2006. Revised drawings were required. See the plan review report.
Plan resubmittals received  6/29/2006  
received "2" sets of plans including letter of transmittal sheet, & "3" structural calculations from idaho trust national bank, & :2: sheets of A1.0, A2.1, A2.2, A3.1, A3.2, A4.1, A4.2, A5.1, A5.2, 1-1.01, 1-1.02, S101, S102, EN-1, (4) sheets of P1.1, P1.2, P1.3, P1.4, P1.5, M1.0, M2.0, M3.0, E1.1L, E1.2L, E1.1P, E1.2P, E1.1S, E1.2S, & E2.0--plans taken to carl westfall
Routing - PUBLIC WORKS6/7/2006 6/7/2006 PASS
Plans ACCEPTED BY PLAN TECH  6/5/2006  
Application received  6/1/2006  
Recd Pcfee & Taken To Pln CK  6/1/2006 DONE
Third Notice BLD2/12/20072/12/2007   
Second Notice has not been responded to.