BLD-Final | 1/29/2007 | 1/30/2007 | 1/30/2007 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 1/29/2007 at 12:26:52 PM. Contact: ###-####.
|
DOC - Permit Finaled | 1/30/2007 | 1/30/2007 | 1/30/2007 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 1/25/2007 | 1/26/2007 | 1/26/2007 | A | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 1/25/2007 at 2:05:40 PM. Contact: ###-####. needs hand railing on stairs and tempered glass upstairs patio doors
|
BLD-Grading Inspection | 1/25/2007 | 1/25/2007 | 1/25/2007 | | DONE |
|
|
|
Final grading and drainage approved
|
BLD-Wall cover | 10/13/2006 | 10/16/2006 | 10/16/2006 | A | PASS |
Dave Hannah
|
|
|
Bob; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt insulation ok ok to cover
|
BLD-Wall cover | 10/12/2006 | 10/13/2006 | 10/13/2006 | P | CANC |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 10/12/2006 at 2:45:32 PM. Contact: ###-####. Inspection cancelled from web by: Cathy Weisshaupt
|
BLD-Framing/Rough-in | 10/10/2006 | 10/11/2006 | 10/11/2006 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 10/10/2006 at 11:06:21 AM. Contact: ###-####. c/n on site ok to cover ext wall and ok to insulate
|
BLD-Footing | 7/17/2006 | 7/18/2006 | 7/18/2006 | A | PASS |
Dave Hannah
|
|
|
dave; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|
BLD-Foundation | 7/11/2006 | 7/12/2006 | 7/12/2006 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 7/11/2006 at 1:17:25 PM. Contact: ###-####. more ftgs and wall ok to pour
|
BLD-Footing | 6/30/2006 | 7/5/2006 | 7/5/2006 | A | PART |
Dave Hannah
|
|
|
bob; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley about 70 percent off footing ok to pour will form the rest and pour later
|
Permit Ready to Issue | | | 6/30/2006 | | DONE |
|
|
|
|
Telephone call | | | 6/30/2006 | | DONE |
|
|
|
left vc for linda at gabrielli builds@###-####/told permit was ready and fee associated with it
|
Issue PAID IN FULL permit | | | 6/30/2006 | | DONE |
|
|
|
|
Plan assigned to (SAM) | 6/27/2006 | | 6/29/2006 | | PASS |
|
|
|
6/29/2006 15:07:14 SAM - activity updated through activity BLDA022 from case BLD06-01600.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/29/2006 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/29/2006 | | DONE |
|
|
|
|
Routing - PLAN CHECK | | | 6/29/2006 | | PASS |
|
|
|
|
PubWorks Subgrade Approval | 6/28/2006 | 6/28/2006 | 6/28/2006 | | DONE |
|
|
|
Footing subgrade approved
|
Plan Reviewer's activity | | | 6/28/2006 | | PEND |
|
|
|
6/28/06 11:35 I called and left a message for Tim Johnson to call me. I have questions on the calculations and drawings. Plans are on hold.
|
Routing - FIRE | 6/9/2006 | | 6/9/2006 | | PASS |
|
|
|
No fire sprinklers required (Triplett Ranch sub)
|
Routing - Erosion and Sediment | 6/8/2006 | | 6/9/2006 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PLANNING | 6/7/2006 | | 6/8/2006 | | PASS |
|
|
|
Per conditions in CFH06-22
|
Routing - PLANNING Land Div | 6/6/2006 | | 6/7/2006 | | PASS |
|
|
|
parcel is a platted lot.
|
Routing - PLANNING | 6/5/2006 | | 6/6/2006 | | FAIL |
|
|
|
Routed to subs to verify sub. status & bonding.
|
Routing - PUBLIC WORKS | 6/2/2006 | | 6/5/2006 | | PASS |
|
|
|
|
Application received | | | 6/2/2006 | | |
|
|
|
|
Routing - PUBLIC WORKS GRADING | 6/2/2006 | | 6/2/2006 | | PASS |
|
|
|
Approved as Category 1 by CFH06-00022
|