Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD06-01601
StatusFinaled
Name CSDI CONSTRUCTION INC
Site Address 1550 S KIMBALL WAY
Project Name1550 S. KIMBALL WAY
Customer Number 
ePlanReviewNo
Description
Banner Bank - To construct a new 4,240 square foot, one story, framed bank building and related site improvments. The building will have a 3,865 square foot bank office area and a 375 square foot, roof covered drive-thru area. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD4/27/20074/27/20077/27/2007 DONE
Second Notice has not been responded to.
Second Notice BLD4/9/20074/9/20074/27/2007 DONE
First Notice has not been responded to.
First Notice 3/29/20074/9/2007 DONE
Permanent occupancy UNPAID FEE  3/29/2007 DONE
Perm. Occ. Cert. # 11505 issued 3-29-07 to Banner Bank.
BLD-Final3/20/20073/20/20073/20/2007PPASS
DetailsMike Jordan
Ok for perm occ. Issue on final aff. letter has been resolved.
Permanent Occupancy 3/20/20073/20/2007 DONE
Details
Code Occupancy Approval3/9/20073/9/20073/19/2007PPASS
DetailsScott M.Brown
FINAL SIGNED AND BOND RELEASED
BLD-Final3/9/20073/12/20073/12/2007APEND
DetailsMike Jordan
mike; Phone #: ###-#### Internet Inspection Request from: Victoria Beall. Received final aff letter from special insp. agency. There is one issue that must be resolved prior to perm occ.
PubWorks Occupancy Approval3/12/20073/12/20073/12/2007 DONE
Signed final occupancy 03/06/07 by R. Rokovitz.
Print Occupancy Form  3/9/2007  
BLD-Final3/8/20073/8/20073/8/2007PNR
DetailsMike Jordan
Scheduled by a contractor via Hello! on 3/8/2007 at 9:09:43 AM. Contact: ###-####. Needs to supply final aff. letter from special insp. agency prio to perm occ.
FIRE-Final Inspection3/5/20073/6/20073/6/2007APASS
DetailsTroy Cobbley
LIfe safety passed.
BLD-Final1/18/20071/19/20071/19/2007PPASS
DetailsMike Jordan
MIKE; Phone #: ###-#### Internet Inspection Request from: Victoria Beall. ok for temp occ. Need final aff. letter from special insp. agency.
FIRE-Final Inspection1/18/20071/19/20071/19/2007APART
DetailsTroy Cobbley
A temporary occupancy was given until the fire dept. access curb painting is complete. All other life safety items are ok.
Code Occupancy Approval Temp  1/19/2007 PASS
BOND HAS BEEN POSTED FOR $20,752 FOR INCOMPLETED ITEMS SO I SIGNED TEMP OCCUPANCY
Temporary occupancy  1/19/2007 DONE
Temp. Occ. Cert. # 5517 iswsued 1-19-07 to Banner Bank.
FIRE-Final Inspection1/17/20071/18/20071/18/2007ACANC
DetailsTroy Cobbley
Per the contractor they are not ready for a final just yet
BLD-Final1/18/20071/18/20071/18/2007PCANC
DetailsMike Jordan
Scheduled by a contractor via Hello! on 1/18/2007 at 7:04:41 AM. Contact: ###-####.
BLD-Other12/28/200612/29/200612/29/2006APASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 12/28/2006 at 11:28:01 AM. Contact: ###-####.
BLD-Conference12/18/200612/19/200612/19/2006ADONE
DetailsMike Jordan
Scheduled by a contractor via Hello! on 12/18/2006 at 1:05:07 PM. Contact: ###-####.
BLD-Wall cover11/17/200611/17/200611/17/2006PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 11/17/2006 at 7:37:30 AM. Contact: ###-####.
interior walls ok to cover
BLD-Framing/Rough-in11/9/200611/13/200611/13/2006APASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 11/9/2006 at 3:15:00 PM. Contact: ###-####. shearwall nailing. ok to cover.
BLD-Conference11/6/200611/7/200611/7/2006ADONE
DetailsMike Jordan
Scheduled by a contractor via Hello! on 11/6/2006 at 1:46:50 PM. Contact: ###-####. Change in job super. Wanted to know what still needed to be inspected.
BLD-Framing/Rough-in10/16/200610/17/200610/17/2006APART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 10/16/2006 at 10:37:15 AM. Contact: ###-####. Exterior steel stud framing, box headers and dragstruts.
BLD-Foundation8/16/20068/16/20068/16/2006PPASS
DetailsJim Storey
steve ; Phone #: ###-#### Note: pouring concrete at 2:00 pm Internet Inspection Request from: Marsha Smylie
BLD-Footing8/11/20068/14/20068/14/2006APASS
DetailsJim Storey
steve; Phone #: ###-#### Internet Ins rebar ok si pending.pection Request from: Cathy Chiles
Inspection Record Card- Bld  8/7/2006 DONE
(F) Reprint permit  7/24/2006  
Issue PAID IN FULL permit  7/21/2006  
Print Occupancy Form  7/19/2006 DONE
Permit Ready to Issue  7/19/2006 DONE
Telephone call  7/19/2006 DONE
elizabeth ccoper at ###-#### is ready & need achd, gc & rce & esc res person
Routing - PLANNING7/18/2006 7/18/2006 PASS
Routing - PLAN CHECK7/18/2006 7/18/2006 PASS
PLANS/APPL TAKEN TO FRONT DESK  7/18/2006 DONE
Plan assigned to (JCM)6/5/2006 7/18/2006 PASS
7/18/2006 16:20:53 JCM - activity updated through activity BLDA022 from case BLD06-01601.
Routing - PLANNING7/12/2006 7/12/2006 FAIL
Approved by Design Review, but has not met conditions of Conditional Use
Routing - PLAN CHECK6/30/2006 7/12/2006  
Plan resubmittals received  7/10/2006 DONE
Received 1 letter to John M. & 3 copys of sheets A1.0,A2.0,A5.1 taken to John M.
Plan resubmittals received  7/7/2006  
A0.1, A2.0, A4.0, LD1.1, LD1.3, LD1.5,--elizabeth cooper came in & signed plans-took plans to john menard
Plan resubmittals received  7/7/2006 PASS
Architect came in and signed revised plan sheets previously submitted on 6/28/06. Routed to John M.
Plan Reviewer's activity  7/7/2006 PASS
Reviewed and approved resubmitted plan sheets. JCM
1st review completed  6/30/2006 FAIL
Failed Planning and Plan Check.
Routing - FIRE6/29/2006 6/30/2006 PASS
Attached review comments to plans.
Routing - PLANNING6/27/2006 6/29/2006 FAIL
Design Review: Approved per DRH05-00134.
Plan resubmittals received  6/28/2006 FAIL
Called Elizabeth and told her all plans need to be signed. Received project letter, two copies of 2004 master format insulated translucent fiberglass sandwich panel skylight system, two sets of sheets A0.1, A2.0, A4.0, LD1.1, LD1.3, LD1.5,
Routing Off Site - STRUCTURAL6/27/2006 6/27/2006 PASS
Reviewed and approved structural resubmittals. JCM
Plan resubmittals requested  6/27/2006 DONE
E-mailed the architect a copy of the plan review requesting revisions. JCM
Routing - PLAN CHECK6/23/2006 6/27/2006 FAIL
John M.
Routing - PLANNING6/21/2006 6/22/2006 FAIL
Greg J. drh05-00134

Carl M cup05-00027--did not complete DR, needs to amend Development Agreement to allow drive-up windows
Routing - PLUMBING6/9/2006 6/21/2006 PASS
per plans and 2003 upc
Plan resubmittals received  6/20/2006  
received transmittal sheet, "3" copies of treasure valley engineers (5 pages)"3" sets of S1.0, S2.0, S3.0, S4.0, S5.0, S5.1
Plan resubmittals requested  6/15/2006 DONE
Faxed the architect a copy of the comment list from the consulting structural engineer requesting revisions. JCM
Routing Off Site - STRUCTURAL6/6/2006 6/13/2006 FAIL
Called Action Couriers for pick up - Received faxed comment list from the consulting structural engineer requesting revisions. JCM
Routing - Erosion and Sediment6/8/2006 6/9/2006 PASS
ESC plan approved with attached conditions.
Routing - PUBLIC WORKS6/7/2006 6/8/2006 PASS
Routing - PLANNING Land Div6/6/2006 6/7/2006 PASS
parcel is a platted lot.
Plan routing begun/NEW & ADDTN  6/6/2006  
Plans ACCEPTED BY PLAN TECH  6/6/2006  
Application received  6/2/2006