BLD-Final | 12/19/2007 | 12/20/2007 | 12/20/2007 | A | PASS |
Dave Hannah
|
|
|
rick - please call for access Phone #: ###-####
|
DOC - Permit Finaled | 12/20/2007 | 12/20/2007 | 12/20/2007 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Grading Inspection | 12/17/2007 | 12/17/2007 | 12/17/2007 | P | DONE |
|
|
|
Final grading and drainage approved
|
BLD-Final | 12/14/2007 | 12/14/2007 | 12/14/2007 | P | NR |
Dave Hannah
|
|
|
rick Phone #: ###-#### needs hillside final
|
BLD-Energy code compliance | 7/12/2007 | 7/12/2007 | 7/12/2007 | P | PASS |
Dave Hannah
|
|
|
###-#### Rick
|
BLD-Framing/Rough-in | 7/9/2007 | 7/9/2007 | 7/9/2007 | P | PART |
Mike Jordan
|
|
|
Phone #: ###-####. Needs paperwork from engineer noting notched beam is ok at stairway for headroom. Needs to complete lateral bracing. Add studs under girder east side of main enterance. Rowblock floor joist at cantilever section. Will check remainder of fireblocking on e nergy insp.
|
BLD-Framing/Rough-in | 7/6/2007 | 7/6/2007 | 7/6/2007 | P | NR |
Jim Sly
|
|
|
rick Phone #: ###-#### NR........C/N posted
|
(F) Reprint permit | | | 6/8/2007 | | DONE |
|
|
|
|
BLD-Foundation | 4/23/2007 | 4/24/2007 | 4/24/2007 | A | PASS |
Dave Hannah
|
|
|
matt; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
|
BLD-Footing | 4/19/2007 | 4/20/2007 | 4/20/2007 | A | PASS |
Dave Hannah
|
|
|
matt; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Foundation | 4/18/2007 | 4/19/2007 | 4/19/2007 | A | PART |
Dave Hannah
|
|
|
matt ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith rebar in forms at 85 %
|
BLD-Footing | 4/11/2007 | 4/11/2007 | 4/13/2007 | P | PART |
Dave Hannah
|
|
|
Matt; Phone #: ###-#### Internet Inspection Request from: Stacie Backus needs mti aproval crew poured with out terrys ok rebar per plan but crew was told not to pour untill I got ok from terry
|
PubWorks Subgrade Approval | 4/12/2007 | 4/12/2007 | 4/12/2007 | | DONE |
|
|
|
Footing subgrade approved by the geotechnical engineer
|
BLD-Footing | 4/10/2007 | 4/11/2007 | 4/11/2007 | A | FAIL |
Dave Hannah
|
|
|
Matt; Phone #: ###-#### Internet Inspection Request from: Stacie Backus needs terrys sign off
|
Issue PAID IN FULL permit | | | 11/1/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/23/2006 | | DONE |
|
|
|
|
Telephone call | | | 8/23/2006 | | DONE |
|
|
|
spoke to cliff@###-####/told permit was ready, permit#, address, lot & block, and fees
|
Plan assigned to (SRZ) | 8/21/2006 | 8/21/2006 | 8/22/2006 | | PASS |
|
|
|
8/22/2006 14:25:55 SRZ - activity updated through activity BLDA022 from case BLD06-01615.
|
Case Summary (BLD) | | | 8/22/2006 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/22/2006 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/22/2006 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 8/16/2006 | | 8/22/2006 | | PASS |
|
|
|
|
Plan assigned to (SAM) | 6/5/2006 | 6/5/2006 | 8/21/2006 | | DONE |
|
|
|
|
Routing - FIRE | 8/11/2006 | | 8/15/2006 | | PASS |
|
|
|
No fire sprinklers required (Northridge Sub #5)
|
Routing - Erosion and Sediment | 8/10/2006 | | 8/11/2006 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PLANNING | 8/3/2006 | | 8/10/2006 | | PASS |
|
|
|
(PLANS LEFT ON DESK WHILE ON VACATION + SICK, DESPITE NOTES.) Passed. Driveway not to exceed 33' in front setback. AW
|
Routing - PUBLIC WORKS | 8/3/2006 | | 8/3/2006 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS GRADING | 8/3/2006 | | 8/3/2006 | | PASS |
|
|
|
Approved as Category 1
|
Routing - PUBLIC WORKS GRADING | 6/8/2006 | | 6/12/2006 | | FAIL |
|
|
|
Design for block retaining wall not submitted. Spoke with Rick Williams 6/12/06. Terry called customer they need site plan on one set must be replaced with correct grading plan.
|
Application received | | | 6/5/2006 | | |
|
|
|
|
Routing - PLAN CHECK | | | | | |
|
|
|
Routing to Steve for preliminary review
|