Information based on query as of Sunday, August 18, 2024.
Permit Information
Permit NumberBLD06-01625
StatusFinaled
Name CARGO EXPRESS INC
Site Address 1356 E BEECHCRAFT CT
Project NameCargo Express
Customer Number 
ePlanReviewNo
Description
(RCE 3880 Construction West Inc.) (CARGO EXPRESS INC) To constuct a 7,305 sq. ft. one story Type VB office building with automotive repair shop. Office area 4,105, shop area 3,200. Other work includes all site improvements, paving and landscaping per approved plans and attachments, DRH06-00061. This building has been designed for non-separated uses. (mlo)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
CHANGE STATUS TO (FNL)  2/10/2010 DONE
(F) Reprint permit  11/30/2009 DONE
DetailsRita DeYoung
reprint permit
CHANGE STATUS TO (COL)  1/18/2008 DONE
Third Notice BLD2/12/20072/12/20072/16/2007 DONE
Second Notice has not been responded to.
Second Notice BLD2/2/20072/2/20072/12/2007 DONE
First Notice has not been responded to.
First Notice 12/29/20062/2/2007 DONE
Permanent occupancy  12/29/2006 DONE
Perm. Occ. Cert. # 11378 issued 12-29-06 to Cargo Express, Inc.
BLD-Final12/28/200612/28/200612/28/2006PPASS
DetailsJim Storey
BLD-Final12/26/200612/28/200612/28/2006PPART
DetailsJim Storey
Rob; Phone #: ###-#### Internet Inspection Request from: Sherri Bennett
PubWorks Occupancy Approval12/28/200612/28/200612/28/2006 DONE
Signed permanent occupancy 12/28/06 by J. Johnson.
FIRE-Final Inspection12/26/200612/27/200612/27/2006PPASS
DetailsForrest France
Life safety inspection passed, noted door hardware at the teller gate at the front entry lobby is installed backward and will need to be repaired prior to structural final.
FIRE-Conference12/19/200612/20/200612/20/2006ADONE
DetailsForrest France
Confrence to discuss building addressing.
BLD-Framing/Rough-in12/14/200612/14/200612/14/2006PFAIL
DetailsJim Storey
Rob; Phone #: ###-#### Internet Inspection Request from: Sherri Bennett wrong edge molding
BLD-Framing/Rough-in12/11/200612/11/200612/11/2006PPART
DetailsMike Jordan
rob; Phone #: ###-#### Internet Inspection Request from: Barbara Sti. ri insp not done above grid. Needs to repair several wires that are exceeding the 1:8 as noted on approved plans. Will repir wires and reinspect.
BLD-Energy code compliance11/20/200611/21/200611/21/2006PPASS
DetailsJim Storey
rob; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Energy code compliance11/9/200611/13/200611/13/2006APASS
DetailsJim Storey
Phone #: ###-#### Internet Inspection Request from: Cathy Chiles stil pending truss repair to verify at ceilling insp.
BLD-Framing/Rough-in11/7/200611/8/200611/8/2006PPART
DetailsJim Storey
Rob; Phone #: ###-#### Internet Inspection Request from: Barbara Stitt truss repair ok to insulate.
BLD-Framing/Rough-in11/1/200611/2/200611/2/2006APART
DetailsJim Storey
shear nailing; Phone #: ###-#### Internet Inspection Request from: Barbara Stitt exterior nailling ok
BLD-Framing/Rough-in11/1/200611/1/200611/1/2006PDEFR
DetailsJim Storey
shear nailing; Phone #: ###-#### Internet Inspection Request from: Barbara Stitt out of time.
BLD-Energy code compliance9/25/20069/26/20069/26/2006APASS
DetailsJim Storey
rob; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles vapor barrior ok under slab.
BLD-Footing8/31/20069/1/20069/1/2006APART
DetailsJim Storey
Rob, early a.m., please; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt wip pending si
(F) Reprint permit  7/26/2006  
Issue PAID IN FULL permit  7/25/2006 DONE
Print Occupancy Form  7/21/2006 DONE
Permit Ready to Issue  7/21/2006 DONE
Telephone call  7/21/2006 DONE
left mess for at ###-#### that p
Telephone call  7/21/2006 DONE
left mess at ###-#### that permit is ready
Routing - PLAN CHECK7/6/2006 7/20/2006 PASS
PLANS/APPL TAKEN TO FRONT DESK  7/20/2006 DONE
Plan assigned to (MLO)6/6/2006 7/20/2006 PASS
7/20/2006 15:54:35 MYS - activity updated through activity BLDA022 from case BLD06-01625.
Routing Off Site - STRUCTURAL7/17/2006 7/18/2006 PASS
Sent 1 response letter with calcs and 1 copy of plan sheets S1.1 and S5.1 to outside engineer for review.
Plan resubmittals received  7/14/2006  
Received 1 cover transmittal, 1 page plan review response letter from Roger Foster, 2 sets of calcs from Stapley Engineering, 2 copies of CS1.0, A1.0, A5.0, A6.0, A6.1, EN1.0, 3 copies of S1.1, S5.1 and taken to Mike Otto's desk
Plan resubmittals received  7/12/2006 DONE
Received via fax 1 cover sheet,1 envelope compliance cert 8 1/2 x 11 taken to Mike Otto
1st review completed  7/6/2006 FAIL
Failed Plan Check.
Routing - FIRE7/3/2006 7/6/2006 PASS
Attached review comments to plans.
Routing Off Site - STRUCTURAL6/20/2006 7/3/2006 FAIL
Called Action Couriers for pick up corrections sent to architect MLO
Routing - PLAN CHECK6/28/2006 7/3/2006 FAIL
corrections sent to architect
Plan resubmittals requested  7/3/2006 DONE
IBC corrections
Routing - Erosion and Sediment6/27/2006 6/27/2006 PASS
ESC plan approved with attached conditions.
Routing - PLAN CHECK6/26/2006 6/27/2006 PEND
Mike O.
Routing - PLANNING6/22/2006 6/26/2006 PASS
Cody R. drh06-00061
Routing - PLUMBING6/19/2006 6/22/2006 PASS
R.P. will be required at wash bay hosebib.
Routing - Erosion and Sediment6/15/2006 6/19/2006 FAIL
ESC plan failed. No ESC narrative included in submittal. Notified applicant.
Plan resubmittals received  6/19/2006  
Received 1 copy of cover transmittal letter, 2 copies of structural calcs for metal building system, 4 copies of the following sheets- S-1, S-2, S-3, S-4, S-5, S-6, S-7 and taken to Mike Otto
Routing - PUBLIC WORKS6/8/2006 6/15/2006 PASS
Routing Off Site - STRUCTURAL6/6/2006 6/9/2006 FAIL
incomplete plans and calculations provided for metal building cannot complete review.
Telephone call  6/9/2006 DONE
called stapley engineers talked to G. Leshman about missing plans. MLO
Routing - PLANNING Land Div6/6/2006 6/8/2006 PASS
Plans ACCEPTED BY PLAN TECH  6/6/2006  
Plan routing begun/NEW & ADDTN  6/6/2006  
Application received  6/6/2006