Case Summary (BLD) | | | 3/21/2013 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 12/7/2007 | | DONE |
|
|
|
|
Second Notice BLD | 2/7/2007 | 2/7/2007 | 2/22/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 1/24/2007 | 2/7/2007 | | DONE |
|
|
|
|
Permanent occupancy | | | 1/24/2007 | | DONE |
|
|
|
Perm. Occ. Cert. # 11405 issued 1-24-07 to Accurate Laser.
|
Code Occupancy Approval | | | 1/19/2007 | | PASS |
|
|
|
WILL SIGN PERM OCCUPANCY GRASS IN NOW.
|
Permanent Occupancy | | 1/12/2007 | 1/12/2007 | | DONE |
|
|
|
|
Temporary occupancy | | | 12/29/2006 | | DONE |
|
|
|
Temp. Occ. Cert. # 5503 issued 12-29-06 to Accurate Laser.
|
BLD-Final | 12/21/2006 | 12/22/2006 | 12/22/2006 | A | PART |
Jim Sly
|
|
|
keith; Phone #: ###-#### Internet Inspection Request from: Sherri Bennett OK for Temp Occ. OK for Perm Occ when Zoning/Code enforce signs off Perm.
|
BLD-Final | 12/20/2006 | 12/21/2006 | 12/21/2006 | P | CANC |
Mike Jordan
|
|
|
keith ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. Canc. by contractor. Waiting for code enforcement.
|
Code Occupancy Approval Temp | | | 12/21/2006 | | DONE |
|
|
|
I SIGNED TEMP ONLY DUE TO SOME SOD NEEDS PLACED, WILL RECHECK NEXT WEEK, AND IF NOT IN WILL REQUIRE BOND.
|
FIRE-Final Inspection | 12/13/2006 | 12/14/2006 | 12/14/2006 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
BLD-Energy code compliance | 10/24/2006 | 10/24/2006 | 10/24/2006 | P | CANC |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 10/24/2006 at 8:54:26 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 10/24/2006 | 10/24/2006 | 10/24/2006 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 10/24/2006 at 8:54:26 AM. Contact: ###-####. Inspected 5/8ype X at soffitt and can lights.
|
FIRE-Final Inspection | 10/23/2006 | 10/23/2006 | 10/23/2006 | P | NR |
Forrest France
|
|
|
Project is not ready for life safety final inspection.
|
BLD-Energy code compliance | 10/16/2006 | 10/17/2006 | 10/17/2006 | A | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 10/16/2006 at 2:47:54 PM. Contact: ###-####. All framing issues have been resolved.
|
BLD-Framing/Rough-in | 10/9/2006 | 10/10/2006 | 10/10/2006 | A | PART |
Mike Jordan
|
|
|
Framers to check nailing on east wall. Needs to firecaulk elec. penetrations at soffitt at camnlights. Also needs to replace some 5/8 type x at soffitt that was damaged. Provide truss fix. ok to insul.
|
BLD-Framing/Rough-in | 10/6/2006 | 10/9/2006 | 10/9/2006 | P | NR |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 10/6/2006 at 3:05:10 PM. Contact: ###-####. Elec ri insap. failed.
|
BLD-Framing/Rough-in | 9/26/2006 | 9/26/2006 | 9/26/2006 | P | PART |
Mike Jordan
|
|
|
keith; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Roof shearnailing only. Still needs to doublerock soffit and box out can lights.
|
BLD-Other | 8/22/2006 | 8/23/2006 | 8/23/2006 | A | PART |
Mike Jordan
|
|
|
steve Note: stem wall; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Footing | 8/22/2006 | 8/22/2006 | 8/22/2006 | P | PART |
Mike Jordan
|
|
|
steve; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Perimeter footing.
|
(F) Reprint permit | | | 7/24/2006 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 7/21/2006 | | |
|
|
|
|
Plan assigned to (JCM) | 6/7/2006 | 6/7/2006 | 7/20/2006 | | PASS |
|
|
|
7/20/2006 15:26:37 JCM - activity updated through activity BLDA022 from case BLD06-01634.
|
Routing - PUBLIC WORKS | 7/18/2006 | | 7/20/2006 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 7/20/2006 | | 7/20/2006 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/20/2006 | | DONE |
|
|
|
|
Print Occupancy Form | | | 7/20/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/20/2006 | | DONE |
|
|
|
|
Telephone call | | | 7/20/2006 | | DONE |
|
|
|
called ###-#### and left message for Wes Steele w/Heather that permit is ready, fees and need ACHD
|
Routing - PLAN CHECK | 7/3/2006 | | 7/18/2006 | | |
|
|
|
|
Plan resubmittals received | | | 7/14/2006 | | |
|
|
|
Received transmittal sheet, 2 copies of 3pg. additional calculations, 2 copies of the following pages: 1, 2, 3, 4, 10; taken to John Menard
|
1st review completed | | | 7/3/2006 | | FAIL |
|
|
|
Failed Plan Check.
|
Routing - FIRE | 6/29/2006 | | 7/3/2006 | | PASS |
|
|
|
Attached review comments to plans.
|
Plan resubmittals requested | | | 6/29/2006 | | DONE |
|
|
|
E-mailed the architect and applicant a copy of the plan review comment list (structural and nonstructural).
|
Routing - PLAN CHECK | 6/23/2006 | | 6/29/2006 | | FAIL |
|
|
|
John M
|
Routing - PLANNING | 6/22/2006 | | 6/23/2006 | | PASS |
|
|
|
Approved per DRH05-00461- Sarah S
|
Routing - PLUMBING | 6/15/2006 | | 6/22/2006 | | PASS |
|
|
|
per plans and 2003 upc
|
Routing - Erosion and Sediment | 6/14/2006 | | 6/15/2006 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PUBLIC WORKS | 6/8/2006 | | 6/14/2006 | | FAIL |
|
|
|
Revisions required. Contact Brian Murphy ###-####
|
Routing - PLANNING Land Div | 6/7/2006 | | 6/8/2006 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/7/2006 | | |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 6/7/2006 | | |
|
|
|
|
Application received | | | 6/7/2006 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/7/2006 | | DONE |
|
|
|
|