BLD-Final | 8/26/2009 | 8/26/2009 | 8/26/2009 | P | FAIL |
Jim Sly
|
|
|
Permit Expired
|
DOC - Permit Expired | 8/26/2009 | 8/26/2009 | 8/26/2009 | P | PASS |
Jim Sly
|
|
|
No insp for approx 1yr......Expired.
|
BLD-Conference | 9/8/2008 | 9/9/2008 | 9/9/2008 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 9/8/2008 at 3:21:23 PM. Contact: ###-####. ok to build deck and instal door east side 2nd floor add to oridg. permit.
|
BLD-Conference | 8/15/2008 | 8/15/2008 | 8/15/2008 | P | DONE |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 8/15/2008 at 8:15:07 AM. Contact: ###-####. WIP
|
BLD-Conference | 4/15/2008 | 4/16/2008 | 4/16/2008 | A | DONE |
Jim Sly
|
|
|
Steve; Phone #: ###-#### Internet Inspection Request from: Cathy WIP
|
BLD-Framing/Rough-in | 1/2/2008 | 1/2/2008 | 1/2/2008 | P | PASS |
Mike Jordan
|
|
|
steve - partial Phone #: ###-####
|
BLD-Energy code compliance | 1/2/2008 | 1/2/2008 | 1/2/2008 | P | PASS |
Mike Jordan
|
|
|
steve - partial Phone #: ###-####
|
BLD-Conference | 10/11/2007 | 10/11/2007 | 10/11/2007 | P | PART |
Jim Sly
|
|
|
steve Phone #: ###-#### Walk thru framing ....appears OK so far.
|
BLD-Framing/Rough-in | 10/1/2007 | 10/5/2007 | 10/5/2007 | A | CANC |
Jim Sly
|
|
|
steve Phone #: ###-#### will reschedule later on
|
BLD-Conference | 9/24/2007 | 9/24/2007 | 9/24/2007 | P | PASS |
Jim Sly
|
|
|
steve Phone #: ###-#### OK for Extension.................
|
BLD-Footing | 4/30/2007 | 5/2/2007 | 5/2/2007 | P | PASS |
Jim Sly
|
|
|
Steve = ); Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt Foot and found Pass
|
BLD - Request for Extension | 4/9/2007 | 4/9/2007 | 4/9/2007 | | PASS |
Jim Sly
|
|
|
steve ###-#### OK for Ext.
|
BLD-Foundation | 11/22/2006 | 11/22/2006 | 11/22/2006 | P | PASS |
Jim Sly
|
|
|
steve; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Footing | 9/25/2006 | 9/25/2006 | 9/25/2006 | P | PASS |
Jim Storey
|
|
|
steve; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|
Issue PAID IN FULL permit | | | 8/14/2006 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 8/8/2006 | 8/8/2006 | 8/9/2006 | P | DONE |
|
|
|
8/9/2006 07:28:40 PEP - activity updated through activity BLDA022 from case BLD06-01648.
|
Case Summary (BLD) | | | 8/9/2006 | | |
|
|
|
|
Inspection Record Card- Bld | | | 8/9/2006 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/9/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/9/2006 | | DONE |
|
|
|
|
Telephone call | | | 8/9/2006 | | DONE |
|
|
|
spoke to steve@###-####/told permit was ready, permit#, address, and fees.
|
Routing Walk-In (BLD) | 6/7/2006 | 6/7/2006 | 8/8/2006 | P | DONE |
|
|
|
8/8/2006 13:37:38 B_S - activity updated through activity BLDI252 from case BLD06-01648.
|
Routing Walk-In (Zoning) | 6/7/2006 | 6/7/2006 | 6/7/2006 | P | DONE |
|
|
|
6/7/2006 13:41:43 SAH - activity updated through activity BLDI252 from case BLD06-01648.
|
Application received | | | 6/7/2006 | | |
|
|
|
|
CHANGE STATUS TO (PND) | | | 6/7/2006 | | DONE |
|
|
|
engineering required for lateral and not typical light frame construction.
Energy calcs required.
|