Permit NumberBLD06-01651
StatusFinaled
Name SOMERSET HILLS CONDOMINIUMS BLDG 6
Site Address 390 W CRESTLINE DR
Project NameSOMERSET HILLS-BLDG 6
Customer Number 
ePlanReviewNo
Description
(SOMERSET HILLS-BLDG 6) To remodel an existing two story, with a basement, 12 unit apartment building. Work to include adding dwelling unit separation walls, to the roof deck. Improving the existing stairs to meet exit enclosures, replacing electrical, plumbing, mechanical equipment, insulation and drywall. All construction shall be per the approved plans and attached comment list. PLAN MODIFICATION * To add the following spaces to existing basement: (3) non-habitable dwelling unit basement spaces, mechanical space and bicycle lock-up space. Each dwelling unit basement space will be supplied w/(1) window & an egress window well. The concrete walk on the west end of the building will be extended to the bicycle lock-up space. MJP
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  8/21/2012 DONE
BLD-Aging Inspection4/20/20104/20/20104/21/2010 DONE
DetailsTony Young
DOC - Permit Finaled4/21/20104/21/20104/21/2010PPASS
DetailsTony Young
BLD-Final7/23/20077/23/20077/23/2007PPASS
DetailsTony Young
mike; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang
BLD-Final7/17/20077/18/20077/19/2007PNR
DetailsTony Young
mike; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang
FIRE-Final Inspection7/17/20077/18/20077/18/2007APASS
DetailsTroy Cobbley
LIfe safety passed
BLD-Final6/28/20076/28/20076/28/2007PPASS
DetailsTony Young
mike Phone #: ###-####
see fire inspection notes,, same
FIRE-Final Inspection6/26/20076/26/20076/26/2007PPART
DetailsForrest France
Inspection for units 208, 209, 210, 211 on the west end of the building completed satisfactory, plastic cover and battery lid replaced on two SD while on site, noted the basement level storage areas will require smoke detectors and at least one fire extinguisher- see plan review notes and annotations, the remaining 8 units in this building are not yet completed for final.
BLD-Framing/Rough-in4/26/20074/27/20074/27/2007APASS
DetailsTony Young
mike ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
basement ok
BLD-Other4/25/20074/25/20074/25/2007PPART
DetailsTony Young
mike caulk and seal; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
basement ok to insulate,, will need fire dampers in ducts
BLD-Energy code compliance4/19/20074/19/20074/19/2007PPASS
DetailsTony Young
Mike; Phone #: ###-#### Internet Inspection Request from: Stacie Backus
CHANGE STATUS TO (ISS)  4/16/2007 DONE
(F) Reprint permit  4/16/2007 DONE
BLD-Framing/Rough-in4/12/20074/13/20074/13/2007PPASS
DetailsTony Young
Mike ###-#### for 212? -215
Plan assigned to (M_P)12/12/200612/12/20064/12/2007 PASS
4/12/2007 09:22:03 M_P - activity updated through activity BLDA022 from case BLD06-01651.
Routing - PLAN CHECK3/7/2007 4/12/2007 PASS
PLAN MODIFICATION *
Override - Parcel Holds  4/12/2007  
Permit Ready to Issue  4/12/2007 DONE
Telephone call  4/12/2007 DONE
called ###-#### and told Ryan McCaene that permit is ready and fees due
PLANS/APPL TAKEN TO FRONT DESK  4/12/2007 DONE
Override - Parcel Holds  4/12/2007  
Print Pending Permit.LaserJet4  4/12/2007 DONE
Case Summary (BLD)  4/12/2007 DONE
Override - Parcel Holds  4/12/2007  
Inspection Record Card- Bld  4/12/2007 DONE
Override - Parcel Holds  4/12/2007  
Routing - PLANNING Land Div4/11/2007 4/11/2007 PASS
Revised condominium drawings submitted that match the architectural drawings.
BLD-Energy code compliance3/27/20073/28/20073/28/2007APART
DetailsTony Young
This inspection is not for the plan mod part - Mike ###-####
quad 212-215 ok to cover
Override - Parcel Holds  3/27/2007  
BLD-Framing/Rough-in3/23/20073/23/20073/23/2007PPART
DetailsTony Young
###-#### mikeok pending mech rough to insulate,, 212-215
Override - Parcel Holds  3/23/2007  
BLD-Energy code compliance3/12/20073/13/20073/13/2007APASS
DetailsMike Jordan
inspection for basement ###-#### Mike
Override - Parcel Holds  3/12/2007  
BLD-Framing/Rough-in3/8/20073/8/20073/8/2007PPART
DetailsTony Young
###-#### - mike
208-211 ok to insulate
Override - Parcel Holds  3/8/2007  
not modification
Routing - PLAN CHECK3/2/2007 3/7/2007 PEND
PLAN MODIFICATION Waiting for others to approve prior to issuing permit.
Routing - FIRE2/26/2007 3/2/2007 PASS
PLAN MODIFICATION - Attached updated review comments to plans.
Plan resubmittals received  2/28/2007  
Received cover transmittal letter and 3 copies of sheets a0.11, a2.12, a2.13, a2.14 and taken to Mike Phillips
Routing - PLAN CHECK1/16/2007 2/26/2007 FAIL
PLAN MODIFICATION * Plan review complete, called architect and requested additional information to be submitted to reflect extension onb hand rails and rise and run to meet code.
Case Summary (BLD)  2/26/2007  
Routing - PLANNING Land Div1/8/2007 1/16/2007 FAIL
Prior to issuance of building permit, revised condominium drawings are required that match the architectural drawings. Called Tim Fox on January 16, 2007 and he has not completed these drawings for Building #6.
Routing - PLAN CHECK12/22/2006 1/8/2007  
PLAN MODIFICATION Routing to Land Division.
Plan resubmittals received  1/2/2007  
Received 1pg. response letter and 3 copies of the following pages: a2.11, a2.12, a4.10, a4.11, a7.12; taken to Mike Phillips
Routing - PLANNING12/21/2006 12/22/2006 PASS
CUP03-00114-Cody R-With the exception of the sidewalk to the existing parking lot; planning approval is for interior work only; no increase in residential units approved or allowed.
Routing - PUBLIC WORKS12/21/2006 12/21/2006 PASS
PLAN MODIFICATION
Routing - PLANNING Land Div12/19/2006 12/20/2006 FAIL
Prior to issuance of building permit, revised condominium drawings are required that match architectural drawings.
Plan Modification Accepted  12/12/2006  
Plan modification accepted for Bld06-01651 (bldg. 6) to add the following spaces to existing basement: (3) non-habitable dwelling unit basement spaces, mechanical space and bicycle lock-up space. Each dwelling unit basement space will be supplied w/(1) window & an egress window well. The concrete walk on the west end of the building will be extended to the bicycle lock-up space. Three sets of plans submitted on sheets a0.11, a0.21, a2.11, a2.12, a2.13, a2.14, a4.10, a4.11, a7.11, a7.12, and structural design calculations; routed to Mike Phillips
BLD-Aging Inspection11/9/200611/9/200611/9/2006 PASS
DetailsTony Young
Override - Parcel Holds  8/10/2006  
Issue PAID IN FULL permit  8/10/2006 DONE
Override - Parcel Holds  7/28/2006  
Inspection Record Card- Bld  7/28/2006 DONE
Telephone call  7/28/2006 DONE
tlk to ryan mccaene ###-#### that permit and fees are ready to be picked up but needs GC and RCE #
Override - Parcel Holds  7/28/2006  
Permit Ready to Issue  7/28/2006 DONE
Plan assigned to (M_P)6/9/2006 7/27/2006 PASS
7/27/2006 14:37:11 M_P - activity updated through activity BLDA022 from case BLD06-01651.
Routing - FIRE7/25/2006 7/27/2006 PASS
Attached review comments to plans.
1st review completed  7/27/2006 PASS
Routing - PLAN CHECK7/27/2006 7/27/2006 PASS
PLANS/APPL TAKEN TO FRONT DESK  7/27/2006 DONE
Override - Parcel Holds  7/27/2006  
Print Pending Permit.LaserJet4  7/27/2006 DONE
Routing - PLAN CHECK6/13/2006 7/25/2006 PEND
Waiting for others to approve prior to issuing permit.
Routing - PUBLIC WORKS6/9/2006 6/13/2006 PASS
Application received  6/7/2006  
Recd Pcfee & Taken To Pln CK  6/7/2006 DONE
Plans ACCEPTED BY PLAN TECH  6/7/2006  
First Notice4/21/20104/21/2010   
DetailsTony Young