Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD06-01654
StatusFinaled
Name MALLARD HOMES
Site Address 2833 S VICTORY VIEW WAY
Project NameSimply Cats
Customer Number 
ePlanReviewNo
Description
RCE 1688 Mallard Homes (SIMPLY CATS) To construct a new 8,907 sq. ft. one story type VB animal shelter. Other work includes all site improvements, paving and landscaping per approved plans and attachments, DRH05-00189. (mlo)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD6/21/20076/21/20077/24/2007 DONE
Second Notice has not been responded to.
Second Notice BLD5/25/20075/25/20076/21/2007 DONE
First Notice has not been responded to.
First Notice 5/2/20075/25/2007 DONE
BLD-Final5/2/20075/2/20075/2/2007PPASS
DetailsMike Jordan
ron ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. ok for perm occ.
FIRE-Final Inspection5/1/20075/2/20075/2/2007APASS
DetailsTroy Cobbley
LIfe safety passed.
Permanent Occupancy 5/2/20075/2/2007 DONE
Details
Plan Modification Accepted  5/2/2007 DONE
Plan modification recieved from general contractor. Submitted to public records for scanning. Relocation of fire hydrant.
Permanent occupancy  5/2/2007 DONE
Perm. Occ. Cert. # 11569 issued 5-2-07 to Simply Cats.
PubWorks Occupancy Approval4/30/20074/30/20074/30/2007 DONE
Signed final occupancy R. Rokovitz.
BLD-Final4/26/20074/27/20074/27/2007ANR
DetailsMike Jordan
ron ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. Life/safety failed.
Code Occupancy Approval4/25/20074/26/20074/26/2007APASS
DetailsScott M.Brown
ron; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
ALL IN OK FOR FINAL
FIRE-Final Inspection4/25/20074/26/20074/26/2007AFAIL
DetailsTroy Cobbley
Provide correct sticker at the main exit, either remove the duct smoke detectors since they are not required or install correctly and provide with remote annunciators, provide asbuilt drawings for the relocation of the fire hydrant to city of boise, provide exit discharge lighting and provide correct door hardware on the north office door (remove the manual flush bolt)
BLD-Other3/16/20073/16/20073/16/2007PPASS
DetailsMike Jordan
Ron suspended ceiling; Phone #: ###-#### Internet Inspection Request from: Stacie Backus. Pending elec. and mech. ri above grid.
BLD-Concrete2/16/20072/16/20072/16/2007PCANC
DetailsMike Jordan
ron - trash enclosure; Phone #: ###-#### Internet Inspection Request from: Victoria Beall. No insp. required.
BLD-Energy code compliance1/25/20071/26/20071/26/2007APASS
DetailsJim Storey
ron; Phone #: ###-#### Internet Inspection Request from: Darla Downs pending plm aproval.
BLD-Framing/Rough-in1/17/20071/19/20071/19/2007APASS
DetailsMike Jordan
RON; Phone #: ###-#### Internet Inspection Request from: Victoria Beall. ok to insul. pend. plumbing. Needs to seal penetrations thru draftstops.
BLD-Footing12/5/200612/5/200612/5/2006PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 12/5/2006 at 11:07:38 AM. Contact: ###-####. Footing for dumpster enclosure.
BLD-Other11/17/200611/17/200611/17/2006PPART
DetailsMike Jordan
ron Note: shear wall; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Noted installation of misssing straps at window openings at shear walls.
BLD-Other11/9/200611/13/200611/13/2006APART
DetailsMike Jordan
david - shear; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. Shear wall and roof diaphragm insp. Needs rfi from eng. deleting lsta34 straps at openings in shearwalls.
BLD-Framing/Rough-in11/9/200611/9/200611/9/2006PPART
DetailsMike Jordan
ron Note: partial straps; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Verified all holdowns, straps at hip sections and at cantilevered beams and at jack trusses.
BLD-Footing9/14/20069/14/20069/14/2006PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 9/14/2006 at 8:38:58 AM. Contact: ###-####.
BLD-Foundation8/29/20068/30/20068/30/2006APART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 8/29/2006 at 8:51:42 AM. Contact: ###-####.
BLD-Footing8/25/20068/28/20068/28/2006PPART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 8/25/2006 at 1:39:31 PM. Contact: ###-####. P"erimeter footings.
(F) Reprint permit  8/22/2006  
Print Occupancy Form  8/15/2006 DONE
Print Occupancy Form  8/15/2006 DONE
Telephone call  8/15/2006 DONE
tlk to ron ###-#### that permit and fees are ready to be picked up
Permit Ready to Issue  8/15/2006  
Issue PAID IN FULL permit  8/15/2006 DONE
Plan assigned to (MLO)6/8/20066/8/20068/14/2006 PASS
8/14/2006 11:38:03 MYS - activity updated through activity BLDA022 from case BLD06-01654.
Routing - PLANNING8/14/2006 8/14/2006 PASS
Routing - PLAN CHECK8/14/2006 8/14/2006 PASS
PLANS/APPL TAKEN TO FRONT DESK  8/14/2006 DONE
Routing - PLAN CHECK8/11/2006 8/14/2006 PEND
Rerouted back to Andrea with resubmittals attached.
Plan resubmittals received  8/11/2006  
Received 1 cover transmittal, 3 copies of LS-1 and taken to Marlene's desk
Routing - PLANNING8/10/2006 8/11/2006 FAIL
Landscape plan does not reflect the building footprint that was approved as a part of DHR05-00189 MOD. The applicant should submit a revised landscape plan to be inserted into the building plans.
Routing - PLAN CHECK7/28/2006 8/10/2006 PEND
On hold waiting for resubmittals. See Planning comments by Cody Riddle.
8/10/06 - Routed back to Planning (Andrea Tuning).
Routing - FIRE7/20/2006 7/28/2006 PASS
Attached review comment to plans.
Plan resubmittals received  7/20/2006  
Received 1 cover transmittal, 1 copy of united water flow sheet, 3 copies of C2.1, 3 copies of A-1 and taken to Mike Otto's desk
Plan resubmittals received  7/20/2006  
Received 1 copy of cover transmittal and 1 copy of ACHD impact fee certificate A06-005601
Routing - PLAN CHECK7/10/2006 7/20/2006 PEND
7/20/06 - sent plans to Fire for rereview
Routing Off Site - STRUCTURAL7/13/2006 7/18/2006 PASS
Sent resubmittals to outside engineer for review. msouthard
Plan resubmittals received  7/11/2006  
Received 1 cover transmittal, 1 copy of Stapley plan reveiw comments, 2 copies of additional structural calcs, and 3 copies of the following sheets--S1.1, S2.1, S5.1, S7.1 and taken to Mike Otto
Routing - FIRE7/6/2006 7/10/2006 FAIL
Faxed resubmittal items to architect. Inserted review comments into plans.
1st review completed  7/10/2006 FAIL
Failed Planning and Fire.
Routing - PLAN CHECK7/5/2006 7/6/2006 PASS
Routing - PLANNING7/3/2003 7/5/2006 FAIL
Building footprint has been expanded at the northwest corner since DR approval. A staff level modification will be required prior to issuance of a building permit. Faxed architect this morning.
Routing - PLUMBING6/22/2006 7/3/2006 PASS
per paln,note and 2203 UPC
Plan resubmittals received  6/30/2006  
Recieved transmittal sheet, 3 copies of the following: C1.1, C2.1, C3.1, C3.2, C3.3, C4.1; taken to Mike Otto. Plans are for Brian Murphy MLO.
Routing Off Site - STRUCTURAL6/8/2006 6/23/2006 FAIL
Called Action Couriers for pick up . Corrections sent to architect.
Plan resubmittals requested  6/23/2006 DONE
structural review comments.
Routing - Erosion and Sediment6/21/2006 6/22/2006 PASS
ESC plan approved with attached conditions.
Routing - PUBLIC WORKS6/15/2006 6/21/2006 PASS
Routing - PLANNING Land Div6/8/2006 6/15/2006 PASS
Plans ACCEPTED BY PLAN CHECK  6/8/2006  
Plan routing begun/NEW & ADDTN  6/8/2006  
Application received  6/7/2006