Permit Information
Permit NumberBLD06-01663
StatusFinaled
Name VISSER BUILDING CO
Site Address 970 W RIVER ST
Project NameIDAHO RECORDS MGMNT
Customer Number 
ePlanReviewNo
Description
Building D Idaho Records Management - To construct a new 12,745 square foot, one story addition to the east side of existing 33,000 square foot, two story storage and office building A/B. The new addition is identified as Building D. The required accessible restrooms are in building A/B. The new building addition is constructed of a pre-engineered metal building on a concrete slab floors and foundation. The office space and restrooms shown on the floor plan are future and are not approved as part of this permit. A separate permit will be required to finish those spaces. All construction per the approved plans. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice BLD10/1/200710/1/200710/30/2007 DONE
First Notice has not been responded to.
First Notice 9/7/200710/1/2007 DONE
BLD-Final9/6/20079/7/20079/7/2007PPASS
DetailsDave Hannah
bob Phone #: ###-#### ok for perm occ
FIRE-Final Inspection9/6/20079/7/20079/7/2007APASS
DetailsForrest France
Noted items required for compliance have been completed, fire life safety finaled.
Agreement of Future work7/12/20077/20/20079/7/2007 DONE
TOC approved based on FP accestance test being conducted on 7/25. Check with spk vendor to verify test is on track.
Permanent Occupancy  9/7/2007 DONE
Plan resubmittals received  7/16/2007 DONE
Received cover letter addressed to John Menard, racking engineering, two copies of pages 06-6500-L03, 06-6500-EL01, 06-6500-EL02, 06-6500-EL03, 06-6500-EL04, TD12601-01; Per John Menard give to inspector who requested information. Per Architect Byron Smith inspector requested info is Dave Hannah, put in Dave's box and e-mailed him that it was in there.
BLD-Final7/11/20077/12/20077/12/2007PPART
DetailsDave Hannah
bob Phone #: ###-#### ok for temp occ needs others to sign off perm and dbl door hardware gaurdes on racking
FIRE-Final Inspection7/11/20077/12/20077/12/2007APART
DetailsForrest France
Temp occupancy approved with S. Rogers permission pending satisfactory pump acceptance testing for the project related fire sprinkler permit to be completed 7/25, also need to add one exit sign at the NE door as indicated on approved plans.
Telephone call  7/12/2007 DONE
telcon from F. France regarding status of fire related permits; all items now okay except FP acceptance test. I okayed for TOC with stipulation of fire pump acceptance test per NFPA 20 being conducted with pump mfg's rep and our fire inspector present on 7/25/07.
Code Occupancy Approval7/5/20077/5/20077/5/2007PPASS
DetailsJoe R Venneman
Code Occupancy Approval7/2/20077/2/20077/2/2007PPASS
DetailsJoe R Venneman
BLD-Framing/Rough-in6/28/20076/29/20076/29/2007APASS
DetailsTom Arcoraci
bob Phone #: ###-####
BLD-Footing1/23/20071/24/20071/24/2007APART
DetailsDave Hannah
bob ; Phone #: ###-#### Internet Inspection Request from: Darla Downs ok pending spec inspection
BLD-Foundation1/16/20071/16/20071/16/2007PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 1/16/2007 at 7:51:31 AM. Contact: ###-####.ok pending spec inspection
BLD-Footing1/10/20071/10/20071/10/2007PPART
DetailsDave Hannah
bob; Phone #: ###-#### Internet Inspection Request from: Victoria Beall column ftgs ok to pour
BLD-Footing1/4/20071/4/20071/5/2007PPART
DetailsDave Hannah
bob; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles this is the block by the manhole
Issue PAID IN FULL permit  1/2/2007 DONE
Print Occupancy Form  12/14/2006  
Print Occupancy Form  12/14/2006 DONE
Telephone call  12/14/2006 DONE
lft vm with bryon smith ###-#### that permit and fees are ready to be picked up but needs ACHD/GC & RCE R/p
Permit Ready to Issue  12/14/2006 DONE
Routing - PLAN CHECK12/12/2006 12/13/2006  
Routing - PLANNING12/13/2006 12/13/2006 PASS
Approved per DRH03-00009 and associated modifications.
Routing - PLAN CHECK12/13/2006 12/13/2006 PASS
PLANS/APPL TAKEN TO FRONT DESK  12/13/2006 DONE
Plan assigned to (JCM)6/9/2006 12/13/2006 PASS
12/13/2006 16:13:07 JCM - activity updated through activity BLDA022 from case BLD06-01663.
Routing Off Site - STRUCTURAL12/5/2006 12/12/2006 PASS
Called Action Courier for pick up @ 11:39 on 12/5/06 BAS - Received a letter from the consulting structural engineer approving the resubmittals. JCM
Routing - PLUMBING12/6/2006 12/12/2006 PASS
existing sewer under building may need to be upgraded or relocated. interior plumbing for fixtures will be done with a future t.i.
Routing Off Site - STRUCTURAL12/7/2006 12/12/2006 PASS
called action couriers for pick up of resubmittals and deliver to AHJ Engineers 11:55 am//12/7/06 LEG - Received a letter from the consulting structural engineer approving the resubmittals. JCM
Plan resubmittals received  12/7/2006  
Received transmittal letter and 2 copies of Supplemental Structural Design Calculations; taken to John Menard
Routing - PLAN CHECK12/5/2006 12/5/2006  
Routing - PLUMBING12/1/2006 12/5/2006 FAIL
no corrections, resent original review
Plan resubmittals received  12/1/2006  
Received 3 copies of the following: 1pg. response letter from Byron Lee Architect, 1pg. response from CSHQA, 1pg. response from Speck Buildings, 6pgs. of metal building drawings on 11" x 17" pages S-2, S-9, S-10, S-11, S-12, S-13; also recieved three full size copies of pages S-9, S-10, S-11, S-12, S-13; 2 copies of Structural Calculations, 2 copies of Loseke Technologies Building Systems Software, 3 copies of the following full size pages: A0.0, S0.1, S1.1, S3.1; taken to John Menard
Routing - PUBLIC WORKS11/30/2006 12/1/2006 PASS
Routing - PLANNING Land Div11/29/2006 11/30/2006 PASS
Parcel has been combined into one parcel and new Tax Parcel Number has been issued by the Ada County Assessor.
Routing - PLAN CHECK11/14/2006 11/29/2006  
Routing - PLANNING Land Div11/13/2006 11/14/2006 PEND
Property is still shown as two parcels on Ada County Assessor's Map, November 14, 2006. Need copy of recorded Notice of Buildable Parcel.
Routing - PLAN CHECK11/7/2006 11/13/2006  
Plan resubmittals requested  11/13/2006 DONE
Faxed the architect a copy of the review from the consulting structural engineer requesting revisions. JCM
Routing Off Site - STRUCTURAL11/6/2006 11/9/2006 FAIL
Called Action Couriers for pick up 11-6-06 - Received a comment list from the consulting structural engineer requesting revisions. JCM
Routing - PLANNING11/6/2006 11/7/2006 FAIL
Applicant must show compliance with all Design Review conditions of approval on building plans. Revised drawings must also be submitted to Design Review staff.
CHANGE STATUS TO (REV)  11/6/2006 DONE
Routing - PLAN CHECK9/5/2006 11/6/2006  
Plan resubmittals received  11/6/2006  
Received 1pg. letter to John Menard from Byron Smith, 1pg. Service case Results slab loading, 2 copies of Structural Design Calculations, 2 copies of Structural Calculations for Metal Building System, A0.0, C-1, C-2, ESC-1, BFD-1, L1.1, A1.0, A2.0, A4.0, S0.1, S1.1, S3.1, S-1, S-2, S-3, S-4, S-5, S-6, S-7, S-8, S-9, S-10, S-11, S-12, S-13; taken to John Menard
Routing - FIRE8/31/2006 9/5/2006 PASS
Attached review comments to plans.
1st review completed  9/5/2006 FAIL
Failed plumbing, planning and plan check.
Plan resubmittals requested  8/31/2006 DONE
E-mailed the architect requesting a revised energy lighting compliance certificate. JCM
Routing - PLAN CHECK8/30/2006 8/31/2006 FAIL
Routing - PLANNING8/28/2006 8/30/2006 FAIL
Sara S. DRH03-00009-- DR approval has expired

Angela W. CUP03-00008
Routing - PLUMBING8/21/2006 8/28/2006 FAIL
existing sewer main under the proposed building must be of material approved for use with in or under a building. provide the above listed items. public works approval required prior to plumbing review approval. will require a 4" upper terminal cleanout.
Plan resubmittals received  8/22/2006  
received letter from byron lee smith architect in response to plan review dated july 6th, & cert of value. also received "2" sheets of 1 of 2 for E1.0, & "2" sheets of E2.0 /plans taken to john menard
Routing - PLANNING Land Div6/20/2006 8/16/2006 PEND
The applicant has indicated that they have started the process to combine the two parcels into one. Until the new parcel number is issued do not issue a Building Permit.
Routing - Erosion and Sediment8/16/2006 8/16/2006 PASS
ESC plan approved with attached conditions.
Plan resubmittals requested  7/6/2006 DONE
E-mailed the architect a copy of the plan review requesting revisions. JCM
Routing Off Site - STRUCTURAL6/9/2006 6/20/2006 FAIL
Received a comment list from the consulting structural engineer requesting revisions. JCM
Routing - PUBLIC WORKS6/15/2006 6/20/2006 FAIL
Easement required for new service line to Bldg D or parcels need to be combined. Contact Jim Pardy ###-####
Routing - PLANNING Land Div6/9/2006 6/15/2006 PASS
Plans ACCEPTED BY PLAN TECH  6/9/2006  
Plan routing begun/NEW & ADDTN  6/9/2006  
Application received  6/8/2006  
Recd Pcfee & Taken To Pln CK  6/8/2006  
Third Notice BLD10/30/200710/30/2007   
Second Notice has not been responded to.