Case Summary (BLD) | | | 9/5/2007 | | |
|
|
|
|
BLD-Other | 1/30/2007 | 1/30/2007 | 1/30/2007 | A | FAIL |
Bob Archibald
|
|
|
Permit holder has elected not to make improvements to this space as they will be relocating in August 08, at lease expiration, to a new location. Space has not been occupied and any proposed occupancy will require new permits and inspections prior to occupancy. A parcel hold shall remain on this property until such time.
|
DOC - Permit Expired | | | 1/30/2007 | | DONE |
|
|
|
|
MISC ACTIONS | | | 1/30/2007 | | DONE |
|
|
|
put parcel hold on for Bob A.
|
BLD-Aging Inspection | 9/27/2006 | 9/27/2006 | 10/4/2006 | | PASS |
Tony Young
|
|
|
|
(F) Reprint permit | | | 8/22/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/28/2006 | | DONE |
|
|
|
|
Telephone call | | | 6/28/2006 | | DONE |
|
|
|
Left voice message for Liza that permit is ready & fees///6/28/06 @8:45am BAS
|
Issue PAID IN FULL permit | | | 6/28/2006 | | DONE |
|
|
|
|
Plan assigned to (JCB) | 6/13/2006 | | 6/27/2006 | | PASS |
|
|
|
6/27/2006 14:23:02 JCB - activity updated through activity BLDA022 from case BLD06-01664.
|
Routing - FIRE | 6/26/2006 | | 6/27/2006 | | PASS |
|
|
|
Attached review comments on plans.
|
1st review completed | | | 6/27/2006 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 6/27/2006 | | 6/27/2006 | | PEND |
|
|
|
Plans to route to Planning/Design Review for approval.
|
Routing - PLANNING | 6/27/2006 | | 6/27/2006 | | PASS |
|
|
|
Meets requirements of DRH05-00115.
|
Routing - PLAN CHECK | 6/27/2006 | | 6/27/2006 | | PASS |
|
|
|
Permit and plans approved and taken to front desk.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/27/2006 | | PASS |
|
|
|
|
Print Occupancy Form | | | 6/27/2006 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 6/20/2006 | | 6/26/2006 | | PEND |
|
|
|
Plan review e-mailed to architect. No response required. Plans to route to Fire Dept. for review. Plans will then need to route to Planning/Design Review again prior to permit issuance.
|
Plan resubmittals received | | | 6/26/2006 | | |
|
|
|
Received 1 cover transmittal letter, 1 copy of cert of value, 1 copy of letter to Wayne Gibbs (10-15-92) from Liza Goul, 1 copy of response letter to Liza Goul (10-16-92) from Wayne Gibbs, 1 copy of HVAC Load Analysis, 3 copies of the following sheets--A1.1, A-1.2, EC-1.0, EC-1 and taken to Jason Blais
|
Plan Reviewer's activity | | | 6/23/2006 | | DONE |
|
|
|
Consulted with Marlene Southard, George Slane, Bob Archibald, and Jim Schmer. Majority opinion was that wood framed furring with gypsum board was adequate to encapsulate the existing sprayed on foam insulation on the exterior walls. Electrical within the furred walls will be within raceways.
|
Telephone call | | | 6/22/2006 | | DONE |
|
|
|
Called Cindy of Glancey/Rockwell Architects to discuss some of the issues previously discussed that need to be on the plans. She acknowledged and will address and provide resubmittal sheets.
|
Routing - PLUMBING | 6/19/2006 | | 6/20/2006 | | PASS |
|
|
|
if any plumbing work other than minor fixture relocation is done in this building approved plumbing plans will be required.
|
Routing - PLANNING | 6/14/2006 | | 6/19/2006 | | FAIL |
|
|
|
Cody Riddle DRH05-00115
|
Routing - PUBLIC WORKS | 6/13/2006 | | 6/14/2006 | | PASS |
|
|
|
|
Routing Off Site - C.D.H | 6/9/2006 | | 6/13/2006 | | PASS |
|
|
|
Plans routed by applicant to Central District Health for review and approval. Plans approved by Bud Fulleton, CDH, and returned by applicant on 6/13/06.
|
Recd Pcfee & Taken To Pln CK | | | 6/13/2006 | | |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/13/2006 | | |
|
|
|
|
Telephone call | | | 6/9/2006 | | DONE |
|
|
|
called Liza Goal and arch. Peter Rockwell, left messages for both to pick up plans because needs to be stamped and signed by CDHD.
|
CHANGE STATUS TO (PND) | | | 6/9/2006 | | DONE |
|
|
|
pending plans stamped and signed by CDHD
|
Application received | | | 6/8/2006 | | |
|
|
|
|