Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD06-01671
StatusFinaled
Name BMI CONSTRUCTION
Site Address 4095 S GEKELER LN
Project Name 
Customer Number 
ePlanReviewNo
Description
(BMI Construction RCE-1369) - Ace Company (Fabrication Building) - To construct a new 9,600 square foot, one story, pre-engineered steel fabrication building and related site improvements. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD9/22/20089/22/20081/21/2009 DONE
DetailsCathy Brown
Second Notice has not been responded to.
Telephone call  1/21/2009 DONE
tlk to dwight butlin ###-#### final value remain the same according owner - he sold his business right after did this job and moved out of the city doing permit in other county 3:30 pm
Second Notice BLD8/11/20088/11/20089/22/2008 DONE
DetailsCathy Brown
First Notice has not been responded to.
First Notice4/24/20084/24/20088/11/2008 DONE
DetailsJim Storey
BLD-Aging Inspection4/24/20084/24/20084/24/2008 PASS
DetailsJim Storey
DOC - Permit Finaled4/24/20084/24/20084/24/2008PPASS
DetailsJim Storey
FIRE-Final Inspection2/7/20082/7/20082/7/2008PPASS
DetailsForrest France
Fire life safety finaled.
BLD-Aging Inspection2/6/20082/7/20082/7/2008APASS
DetailsForrest France
Project is okay for final per project activities and previous inspection completed 4/19/07.
BLD-Aging Inspection2/6/20082/6/20082/6/2008 DEFR
DetailsJim Storey
defr to fire pending d henaman agreement
BLD-Aging Inspection11/30/200711/30/200711/30/2007 PASS
DetailsJim Storey
final ok previously
BLD-Final6/7/20076/8/20076/8/2007APASS
DetailsJim Storey
raleigh; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
Permanent Occupancy 6/1/20076/1/2007 DONE
Details
PubWorks Occupancy Approval5/23/20075/23/20075/23/2007 DONE
BLD-Final5/18/20075/21/20075/21/2007AFAIL
DetailsJim Storey
Bill; Phone #: ###-#### x 3104 Internet Inspection Request from: Cathy Weisshaupt 1/2 inch roll in shower access/ plate on ramp for ada acces at roof diain.
FIRE-Final Inspection4/18/20074/19/20074/19/2007PPASS
DetailsForrest France
Fire life safety finaled.
Temporary occupancy  1/25/2007 DONE
Temp. Occ. Cert. # 5518 issued 1-25-07 to Ace Company.
FIRE-Final Inspection1/23/20071/24/20071/24/2007APART
DetailsForrest France
Approved for temporary occupancy per D. Hanneman until the fire lane asphalt paving and signage is complete. Noted to contractor missing knox box and signage at the FACP room door to be completed prior to final.
BLD-Other1/23/20071/23/20071/23/2007PPART
DetailsJim Storey
OR ###-#### DWIGHT - FINAL FOR TEMP OCCUPANCY; Phone #: ###-#### Internet Inspection Request from: Victoria Beall temp ok pending all others/ 1/2 inch max on shower. c/n
FIRE-Final Inspection1/22/20071/23/20071/23/2007PFAIL
DetailsTroy Cobbley
No life safety inspected since the fire alarm failed and the sprinkler permit failed.
BLD-Energy code compliance11/30/200611/30/200611/30/2006PPASS
DetailsJim Storey
dwight - insulation ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
BLD-Framing/Rough-in11/22/200611/24/200611/24/2006APASS
DetailsJim Storey
MIKE; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
(F) Reprint permit  8/29/2006  
Issue PAID IN FULL permit  8/28/2006 DONE
Routing - PLAN CHECK8/3/2006 8/7/2006 PASS
Plan Reviewer's activity  8/7/2006 PASS
Plan reviewed and approved for structural and nonstructural revisions. JCM
PLANS/APPL TAKEN TO FRONT DESK  8/7/2006 DONE
Print Occupancy Form  8/7/2006 DONE
Telephone call  8/7/2006 DONE
left mess with bart miller at ###-#### that permit is ready & need achd
Permit Ready to Issue  8/7/2006 DONE
Plan assigned to (JCM)6/12/2006 8/7/2006 PASS
8/7/2006 10:29:40 JCM - activity updated through activity BLDA022 from case BLD06-01671.
Routing - PLUMBING8/2/2006 8/3/2006 PASS
use boise city approved flammable liquids interceptor detail, attached
Routing - PLANNING8/1/2006 8/2/2006 PASS
Approved per DRH06-00153.
Routing - PLAN CHECK7/25/2006 8/1/2006  
Plan resubmittals received  7/28/2006  
Received 2 copies of 1pg. response, 2 copies of Supplemental Structural Calculations, 2 copies of the following pages: A1, A2, A3, A4, water improvement plans, sewer & water improvement plans, drainage & erosion plans, Curb Gutter & Sidewalk plans, S1, S2, S3, E0.0, E2.0F, E2.0L, E2.0P, E3.0, E3.1, P1, P2, M1, M2; taken to John Menard
Routing - FIRE7/20/2006 7/25/2006 PASS
Attached review comments to plans.
1st review completed  7/25/2006 FAIL
Failed Plan Check, Planning & Plumbing.
Plan resubmittals requested  7/20/2006 DONE
E-mailed the architect a copy of the cover letter and plan review comment list requesting revisions. JCM
Routing - PLAN CHECK6/26/2006 7/20/2006 FAIL
John Menard
Plan resubmittals requested  6/29/2006 DONE
E-mailed the architect a copy of the comment list from the consulting structural engineer requesting revisions. JCM
Routing Off Site - STRUCTURAL6/12/2006 6/26/2006 FAIL
Received comment list from the consulting structural engineer requesting revisions. JCM
Routing - PLANNING6/22/2006 6/26/2006 FAIL
Failed, no revised Design Review files. DRH06-00153, Greg Johnson
Routing - PLUMBING6/22/2006 6/22/2006 FAIL
provide drawings of the site sewer and water to the new building and water &waste and vents with in the building, building water serviceto be provided with backflow protection, provide drawings and details of oil and sand trap all per approved design. and a fixture list,
Routing - Erosion and Sediment6/20/2006 6/22/2006 PASS
ESC plan approved with attached conditions.
Routing - PUBLIC WORKS6/15/2006 6/20/2006 PASS
Routing - PLANNING Land Div6/12/2006 6/15/2006 PASS
Recd Pcfee & Taken To Pln CK  6/12/2006  
Plans ACCEPTED BY PLAN TECH  6/12/2006  
Plan routing begun/NEW & ADDTN  6/12/2006  
Application received  6/9/2006