DOC - Permit Expired | 5/3/2010 | 5/3/2010 | 5/3/2010 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 4/29/2010 | 4/29/2010 | 5/3/2010 | | PASS |
Dave Hannah
|
|
|
|
Code Occupancy Approval | 9/19/2007 | 9/19/2007 | 9/19/2007 | P | PASS |
Joe R Venneman
|
|
|
Inspection 9/19 - landscaping meets plans, and second exit installed from pool; gats are latching and swing in as called for by plans.
|
BLD-Conference | 9/17/2007 | 9/17/2007 | 9/17/2007 | P | PART |
Dave Hannah
|
|
|
jesse Phone #: ###-#### needs terry and zoning finals needs ok from bld off on locks
|
BLD-Final | 9/12/2007 | 9/14/2007 | 9/14/2007 | A | NR |
Tom Arcoraci
|
|
|
JESSE Phone #: ###-####
|
Inspection Record Card- Bld | | | 9/14/2007 | | DONE |
|
|
|
|
FIRE-Final Inspection | 7/31/2007 | 8/1/2007 | 8/1/2007 | P | PASS |
Forrest France
|
|
|
c/n items have been completed, noted keyed locks at the restroom doors to be blanked or removed to enable exit under any conditon (to be done prior to final structural inspection).
|
FIRE-Final Inspection | 5/30/2007 | 6/1/2007 | 6/1/2007 | A | FAIL |
Forrest France
|
|
|
Need to post building address numbers, mount fire extinguisher as discussed, provide approved hardware at the two pool enclosure gates, manual thumbturns at the two restroom doors are not allowed, also need to provide approved plans and inspection record card at next visit.
|
BLD-Final | 5/29/2007 | 5/29/2007 | 5/29/2007 | P | NR |
Dave Hannah
|
|
|
Jesse ###-#### please call for access needs other trades to final first
|
Case Summary (BLD) | | | 5/29/2007 | | DONE |
|
|
|
|
BLD-Energy code compliance | 1/19/2007 | 1/19/2007 | 1/19/2007 | P | PASS |
Mike Jordan
|
|
|
rick dodder; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Insul. ok. posted c/n noting to verify elec ri prior to cover.
|
BLD-Framing/Rough-in | 1/17/2007 | 1/17/2007 | 1/17/2007 | P | PASS |
Dave Hannah
|
|
|
rick; Phone #: ###-#### Internet Inspection Request from: Darla Downs ok to insulate
|
BLD-Wall cover | 1/15/2007 | 1/16/2007 | 1/16/2007 | P | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 1/15/2007 at 5:13:36 PM. Contact: ###-####.needs seal package and fire blocking of furred out walls
|
BLD-Framing/Rough-in | 12/27/2006 | 12/28/2006 | 12/28/2006 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/27/2006 at 10:43:45 AM. Contact: ###-####. o0k to cover ext
|
BLD-Foundation | 10/25/2006 | 10/27/2006 | 10/27/2006 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 10/25/2006 at 4:56:24 PM. Contact: ###-####.
|
PubWorks Occupancy Approval | 10/23/2006 | 10/23/2006 | 10/23/2006 | | DONE |
|
|
|
Footing subgrade approved by the geotechnical engineer
|
BLD-Footing | 10/19/2006 | 10/20/2006 | 10/20/2006 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 10/19/2006 at 3:05:28 PM. Contact: ###-####. mti called me they are ok with subgrade terry records is ok with not having the paper work as long as they sind it mti will get it in asap mti is also doind spec inspection on bar ok to pour
|
(F) Reprint permit | | | 9/18/2006 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 9/15/2006 | | DONE |
|
|
|
|
Telephone call | | | 9/11/2006 | | DONE |
|
|
|
lft vm with any erstad ###-#### that permit and fees are ready to be picked up but needs GC/RC and left ms about refund for PW of $190 to jami grasmick 3900
|
Permit Ready to Issue | | | 9/11/2006 | | DONE |
|
|
|
|
1st review completed | | | 9/8/2006 | | FAIL |
|
|
|
Failed Plan Check.
|
Routing - PLAN CHECK | 9/8/2006 | | 9/8/2006 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/8/2006 | | DONE |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 9/8/2006 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 9/8/2006 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/8/2006 | | DONE |
|
|
|
|
Plan assigned to (M_P) | 7/21/2006 | | 9/8/2006 | | PASS |
|
|
|
9/8/2006 09:05:35 M_P - activity updated through activity BLDA022 from case BLD06-01681.
|
Routing - FIRE | 9/5/2006 | | 9/8/2006 | | PASS |
|
|
|
No review comments attached.
|
Routing - PLAN CHECK | 8/22/2006 | | 9/5/2006 | | PEND |
|
|
|
|
Case Summary (BLD) | | | 9/5/2006 | | |
|
|
|
|
Case Summary (BLD) | | | 9/5/2006 | | |
|
|
|
|
Routing - PLUMBING | 8/18/2006 | | 8/22/2006 | | PASS |
|
|
|
per plans and 2003 upc
|
Routing - PLAN CHECK | 8/15/2006 | | 8/18/2006 | | |
|
|
|
Routing to Plumbing.
|
Plan resubmittals received | | | 8/17/2006 | | DONE |
|
|
|
Received 1 transmittal letter, & 2 copys of sheet C2.0 taken to Mike P.
|
Routing - PLAN CHECK | 8/10/2006 | | 8/15/2006 | | FAIL |
|
|
|
Sent submittal letter requesting additional informaiton to be submitted prior to conducting my plan review.
|
Routing - PLANNING | 8/2/2006 | | 8/8/2006 | | PASS |
|
|
|
8/3/06 No DR required. Sent documents to Susan Riggs for CUP approval. SMS
|
Plan resubmittals received | | | 8/7/2006 | | DONE |
|
|
|
Received transmittal and 2 copys of sheet P1.00 taken to Mike P
|
Routing - PLUMBING | 7/31/2006 | | 8/2/2006 | | FAIL |
|
|
|
provide a hub drain or a floor sink for pool equipment. provide fixture schedule, provide water heaater detail with thermol expantion protection. provide above listed items.
|
Routing - PUBLIC WORKS | 7/25/2006 | | 7/31/2006 | | PASS |
|
|
|
|
Routing - Erosion and Sediment | 7/31/2006 | | 7/31/2006 | | PASS |
|
|
|
ESC plan approved with attached conditions. ESC plan dated 8-8-05.
|
Routing - PUBLIC WORKS GRADING | 7/26/2006 | | 7/26/2006 | | PASS |
|
|
|
Grading and drainage approved
|
Routing - PLANNING Land Div | 7/24/2006 | | 7/25/2006 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/24/2006 | | |
|
|
|
Re-open permit
|
Plan routing begun/NEW & ADDTN | | | 7/24/2006 | | |
|
|
|
|
CHANGE STATUS TO (PND) | | | 7/18/2006 | | |
|
|
|
paying fees
|
Application received | | | 6/13/2006 | | |
|
|
|
|
VOIDED CHANGE STATUS | | | 6/13/2006 | | DONE |
|
|
|
Needs to go through a plan intake meeting
|