Case Summary (BLD) | | | 4/14/2010 | | DONE |
|
|
|
|
BLD-Final | 8/6/2007 | 8/6/2007 | 8/6/2007 | P | PASS |
Mike Jordan
|
|
|
calvin Phone #: ###-####
|
DOC - Permit Finaled | 8/6/2007 | 8/6/2007 | 8/6/2007 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Energy code compliance | 5/30/2007 | 5/30/2007 | 5/30/2007 | A | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 5/29/2007 at 11:59:18 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 5/24/2007 | 5/24/2007 | 5/24/2007 | P | FAIL |
Mike Jordan
|
|
|
Calvin; Phone #: ###-#### Internet Inspection Request from: Victoria Beall. Needs blocking every 8ft. at 2x8 walls. ok to insul.
|
BLD-Footing | 4/16/2007 | 4/17/2007 | 4/17/2007 | P | PASS |
Mike Jordan
|
|
|
Ben; Phone #: ###-#### Internet Inspection Request from: Stacie Backus
|
Issue PAID IN FULL permit | | | 4/11/2007 | | |
|
|
|
|
Plan assigned to (SRZ) | 6/30/2006 | 6/30/2006 | 4/10/2007 | | PASS |
|
|
|
4/10/2007 14:39:50 SRZ - activity updated through activity BLDA022 from case BLD06-01683.
|
Routing - PLAN CHECK | 7/5/2006 | | 4/10/2007 | | PASS |
|
|
|
|
Case Summary (BLD) | | | 4/10/2007 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/10/2007 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/10/2007 | | DONE |
|
|
|
|
Telephone call | | | 4/10/2007 | | DONE |
|
|
|
t/c w alex at high desert const. ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 4/10/2007 | | DONE |
|
|
|
|
Plan resubmittals received | | | 4/6/2007 | | DONE |
|
|
|
recieved Tall wall Engineering
|
Telephone call | | | 3/28/2007 | | DONE |
|
|
|
questions concerning pending building permits.
|
Telephone call | | | 8/10/2006 | | DONE |
|
|
|
Reminder that plan submittals are still required to finish plan review. (SRZ)
|
Plan resubmittals requested | | | 7/5/2006 | | FAIL |
|
|
|
No Wall Bracing called out on plans. Show all locations of Wall bracing panels on plans. Tall Wall Engineering required for Living room wall. (SRZ)
|
Routing - PLAN CHECK | 6/14/2006 | | 7/5/2006 | | FAIL |
|
|
|
No Wall Bracing called out on plans. Show all locations of Wall bracing panels on plans. Tall Wall Engineering required for Living room wall. (SRZ)
|
Plan assigned to (SAM) | 6/13/2006 | 6/13/2006 | 6/30/2006 | | DONE |
|
|
|
|
Routing - PLANNING | 6/13/2006 | | 6/14/2006 | | PASS |
|
|
|
O.K. as redlined. Needs 3' wide landscape strip between P.L. and driveway edge. DA was for density prior to platting
|
Routing - PUBLIC WORKS | 6/14/2006 | | 6/14/2006 | | PASS |
|
|
|
|
Routing - Addressing | 6/13/2006 | | 6/13/2006 | | PASS |
|
|
|
|
Application received | | | 6/13/2006 | | |
|
|
|
|