Permit Information
Permit NumberBLD06-01695
StatusFinaled
Name HOSPITALITY BUILDERS
Site Address 700 N COLE RD
Project NameCandlewood Suites-Hotel
Customer Number 
ePlanReviewNo
Description
(CANDLEWOOD SUITES HOTEL) To construct a 43,671 sq.ft. three story hotel with 77 extended stay suites per approved plans and CUP06-00018 & DRH06-00082. Grading & drainage issued under BLD06-02454. The architect has declared the extended stay units are restricted to less than 30 days to maintain the R-1 occupancy classification. This building to be fully fire sprinklered with a NFPA 13 system which will allow nonrated construction and increased story height. (Note: Plan review by outside consultant for IBC-nonstructural/IMC/IECC.) (PLAN MODIFICATION 7/18/07) * To remodel and split an existing conference room which is located on the first floor across from the elevator lobby and make into a prep kitchen and add a bedroom to the existing studio suite.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD12/11/200712/11/200712/26/2007 DONE
Second Notice has not been responded to.
Third Notice BLD12/11/200712/11/200712/26/2007 DONE
Second Notice has not been responded to.
Second Notice BLD11/19/200711/19/200712/11/2007 DONE
First Notice has not been responded to.
Second Notice BLD11/19/200711/19/200712/11/2007 DONE
First Notice has not been responded to.
First Notice 11/9/200711/19/2007 DONE
First Notice 11/9/200711/19/2007 DONE
Permanent Occupancy UNPAID FEE  11/9/2007 DONE
BLD-Final10/12/200710/12/200710/12/2007PPASS
DetailsTom Arcoraci
rob Phone #: ###-####
FIRE-Final Inspection10/12/200710/12/200710/12/2007PPASS
DetailsTroy Cobbley
Life safety finaled
BLD-Wall cover9/26/20079/27/20079/27/2007ACANC
DetailsTom Arcoraci
call rob
BLD-Final9/21/20079/24/20079/24/2007APART
DetailsTom Arcoraci
rob Phone #: ###-####
BLD-Final9/21/20079/21/20079/21/2007PPART
DetailsTom Arcoraci
ok for temp
Temporary Occupancy9/21/200712/20/20079/21/2007 DONE
FIRE-Final Inspection 9/21/20079/21/2007 PART
Partial Fire final inspection; Approved for TOC; remaining items for Permanent CO are: 1) provide FD access roadway signs at the entrance of both FD roadways on the north side of the bldg (NW and NE corners); 2) post 4" or larger address numbers on the front of the building, or on the front (street) side of the Candlewood sign); 3) verify proper FA monitoring of the 120v shunt trip power monitoring, (to be done jointly by our fire alarm inspector and the State elevator inspector); 4) Provide sprinkler valve monitoring of the two anti-freeze sprinkler control valves (handles temporarily removed); 5) Provide permanent labels on the antifreeze system to indicate the type of antifreeze solution, quantity, and freeze point in accordance with NFPA (16.5). Upon completion of these items the Spk and FA permits can be finaled, whereupon the Bldg permit can be Passed by Fire.
Code Occupancy Approval Temp9/20/20079/20/20079/20/2007PDONE
DetailsScott M.Brown
SMALL AREA IN REAR NEEDS GRASS BUT I WILLNOT MAKE THEM BOND. THEY HAD TO WORK WITH MERIDIAN NAMPA CANAL COMPANY SO REQUIRMENTS ARE THEIRS. OK FOR TEMP OCCUPANCY ONLY
FIRE-Final Inspection9/20/20079/20/20079/20/2007PFAIL
DetailsTroy Cobbley
Provide building address, provide fire dept access signage, repair the exit discharge light at the first floor north center exit, repair the third floor center exit light, provide emergency lighting in both of the stairwells as per plan, provide annual inspection tags for the fire extinguishers, final fire alarm permit and fire sprinkler permits.
Telephone call  9/20/2007 DONE
I called Mr. FLeming at Sonmar, not available; left voice message explaining the results of today's inspections by M. Timmerman and T. Cobbley. FA contractor had no one available today for the test and indicated he would schedule for tomorrow. The sprinkler system FDC was installed in a different location than on the approved plans and will require review by the FM for special approval ; the life safety items pointed out two days ago are still not done; no inspection tags on extinguishers, no building address posted, no signage on FD access roadways; no emergency lites in the two stairwells (12 are shown on plans), one exit discharge lite non-functional, one interior exit sign non functional.
Print Occupancy Form  9/20/2007 DONE
Telephone call  9/20/2007 DONE
telcon with Dave Hanneman re a faxed sketch received from Shiloh showing the installed location of the FDC. He has concerns about the location and will make a site visit to evaluate further. Will probably be Monday before a decision can be made.
Meeting  9/19/2007 DONE
Unannounced "walk-in" meeting at 1:45 pm with Mr. Maring and Mr. Fleming of Sonmar Mgt.(owner) and General Contractor Rob(?), to request more inspection time to get the project finaled. They were under the impression the project was only waiting for inspections. I explained we had made several inspections and special visits and the sprinklers and alarm inspections have only been terminated after it became apparent that the contractors were not ready for the inspection. Due to excessive workloads, we do not have manpower to allow us to do a complete punch-list inspection or wait onsite for remedial work to be completed. The "as-built" Fire alarm plans were just resubmitted late this morning and I had promised the alarm contractor that if the plans are acceptable, we will review plans today and conduct a complete alarm inspection tomorrow, after he picks up the approved plans. Our fire inspector had already advised me that he made plans to make what he anticipates should be the final sprinkler inspection tomorrow, assuming they have completed the work on his punch list. However, he found today that 5 of the 6 items had still not been completed and several deficiencies pertaining to life safety had been pointed out to the contractor (e.g. PFE's not provided with inspection tags; signage lacking on FD access roadway). I indicated that after the sprinkler and alarm inspections, we would conduct a full life safety inspection. Assuming the contractors properly pre-inspected their work, the inspections should pass and all the permits should be able to be finaled by the end of the day. I will advise Mr. Maring of the results of tomorrow's inspections. (###-####).
BLD-Other8/24/20078/24/20078/24/2007PPASS
DetailsTom Arcoraci
BLD-Other8/17/20078/20/20078/20/2007APASS
DetailsTom Arcoraci
grid ok 3 2 floor
BLD-Conference8/13/20078/14/20078/14/2007APASS
DetailsJim Storey
rob - drywall -as soon as possible Phone #: ###-#### floor ceilling at storage rm 2 and 3 rd floors fire stopped and gyp ok to cover fur out.
BLD-Framing/Rough-in8/13/20078/13/20078/13/2007PDEFR
DetailsJim Storey
rob - drywall -as soon as possible Phone #: ###-#### no one at site/ am rolled over.
BLD-Other8/3/20078/3/20078/3/2007PPASS
DetailsTom Arcoraci
BLD-Wall cover7/23/20077/24/20077/24/2007APASS
DetailsTom Arcoraci
Routing - FRONT DESK7/24/2007 7/24/2007 PASS
PLANS/APPL TAKEN TO FRONT DESK  7/24/2007 DONE
Print Occupancy Form  7/24/2007 DONE
Telephone call  7/24/2007 DONE
t/c w martin donaf at ###-#### - plan modification ready to be picked up - fees given
Permit Ready to Issue  7/24/2007 DONE
Routing - PLAN CHECK7/20/2007 7/24/2007 PASS
Plan assigned to (MYS)6/26/2007 7/24/2007 DONE
PLAN MODIFICATION. Building review done by Mike Phillips.
Routing - FIRE7/18/2007 7/20/2007 PASS
PLAN MOIFICATION. Forwarded updated fire code review comments to fire sprinkler contractor and fire sprinkler plan reviewer.
BLD-Framing/Rough-in7/18/20077/19/20077/19/2007AFAIL
DetailsTom Arcoraci
rob - ###-#### needs to resubmit for elevator lobby change
Override - Parcel Holds  7/18/2007  
Routing - PLAN CHECK7/17/2007 7/18/2007 PEND
PLAN MODIFICATION Mike P.
BLD-Wall cover7/13/20077/13/20077/13/2007PPASS
DetailsTom Arcoraci
Routing - PLUMBING7/5/2007 7/9/2007 PASS
PLAN MODIFICATION foodprep sink and hand sink must be separately wasted. note 91 page FP.
Routing - PLANNING7/2/2007 7/5/2007 PASS
PLAN MODIFICATION (Sarah Schafer) - Approved per the DRH. There are no concerns for the CUP per Cody Riddle.
Routing - PUBLIC WORKS6/28/2007 7/2/2007 PASS
PLAN MODIFICATION
Routing Off Site - C.D.H6/27/2007 6/28/2007 PASS
PLAN MODIFICATION hand carried by applicant to CDH for their approval. Approved by Deb Carney at CDH.
Plan Modification Accepted  6/26/2007  
PLAN MODIFICATION accepted for Bld06-01695 to take one of the guest rooms (113) and making it a food prep area outof half of it. The other half of the guest room will be a bedroom for guestoom #111. Attached are updated floor plans and plumbing drawings showing these changes. These drawings have been stamped by the architect and engineer of record. They have also been approved from the health department (Debby Karney); submitted on pages FP, P1.0, P1.1, P5.1; taken to Marlene Southard
Override - Parcel Holds  6/26/2007  
BLD-Framing/Rough-in6/11/20076/11/20076/11/2007PPART
DetailsJim Storey
rob; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang first floor rms septration and ceilling only ok to hang
BLD-Conference6/7/20076/7/20076/7/2007PCANC
DetailsTom Arcoraci
BLD-Other6/7/20076/7/20076/7/2007APASS
DetailsTom Arcoraci
wip ok 1st floor
BLD-Framing/Rough-in5/30/20075/30/20075/30/2007PPASS
DetailsTom Arcoraci
2nd floor
BLD-Framing/Rough-in5/29/20075/30/20075/30/2007ACANC
DetailsTom Arcoraci
rob ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
BLD-Conference5/24/20075/25/20075/25/2007PPASS
DetailsTom Arcoraci
rob
BLD-Framing/Rough-in5/18/20075/18/20075/18/2007PPASS
DetailsTom Arcoraci
rob; Phone #: ###-#### Internet Inspection Request from: Victoria Beall 2nd floor east side
BLD-Framing/Rough-in5/16/20075/18/20075/18/2007ACANC
DetailsTom Arcoraci
BLD-Framing/Rough-in5/16/20075/16/20075/16/2007PPART
DetailsTom Arcoraci
2nd floor only please--rob; Phone #: ###-#### Internet Inspection Request from: Barbara Stitt ok to insulate walls east side
BLD-Framing/Rough-in5/9/20075/10/20075/10/2007APART
DetailsTom Arcoraci
rob; Phone #: ###-#### Internet Inspection Request from: Victoria Beall THRID FLOOR OK
BLD-Other5/4/20075/4/20075/4/2007PPASS
DetailsTom Arcoraci
wip ok
BLD-Conference5/3/20075/3/20075/3/2007PCANC
DetailsTom Arcoraci
BLD-Other4/25/20074/26/20074/26/2007PPASS
DetailsTom Arcoraci
BLD-Framing/Rough-in4/18/20074/20/20074/19/2007ACANC
DetailsTom Arcoraci
rob or bruce at ###-#### ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
BLD-Other4/5/20074/12/20074/12/2007PPASS
DetailsTom Arcoraci
ok to rock cor lid per plan
BLD-Other4/3/20074/5/20074/5/2007PPASS
DetailsTom Arcoraci
wip per plan
BLD-Conference3/30/20073/30/20073/30/2007PPASS
DetailsTom Arcoraci
BLD-Conference3/23/20073/23/20073/30/2007PCANC
DetailsTom Arcoraci
BLD-Other3/22/20073/23/20073/23/2007ACANC
DetailsTom Arcoraci
BLD-Conference3/15/20073/21/20073/21/2007PCANC
DetailsTom Arcoraci
see rob 3 pm
BLD-Conference3/21/20073/21/20073/21/2007PPASS
DetailsTom Arcoraci
per plan
BLD-Wall cover3/9/20073/12/20073/12/2007APASS
DetailsTom Arcoraci
1st floor ext nail ok also
BLD-Other3/8/20073/8/20073/8/2007PPASS
DetailsTom Arcoraci
meet with mike on resub issues
BLD-Other3/1/20073/2/20073/5/2007APASS
DetailsTom Arcoraci
BLD-Other3/1/20073/1/20073/1/2007PPASS
DetailsTom Arcoraci
BLD-Conference3/1/20073/1/20073/1/2007APASS
DetailsTom Arcoraci
on plan changes
Plan resubmittals requested  2/16/2007 DONE
Received 1 plan review response,and 8 1/2 x 11 sheets 1 through 23 and sheets 25 through 34 taken to Mike P.
Plan resubmittals received  2/2/2007  
rec'd transmittal letter, memo from Elkhorn Engineers - 3 sets of sheet# M2.0 - taken to Mike Phillips
Plan Reviewer's activity  1/3/2007 DONE
Fire Review comments have been modified to reflect the plan modification which now requires a NFPA 13 sprinkler system (instead of a 13R) for non-rated construction and increased building height, per final IBC plan approval 12/4/06. Updated fire review comments have been faxed to the architect, Steven Elkins.
(F) Reprint permit  12/7/2006  
Issue PAID IN FULL permit  12/6/2006 DONE
CHANGE ISSUED DATE  12/6/2006  
Print Occupancy Form  12/4/2006 DONE
Telephone call  12/4/2006 DONE
tlk to steve elkins ###-#### that permit and fees are ready to be picked up
Permit Ready to Issue  12/4/2006 DONE
Routing - PLAN CHECK11/30/2006 12/1/2006 PASS
Marlene
PLANS/APPL TAKEN TO FRONT DESK  12/1/2006 DONE
Plan assigned to (MYS)6/20/2006 12/1/2006 PASS
12/1/2006 15:47:29 MYS - activity updated through activity BLDA022 from case BLD06-01695.
Routing - PLANNING11/29/2006 11/30/2006 PASS
Sarah Schafer DRH06-00082 Mod. #1 - Approved with notes as shown on the landscape plan.
Routing - PLAN CHECK11/22/2006 11/29/2006 PEND
11/22/06 - On HOLD in Plan review waiting to get updated plans to show compliance with Design Review modification which was approved by the committee on Nov. 17, 2006.
11/29/06 - Based on resubmittals received and an e-mail from the architect dated 11/2706 I have forwarded plans back to Sarah Schafer at DR for rereview.
Plan resubmittals received  11/24/2006  
Received transmittal sheet and two copies of the following pages: ST1.1, A1.1, A1.2, A1.3, A2.1, LA2.1; taken to Marlene Southard
Routing - PLANNING Land Div11/22/2006 11/22/2006 PASS
Deed #106131706 recorded that combined three parcels into one. Notice of Buildable Parcel recorded as #106159618. Boise City Council passed SOS06-00017 on November 14, 2006. Resolution being prepared by the Boise City Attorney's Office.
11/22/06-New parcel number assigned by Ada County is R9323610035.
Plan resubmittals received  11/21/2006  
Received 3 copies of page M2.0; taken to Marlene Southard
Routing - MECHANICAL11/21/2006 11/21/2006 PASS
Resubmittals received 11/21/06 to Lee Rice.
Routing - PLAN CHECK11/16/2006 11/21/2006 PEND
11/16/06 - On HOLD in Plan review waiting to hear from Land Division, Planning (DRH modification) and Mechanical final approvals.
11/21/06 - Routed resubmittals to Lee Rice for mechanical review.
Override - Parcel Holds  11/20/2006  
Routing - MECHANICAL11/14/2006 11/16/2006 FAIL
Contacted Ryan Benson from Elkhorn Engineers. Need resubmittal information on the dryers to be included on plan sheets. Upon resubmittals with updated information, mechanical can grant approval. Lee Rice
Routing - FIRE11/13/2006 11/14/2006 PASS
Faxed updated review comments to architect. Attached updated review comments to plans. Routed to mechanical for review.
Plan resubmittals received  11/13/2006 DONE
Recieved documentation from EHM engineers regarding the installation of new fire hydrant. Faxed updated review comments to architect.
Plan resubmittals received  11/13/2006  
Received 1 comment,1 fire review, &4 copys of sheet A1.1 taken to Mike P.
Routing - PLAN CHECK11/8/2006 11/9/2006 PEND
11/8/2006 Plans on hold waiting for resubmittals and resolution of mechanical, fire and land division items. Sent e-mail to architect to notify him of the remaining issues. (msouthard)
11/9/2006 Outside reviewer has approved for building code issues. Remaining items of fire and mechanical (Lee Rice) still need to be approved prior to issuance.
Plan resubmittals received  11/9/2006 DONE
Received 3 copies of M0.2, M2.0 and taken to Mike Phillips
Routing - PLAN CHECK11/1/2006 11/9/2006 PEND
11/1/06 Waiting for resubmittals from architect.
11/7/06 Received resubmittals from architect. Sent 2 copies along with cover documents to outside reviewer via Fed-Ex on 11/8/06. Routed in house plans back to Fire.
11/9/06 Plan review by outsourced code reviewer has been approved. Approval pending fire and mechanical (Lee Rice) approvals.
Routing - FIRE11/7/2006 11/8/2006 FAIL
Faxed resubmittal items to architect. Inserted updated review comments into plans.
Plan resubmittals received  11/7/2006  
Received 1 cover transmittal, 1 copy of plan review response from Steven Elkins Architects, 1 copy of plan review comments (3 pages), 4 copies of sheets A1.3, A5.2, CS1.1 and taken to Marlene S
Routing - PLAN CHECK10/12/2006 11/1/2006 FAIL
10/24/06 - Sent resubmittals to outside plan reviewer.
11/1/06 - Received 2nd review back from outside reviewer. Review failed and a copy sent to design architect for responses. Plans on hold in plan review waiting for resubmittals.
Plan resubmittals received  10/23/2006  
Received 2 memos,1 plan review fax transmittal, & 4 copys of sheets CS1.1,A1.1,A1.2,A1.3,A1.4 A1.5,A1.6,A1.7,A1.8,A1.11,A2.1,A4.1A,A5.1,A5.2,A7.1,A8.2,A11.1 taken to Mike P.
Plan resubmittals received  10/16/2006 DONE
Received 1 review comments,1 memorandum,3 copys of sheets E0.1,E0.2,E0.3,E1.1,E2.1F,E2.1L,E2.1P,E2.2F,E2.2L,E2.2P,E2.3F,E2.3L,E2.3P,E3.1,E3.2,E3.3,E4.1,E4.2,E5.1,E5.2,E6.1,E7.1 AND 4 copys of sheets M0.2,M1.1,M1.2,M1.3,M2.0 taken to Mike P.
Routing - FIRE10/10/2006 10/12/2006 FAIL
Faxed resubmittal items to 14268899174. Inserted review comments into plans.
1st review completed  10/12/2006 FAIL
Failed planning, plan check & Fire.
Routing - PLAN CHECK10/5/2006 10/10/2006 ----
Routed back to Fire for full IFC review.
Routing - PUBLIC WORKS10/5/2006 10/5/2006 PASS
Routing - PLAN CHECK9/28/2006 10/4/2006 ----
9/28/06 On hold in plan check waiting for outside consultant review and any resubmittals.
10/2/2006 Failed outside review. Copy of plan review faxed to architect.
10/5/06 Routed to P.W. for figuring additional sewer fees.
Routing - PLAN CHECK8/9/2006 10/2/2006 FAIL
9/15/06 Plans sent to contract reviewer for review of IBC (nonstructural including accessibility), IMC and IECC reviews. Plans sent via Fed-Ex. mys
9/19/06 Fed-Ex lost the plans so outside consultant did not receive until 9/19/06. mys
10/2/06 Received outside review. Needed some items changed. Sent e-mail to outside reviewer with my comments. Awaiting changed review prior to sending to designing architect. mys
Routing - FIRE9/22/2006 9/28/2006 FAIL
Pending IBC plan review. Awaiting Site plan resubmittal pertaning to fire department vehicle access roadways.
Routing Off Site - STRUCTURAL8/8/2006 8/14/2006 PASS
Called Action Couriers for pick up
Routing - PLANNING8/7/2006 8/9/2006 PASS
Conditions of CUP have been met, per the redlines on the architectural site plan.

Routed to S.Schafer per DRH. approved per DRH06-00082 with redlines on sheet L2.1
Routing - PLAN CHECK7/11/2006 8/7/2006 ----
Routing to Planning for a new review.
Plan resubmittals received  8/4/2006  
received letter of transmittal com application with cert of value, affidavit of legal interest, contractor registration application, state of idaho bureau of occupational licenses form, candlewood suites exterior lighting cut sheets, with (16) pages, & letter from ehm engineers inc, plan review division fax transmittal (2) sheets, (3) sets of supplemental structural design calculations from EHM with (3) cover sheetsconsisting of (19) pages for each set, also received "4" sets of plans consisting of CS1.1, ST1.1, ST1.2, ST1.3, A1.1, A1.2, A1.3, A1.4, A1.5, A1.6, A1.7, A1.8, A1.9, A2.1, A3.1, A3.2, A4.1a, A4.1b, A4.2a, A5.1, A5.2, A6.1, A6.2, A6.3, A7.1, A8.1, A8.2, A9.1, A9.2, A1.10, A1.11, A11.1, C1.0, C1.1, C2.0, C3.0, C4.0, C5.0, C6.0, S1.1, S2.1, S2.2, S2.3, S3.1, S4.1, S5.1, S5.2, S5.3, S6.1, S6.2, S6.3, S6.4, MO.O, MO.2, MO.1, M1.1, M1.2, M1.3, M2.O, EO.1, EO.2, EO.3, E1.1, E2.1F, E2.1L, E2.1P, E2.2F, E2.2L, E2.2P, E2.3F, E2.3L, E2.3P, E3.1, E3.2, E3.3, E4.1, E4.2, E5.1, E5.2, E6.1, E7.1, PO.O, PO.1, PO.2, PO.3, P1.O, P1.1, P1.2, P1.3, P4.O, P5.O, P5.1, P5.2, LA2.1, & grading & drainage plans (2) sets of plans with 3 sheets of C4.O, & 2 sheets of C5.O-plans taken to mike phillips
Routing - PLANNING7/5/2006 7/11/2006 FAIL
DRH06-00082- Sarah S
CUP06-00018- Cody R

Fail: Applicant has not met conditions of approval 1c, d and f from DR approval. Faxed applicant at 9:00 a.m.
Routing - PLUMBING6/27/2006 7/5/2006 PASS
120 deg. max. hot water to public lavs. suds relief will be required on stacks recieving the discharge of three floors of suds producing fixtures.
Routing Off Site - STRUCTURAL6/14/2006 6/28/2006 FAIL
Faxed comments to architect. Additional review requried by outside engineering firm.
Sent out to outside rngineering firm by Action Courier on 6/14/06 BAS
Routing - Erosion and Sediment6/26/2006 6/27/2006 PASS
ESC plan approved with attached conditions. Need RP when contractor is chosen and prior to start of construction.
Routing - PUBLIC WORKS6/21/2006 6/26/2006 PASS
Routing - PLANNING Land Div6/20/2006 6/21/2006 FAIL
the three existing parcels must be combined into one buildable parcel prior to issuance of a Building Permit and must vacate easement running through the property. (per D. Abo)
Recd Pcfee & Taken To Pln CK  6/20/2006 DONE
Plan routing begun/NEW & ADDTN  6/20/2006  
Additional plans submitted  6/19/2006  
Received 1 copy of cover transmittal and 3 copies of A9.1 and put with plans///6/19/06 @ 2:25pm BAS
Plans ACCEPTED BY PLAN TECH  6/15/2006  
called Steven Elkins and left voicemail that pg A9.1 the reflected ceiling plan 1st floor needs stamped and signed, called Gary Burkett in Twin Falls and left voicemail that C6.0 needs stamped and signed. Told both that plans cannot go through until this is resolved.
Telephone call  6/14/2006  
called Action Couriers for pick up and deliver to AHJ Engineers.
Application received  6/13/2006