Permit Information
Permit NumberBLD06-01696
StatusFinaled
Name PERISON LAW OFFICES
Site Address 314 S 9TH ST Unit: 300
Project NameBODO BLDG #4-Foster Bldg
Customer Number 
ePlanReviewNo
Description
(PERISON LAW OFFICES - HISTORIC FOSTER BUILDING - STE 300) This building is fire sprinklered for story increase. To create a 1,798 square foot whole floor office tenant space on the 3rd story of the Historic Foster Building. Work is to include interior nonbearing walls, a restroom accessible to the disabled, gypsum board ceilings, millwork, and finishes. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes. The fire sprinkler system shall comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD2/12/20072/12/20073/13/2007 DONE
Second Notice has not been responded to.
Second Notice BLD2/2/20072/2/20072/12/2007 DONE
First Notice has not been responded to.
First Notice 12/22/20062/2/2007 DONE
Permanent occupancy  12/22/2006 DONE
Perm. Occ. Cert. # 11366 issued 12-21-06 to the Perison Law Offices.
BLD-Final12/20/200612/21/200612/21/2006APASS
DetailsDave Hannah
joe; Phone #: ###-#### Internet Inspection Request from: Patricia Smith ok for perm occ
FIRE-Final Inspection12/20/200612/20/200612/20/2006PPASS
DetailsTroy Cobbley
life safety finaled
BLD-Framing/Rough-in10/30/200610/30/200610/30/2006PPASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 10/30/2006 at 9:12:41 AM. Contact: ###-####.
Issue PAID IN FULL permit  10/2/2006 DONE
Telephone call  9/20/2006 DONE
left mess for david ruby at ###-#### that permit is ready
Print Occupancy Form  7/17/2006 DONE
Telephone call  7/17/2006 DONE
called ###-#### and told David that permit is ready and fees
Permit Ready to Issue  7/17/2006 DONE
Routing - PLAN CHECK7/5/2006 7/15/2006 PASS
Drawings approved after resubmittal review.
PLANS/APPL TAKEN TO FRONT DESK  7/15/2006 DONE
Plan assigned to (CJW)6/20/2006 7/15/2006 PASS
7/15/2006 08:00:54 CJW - activity updated through activity BLDA022 from case BLD06-01696.
Plan resubmittals received  7/12/2006  
Received transmittal sheet, 2 pg. response, 2 copies of the following pages: A2.1, A9.1, M1.0; taken to Carl Westfall
Routing - FIRE7/3/2006 7/5/2006 PASS
Attached review comments to plans.
1st review completed  7/5/2006 FAIL
Failed Plan Check.
Routing - PLAN CHECK6/20/2006 7/3/2006 FAIL
The IBC plan review was started on Thursday June 29 and was finished on Monday July 3. Revised drawings were required. See the plan review report.
Routing - PUBLIC WORKS6/20/2006 6/20/2006 PASS
Plans ACCEPTED BY PLAN TECH  6/15/2006  
Application received  6/13/2006  
Recd Pcfee & Taken To Pln CK  6/13/2006