Permit Information
Permit NumberBLD06-01773
StatusFinaled
Name BANNER BANK IT DEPARTMENT
Site Address 950 W BANNOCK ST Unit: 260
Project Name10TH & BANNOCK-2ND FLR
Customer Number 
ePlanReviewNo
Description
(RCE-8247 CHRISTENSEN CORP) (BANNER BANK IT DEPARTMENT - BANNER BANK BUILDING - STE 260) This building is required to be fire sprinklered because it is a high-rise. To create a 1,610 square foot office tenant space on the 2nd story of an existing high-rise building. Work is to include Nordwall demountable partitions, interior nonrated doors, and glass sidelights. The common 1-hr corridor and core restrooms were constructed under permit BLD04-02348. The access floor system and the suspended ceilings were installed under permit BLD05-02939. The work is required to comply with the approved drawings, with the plan review report, and will all applicable codes. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  11/6/2015 DONE
Third Notice BLD5/25/20075/25/20071/18/2008 DONE
DetailsHattie E James
Second Notice has not been responded to.
(F) Reprint permit  8/2/2007 DONE
Second Notice BLD5/9/20075/9/20075/25/2007 DONE
First Notice has not been responded to.
First Notice 4/23/20075/9/2007 DONE
Permanent occupancy  4/23/2007 DONE
Perm. Occ. Cert. # 11539 issued 4-23-07 to Banner Bank IT Department.
BLD-Final8/7/20068/8/20068/8/2006PPASS
DetailsDave Hannah
greg; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley ok for perm occ
FIRE-Final Inspection8/7/20068/8/20068/8/2006APASS
DetailsForrest France
Fire life safety inspection passed.
Permanent Occupancy 8/8/20068/8/2006 DONE
Details
BLD-Framing/Rough-in7/21/20067/24/20067/24/2006PPASS
DetailsDave Hannah
tucker anderson; Phone #: ###-#### Internet Inspection Request from: Letitia Gallop
Telephone call  7/14/2006 DONE
tlk to secretary for gary christensen ###-#### that permit and fees are ready to be picked up
Permit Ready to Issue  7/14/2006 DONE
Issue PAID IN FULL permit  7/14/2006 DONE
Print Occupancy Form  7/13/2006 DONE
Plan assigned to (CJW)6/21/2006 7/12/2006 PASS
7/12/2006 14:41:51 CJW - activity updated through activity BLDA022 from case BLD06-01773.
Routing - FIRE7/10/2006 7/12/2006 PASS
Attached review comments to plans.
1st review completed  7/12/2006 PASS
PLANS/APPL TAKEN TO FRONT DESK  7/12/2006 DONE
Routing - PLAN CHECK6/21/2006 7/10/2006 PASS
The IBC plan review was started and finished on July 10, 2006. The drawings were approved with notes. See the plan review report.
Routing - PUBLIC WORKS6/21/2006 6/21/2006 PASS
Application received  6/20/2006  
Recd Pcfee & Taken To Pln CK  6/20/2006 DONE
Plans ACCEPTED BY PLAN TECH  6/20/2006  
Routing - PLAN CHECK7/12/2006