Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD06-01779
StatusFinaled
Name DAVE EVANS CONSTRUCTION
Site Address 1951 W FREDERIC LN
Project NameBright Advertising
Customer Number 
ePlanReviewNo
Description
(RCE-2452-Dave Evans Construction) - Bright Advertising - To construct a new 2,600 square foot, one story, wood framed office building and related site improvements. All construction per the approved plans. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD1/8/20071/8/20071/25/2007 DONE
Second Notice has not been responded to.
Second Notice BLD12/27/200612/27/20061/8/2007 DONE
First Notice has not been responded to.
First Notice 12/12/200612/27/2006 DONE
BLD-Final11/29/200611/30/200611/30/2006APASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 11/29/2006 at 1:38:42 PM. Contact: ###-####.
OK for Perm Occ.
Permanent occupancy  11/30/2006 DONE
Perm. Occ. Cert. # 11332 issued 11-30-06 to Bright Advertising.
FIRE-Final Inspection11/16/200611/17/200611/17/2006PPASS
DetailsForrest France
Required corrections have been made, inspection passed.
FIRE-Final Inspection11/14/200611/15/200611/15/2006AFAIL
DetailsTroy Cobbley
Provide indicator at the main exit and either remove the non required exit discharge lights or provide listed devices for the damp and cold temperatures.
BLD-Framing/Rough-in9/20/20069/21/20069/21/2006PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 9/20/2006 at 1:31:12 PM. Contact: ###-####.gyp on eaves ok to cover
BLD-Energy code compliance9/19/20069/19/20069/19/2006PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 9/19/2006 at 9:56:56 AM. Contact: ###-####. need to reinsp. for soffit fire chalking at lights/ condensate line relocated.
BLD-Energy code compliance9/18/20069/20/20069/19/2006ACANC
DetailsJim Storey
Scheduled by a contractor via Hello! on 9/18/2006 at 11:25:00 AM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Sep 19 2006 9:59AM.
BLD-Framing/Rough-in9/15/20069/15/20069/15/2006PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 9/15/2006 at 10:53:39 AM. Contact: ###-####.
BLD-Framing/Rough-in9/14/20069/15/20069/14/2006ACANC
DetailsJim Storey
Scheduled by a contractor via Hello! on 9/14/2006 at 2:42:36 PM. Disp set to [CANC] by a contractor via Hello! on Sep 14 2006 5:05PM.
BLD-Other7/26/20067/27/20067/27/2006APASS
DetailsDave Hannah
steve Note; wall stem; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Footing7/26/20067/26/20067/26/2006PPASS
DetailsDave Hannah
steve; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
(F) Reprint permit  7/17/2006  
Issue PAID IN FULL permit  7/14/2006 DONE
Telephone call  7/13/2006 DONE
tlk to wes steele ###-#### that permit and fees are ready to be picked up - will contact travis for refund of pwk06-00179 from previous pwk04-00230 of $190.00
Permit Ready to Issue  7/13/2006 DONE
Plan assigned to (JCM)6/21/2006 7/12/2006 PASS
7/12/2006 10:20:23 JCM - activity updated through activity BLDA022 from case BLD06-01779.
Routing - PLAN CHECK7/10/2006 7/12/2006 PASS
PLANS/APPL TAKEN TO FRONT DESK  7/12/2006 DONE
Print Occupancy Form  7/12/2006 DONE
Print Occupancy Form  7/12/2006 DONE
reprint for cathy mae
Routing - FIRE7/7/2006 7/10/2006 PASS
Attached review comments to plans.
1st review completed  7/10/2006 PASS
Plan Reviewer's activity  7/7/2006 PASS
Reviewed and approved plans as submitted for structural and nonstructural requirements. JCM
Routing - PLAN CHECK7/6/2006 7/7/2006 PASS
John Menard
Routing - PLANNING7/5/2006 7/6/2006 PASS
The applicant is required to construct the gazebo proposed to be located to the southeast of the site with this building.
Routing - PLUMBING6/28/2006 7/5/2006 PASS
per plans and 2003 upc
Routing - Erosion and Sediment6/27/2006 6/28/2006 PASS
ESC plan approved with attached conditions.
Routing - PUBLIC WORKS6/22/2006 6/27/2006 PASS
Routing - PLANNING Land Div6/21/2006 6/22/2006 PASS
parcel is a platted lot.
Plans ACCEPTED BY PLAN TECH  6/21/2006  
Recd Pcfee & Taken To Pln CK  6/21/2006 DONE
Application received  6/20/2006