Permit Information
Permit NumberBLD06-01784
StatusFinaled
Name ANDERSEN CONSTRUCTION CO
Site Address 201 N MAPLE GROVE RD
Project NameMesa Falls
Customer Number 
ePlanReviewNo
Description
(Mesa Falls Office Building - Shell) - To construct a 14,400 sq. ft. one story Type VB fully fire sprinklered office shell building. Work to include all site improvements, paving and landscaping per approved plans, CUP05-00161, DRH05-00423. Fire sprinklers per NFPA 13 as regulated by Boise Fire. Fire sprinklers have been used for building area increase. No occupancy is authorized by this permit. Separate plans and permits are required to finish and occupy each tenant space. Energy envelope done under the shell permit. (mlo)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD10/1/200710/1/20071/3/2008 DONE
DetailsCathy Brown
Second Notice has not been responded to.
Second Notice BLD7/31/20077/31/200710/1/2007 DONE
First Notice has not been responded to.
First Notice7/19/20077/19/20077/31/2007 DONE
DetailsMike Jordan
PubWorks Occupancy Approval7/23/20077/23/20077/23/2007 DONE
BLD-Final7/13/20077/19/20077/19/2007APASS
DetailsMike Jordan
Mike; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
DOC - Permit Finaled7/19/20077/19/20077/19/2007PPASS
DetailsMike Jordan
Letter of compliance issued. Noted all required signatures on sign off sheet.
FIRE-Final Inspection7/18/20077/18/20077/18/2007PPASS
DetailsTroy Cobbley
Life safety passed.
BLD-Final7/18/20077/18/20077/18/2007PCANC
DetailsMike Jordan
mike Phone #: ###-####
BLD-Grading Inspection7/16/20077/18/20077/17/2007ACANC
DetailsMike Jordan
mike - final paving and striping and signage Phone #: ###-####
FIRE-Conference6/19/20076/20/20076/20/2007ADONE
DetailsTroy Cobbley
I met pat and verified that the exposed wood in the combustible concealed spaces on the exterior of the building had been coated with the fire retardant. I found that the large canopy with the sprinkler system installed had no upright protection. Per pat this entire area will be filled with insulation and a re-inspection will be called in.
BLD-Energy code compliance5/22/20075/23/20075/23/2007APASS
DetailsMike Jordan
pat - insulation ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
BLD-Framing/Rough-in5/15/20075/16/20075/16/2007PPASS
DetailsMike Jordan
pat - exterior; Phone #: ###-#### Internet Inspection Request from: Victoria Beall. soffit insul ok. perimeter walls ok to insul.
BLD-Framing/Rough-in5/9/20075/10/20075/10/2007APASS
DetailsMike Jordan
pat; Phone #: ###-#### Internet Inspection Request from: Victoria Beall. ok to insul soffits.
BLD-Footing1/11/20071/16/20071/16/2007APART
DetailsMike Jordan
pat - 1st thing in the AM if possible; Phone #: ###-#### Internet Inspection Request from: Victoria Beall. Reviewed plans and special insp. rtequirements with contractor. Conc. placement cancelled for today due to cold wheather.
BLD-Footing1/11/20071/12/20071/11/2007PCANC
DetailsMike Jordan
pat, note: late afternoon around 4 if possible; Phone #: ###-#### Internet Inspection Request from: Victoria Beall Inspection cancelled from web by: Victoria Beall
BLD-Aging Inspection12/27/200612/27/200612/27/2006 PASS
DetailsMike Jordan
wip
(F) Reprint permit  9/28/2006  
Issue PAID IN FULL permit  9/27/2006 DONE
Telephone call  9/19/2006 DONE
talked to greg ugrin at ###-#### that permit is ready
Telephone call  8/23/2006 DONE
Left phone message for Greg that permit is ready & fees, also need ACHD impact fee letter & GC #///8/23/06 @ 9:35am BAS
Permit Ready to Issue  8/23/2006 DONE
Routing - PLAN CHECK8/22/2006 8/22/2006 PASS
PLANS/APPL TAKEN TO FRONT DESK  8/22/2006 DONE
Inspection Record Card- Bld  8/22/2006 DONE
Routing Off Site - STRUCTURAL8/15/2006 8/22/2006 PASS
Plan assigned to (MLO)6/21/2006 8/22/2006 PASS
8/22/2006 10:27:46 MLO - activity updated through activity BLDA022 from case BLD06-01784.
Case Summary (BLD)  8/21/2006  
Routing - PLAN CHECK8/9/2006 8/14/2006 PEND
Pending approval by structural (note: these plans are combined with tenant improvement plans BLD06-01785 so must be issued together.)
Plan resubmittals received  8/14/2006  
Received 1 copy of cover transmittal; 1 letter from Hummel for structural comments, 2 page letter from Lochsa engineering for plan review comments, 3 copies of geotechnical report, 3 copies of additional calcs from lochsa engineering, 3 copies of A2.01, A2.02, A3.01, A3.02, A7.01, A8.01, S0.1, S1.01, S1.02, S5.01, S5.02, M1.1, M4.1, E2.01, E2.02 and taken to Marlene
Routing - PUBLIC WORKS8/8/2006 8/9/2006 PASS
Routing - PLUMBING8/9/2006 8/9/2006 PASS
per plans and 2003 upc
Routing - PLAN CHECK8/7/2006 8/8/2006 PEND
Plan resubmittals received  8/8/2006  
Received transmittal sheet and 3 copies of pg. C3.01; taken to Marlene Southard
Routing - FIRE8/1/2006 8/7/2006 PASS
Attached review comments to plans.
1st review completed  8/7/2006 FAIL
Failed Public Works & Planning.
Routing - PLAN CHECK7/6/2006 8/1/2006 PEND
Plan review approved. Pending further approvals from other divisions and structural prior to issurance. (mys)
Routing Off Site - STRUCTURAL6/21/2006 7/12/2006 FAIL
Called Action Couriers for pick up.

7/12/2006 Fax sent to architect with structural review required corrections. pep
Routing - PLANNING7/5/2006 7/6/2006 PASS
Cody R. DRH05-00423

Cody R. CUP05-00161
Routing - PLUMBING6/27/2006 7/5/2006 FAIL
complete public works review prior to plumbing review.
Plan resubmittals received  6/27/2006  
Received 2 copies of Geotechnical Engineering report and taken to add to plans///6/26/06 BAS
Routing - Erosion and Sediment6/27/2006 6/27/2006 PASS
ESC plan approved with attached conditions.
Routing - PUBLIC WORKS6/22/2006 6/27/2006 FAIL
Revised sanitary sewer to use two (2) six (6) inch services. Contact Jim Pardy ###-####
Routing - PLANNING Land Div6/21/2006 6/22/2006 PASS
parcel created by a Record of Survey.
Application received  6/21/2006  
Plans ACCEPTED BY PLAN TECH  6/21/2006  
Plan routing begun/NEW & ADDTN  6/21/2006