Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD06-01785
StatusFinaled
Name ANDERSEN CONSTRUCTION CO
Site Address 201 N MAPLE GROVE RD
Project NameMesa Falls Bldg
Customer Number 
ePlanReviewNo
Description
(Lochsa Engineering - Mesa Falls Bldg) To construct a new 7, 348 sq.ft. office tenant space with mens and womens restrooms and one unisex restroom. Work to include new non bearing partitions, suspended ceilings, interior finish and built in cabinets per approved plans and attachments. Fire sprinklered for area increase. Installation of fire sprinklers per NFPA 13 as regulated by Boise Fire. DRH05-00423, CUP05-00161.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD10/1/200710/1/20071/3/2008 DONE
DetailsCathy Brown
Second Notice has not been responded to.
Second Notice BLD7/31/20077/31/200710/1/2007 DONE
First Notice has not been responded to.
First Notice 7/20/20077/31/2007 DONE
BLD-Final7/19/20077/20/20077/20/2007APASS
DetailsMike Jordan
pat; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang. Ok for perm occ. All issues resolved.
Permanent occupancy  7/20/2007 DONE
BLD-Final7/13/20077/19/20077/19/2007APART
DetailsMike Jordan
Mike; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt. Ok for temp occ. Needs to lower lav to meete ada requirements, and complete some fire caulking in riser and elec. rooms.
FIRE-Final Inspection7/18/20077/18/20077/18/2007PPASS
DetailsTroy Cobbley
Life safety pass
BLD-Final7/18/20077/18/20077/18/2007PCANC
DetailsMike Jordan
mike Phone #: ###-####
Code Occupancy Approval7/17/20077/17/20077/17/2007APASS
DetailsScott M.Brown
looks good final signed off
BLD-Framing/Rough-in7/16/20077/16/20077/16/2007PPASS
DetailsMike Jordan
pat - ceiling grid Phone #: ###-####
BLD-Framing/Rough-in5/17/20075/18/20075/18/2007APASS
DetailsMike Jordan
pat; Phone #: ###-#### Internet Inspection Request from: Victoria Beall. Interior walls.
BLD-Framing/Rough-in5/9/20075/10/20075/10/2007APART
DetailsMike Jordan
pat; Phone #: ###-#### Internet Inspection Request from: Victoria Beall. ok to rock hard lids in restrooms.
BLD-Framing/Rough-in5/7/20075/8/20075/8/2007ANR
DetailsMike Jordan
pat; Phone #: ###-#### Internet Inspection Request from: Victoria Beall. Needs other trades on both ti and shell.
BLD-Other4/13/20074/16/20074/16/2007APASS
DetailsMike Jordan
Pat Sheer wall; Phone #: ###-#### Internet Inspection Request from: Stacie Backu. Exterior shear ok. Reviewed RFI from engineer noting change in fasteners and thickness in OSB. OSB placed horizontal.
BLD-Other4/10/20074/10/20074/10/2007PPART
DetailsMike Jordan
pat - roofing nailing ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. Roof nailing ok. Still installing straps at roof transitrions.
BLD-Aging Inspection12/27/200612/27/200612/27/2006 PASS
DetailsMike Jordan
wip
Issue PAID IN FULL permit  9/27/2006 DONE
Telephone call  9/19/2006 DONE
talked to greg ugrin at ###-#### that permit is ready
Telephone call  8/23/2006  
Left phone message for Greg that permit is ready & fees, also need GC #///8/23/06 @ 9:35am BAS
Permit Ready to Issue  8/23/2006 DONE
PLANS/APPL TAKEN TO FRONT DESK  8/22/2006 DONE
Print Occupancy Form  8/22/2006 DONE
Routing - PLAN CHECK8/15/2006 8/22/2006 PASS
Resubmittal plans received so can now conduct the plan review.
Plan assigned to (MLO)6/21/2006 8/22/2006 PASS
8/22/2006 10:27:46 MLO - activity updated through activity BLDA022 from case BLD06-01784.
Plan resubmittals received  8/14/2006  
Received 1 copy of cover transmittal; 1 letter from Hummel for structural comments, 2 page letter from Lochsa engineering for plan review comments, 3 copies of geotechnical report, 3 copies of additional calcs from lochsa engineering, 3 copies of A2.01, A2.02, A3.01, A3.02, A7.01, A8.01, S0.1, S1.01, S1.02, S5.01, S5.02, M1.1, M4.1, E2.01, E2.02 and taken to Marlene
Routing - PLUMBING8/9/2006 8/9/2006 PASS
Routing - PUBLIC WORKS8/8/2006 8/9/2006 PASS
Routing - PLUMBING  8/9/2006 PASS
per plans and 2003 upc
Routing - FIRE8/1/2006 8/7/2006 PASS
Attached review comments to plans.
1st review completed  8/7/2006 FAIL
Failed planning, plumbing & plan check.
Routing - PLAN CHECK8/7/2006 8/7/2006 HOLD
8/7/06 - On hold waiting for resubmittals.
Routing - PLAN CHECK7/6/2006 8/1/2006 FAIL
IBC review failed. Faxed corrections to architect. Continued routing. Note: This T.I. plan is routing with shell permit set x refer BLD06-01784. (mys)
Routing - PLUMBING7/5/2006 7/5/2006 FAIL
complete public works review prior to plumbing review on T.I.
Plan resubmittals received  6/27/2006  
Received 2 copies of Geotechnical Engineering report and taken to add to plans///6/26/06 BAS
Routing - PUBLIC WORKS6/22/2006 6/27/2006 FAIL
Revised sanitary sewer to use two (2) six (6) inch services. Contact Jim Pardy ###-####
Plans ACCEPTED BY PLAN TECH  6/21/2006  
Recd Pcfee & Taken To Pln CK  6/21/2006  
Application received  6/21/2006