Third Notice BLD | 10/1/2007 | 10/1/2007 | 1/3/2008 | | DONE |
Cathy Brown
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 7/31/2007 | 7/31/2007 | 10/1/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 7/20/2007 | 7/31/2007 | | DONE |
|
|
|
|
BLD-Final | 7/19/2007 | 7/20/2007 | 7/20/2007 | A | PASS |
Mike Jordan
|
|
|
pat; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang. Ok for perm occ. All issues resolved.
|
Permanent occupancy | | | 7/20/2007 | | DONE |
|
|
|
|
BLD-Final | 7/13/2007 | 7/19/2007 | 7/19/2007 | A | PART |
Mike Jordan
|
|
|
Mike; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt. Ok for temp occ. Needs to lower lav to meete ada requirements, and complete some fire caulking in riser and elec. rooms.
|
FIRE-Final Inspection | 7/18/2007 | 7/18/2007 | 7/18/2007 | P | PASS |
Troy Cobbley
|
|
|
Life safety pass
|
BLD-Final | 7/18/2007 | 7/18/2007 | 7/18/2007 | P | CANC |
Mike Jordan
|
|
|
mike Phone #: ###-####
|
Code Occupancy Approval | 7/17/2007 | 7/17/2007 | 7/17/2007 | A | PASS |
Scott M.Brown
|
|
|
looks good final signed off
|
BLD-Framing/Rough-in | 7/16/2007 | 7/16/2007 | 7/16/2007 | P | PASS |
Mike Jordan
|
|
|
pat - ceiling grid Phone #: ###-####
|
BLD-Framing/Rough-in | 5/17/2007 | 5/18/2007 | 5/18/2007 | A | PASS |
Mike Jordan
|
|
|
pat; Phone #: ###-#### Internet Inspection Request from: Victoria Beall. Interior walls.
|
BLD-Framing/Rough-in | 5/9/2007 | 5/10/2007 | 5/10/2007 | A | PART |
Mike Jordan
|
|
|
pat; Phone #: ###-#### Internet Inspection Request from: Victoria Beall. ok to rock hard lids in restrooms.
|
BLD-Framing/Rough-in | 5/7/2007 | 5/8/2007 | 5/8/2007 | A | NR |
Mike Jordan
|
|
|
pat; Phone #: ###-#### Internet Inspection Request from: Victoria Beall. Needs other trades on both ti and shell.
|
BLD-Other | 4/13/2007 | 4/16/2007 | 4/16/2007 | A | PASS |
Mike Jordan
|
|
|
Pat Sheer wall; Phone #: ###-#### Internet Inspection Request from: Stacie Backu. Exterior shear ok. Reviewed RFI from engineer noting change in fasteners and thickness in OSB. OSB placed horizontal.
|
BLD-Other | 4/10/2007 | 4/10/2007 | 4/10/2007 | P | PART |
Mike Jordan
|
|
|
pat - roofing nailing ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. Roof nailing ok. Still installing straps at roof transitrions.
|
BLD-Aging Inspection | 12/27/2006 | 12/27/2006 | 12/27/2006 | | PASS |
Mike Jordan
|
|
|
wip
|
Issue PAID IN FULL permit | | | 9/27/2006 | | DONE |
|
|
|
|
Telephone call | | | 9/19/2006 | | DONE |
|
|
|
talked to greg ugrin at ###-#### that permit is ready
|
Telephone call | | | 8/23/2006 | | |
|
|
|
Left phone message for Greg that permit is ready & fees, also need GC #///8/23/06 @ 9:35am BAS
|
Permit Ready to Issue | | | 8/23/2006 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/22/2006 | | DONE |
|
|
|
|
Print Occupancy Form | | | 8/22/2006 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 8/15/2006 | | 8/22/2006 | | PASS |
|
|
|
Resubmittal plans received so can now conduct the plan review.
|
Plan assigned to (MLO) | 6/21/2006 | | 8/22/2006 | | PASS |
|
|
|
8/22/2006 10:27:46 MLO - activity updated through activity BLDA022 from case BLD06-01784.
|
Plan resubmittals received | | | 8/14/2006 | | |
|
|
|
Received 1 copy of cover transmittal; 1 letter from Hummel for structural comments, 2 page letter from Lochsa engineering for plan review comments, 3 copies of geotechnical report, 3 copies of additional calcs from lochsa engineering, 3 copies of A2.01, A2.02, A3.01, A3.02, A7.01, A8.01, S0.1, S1.01, S1.02, S5.01, S5.02, M1.1, M4.1, E2.01, E2.02 and taken to Marlene
|
Routing - PLUMBING | 8/9/2006 | | 8/9/2006 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 8/8/2006 | | 8/9/2006 | | PASS |
|
|
|
|
Routing - PLUMBING | | | 8/9/2006 | | PASS |
|
|
|
per plans and 2003 upc
|
Routing - FIRE | 8/1/2006 | | 8/7/2006 | | PASS |
|
|
|
Attached review comments to plans.
|
1st review completed | | | 8/7/2006 | | FAIL |
|
|
|
Failed planning, plumbing & plan check.
|
Routing - PLAN CHECK | 8/7/2006 | | 8/7/2006 | | HOLD |
|
|
|
8/7/06 - On hold waiting for resubmittals.
|
Routing - PLAN CHECK | 7/6/2006 | | 8/1/2006 | | FAIL |
|
|
|
IBC review failed. Faxed corrections to architect. Continued routing. Note: This T.I. plan is routing with shell permit set x refer BLD06-01784. (mys)
|
Routing - PLUMBING | 7/5/2006 | | 7/5/2006 | | FAIL |
|
|
|
complete public works review prior to plumbing review on T.I.
|
Plan resubmittals received | | | 6/27/2006 | | |
|
|
|
Received 2 copies of Geotechnical Engineering report and taken to add to plans///6/26/06 BAS
|
Routing - PUBLIC WORKS | 6/22/2006 | | 6/27/2006 | | FAIL |
|
|
|
Revised sanitary sewer to use two (2) six (6) inch services. Contact Jim Pardy ###-####
|
Plans ACCEPTED BY PLAN TECH | | | 6/21/2006 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/21/2006 | | |
|
|
|
|
Application received | | | 6/21/2006 | | |
|
|
|
|