Third Notice BLD | 7/18/2007 | 7/18/2007 | 7/23/2007 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 6/21/2007 | 6/21/2007 | 7/18/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | 5/23/2007 | 5/23/2007 | 6/21/2007 | | DONE |
Jim Sly
|
|
|
|
BLD-Final | 5/22/2007 | 5/23/2007 | 5/23/2007 | A | PASS |
Jim Sly
|
|
|
rod Note: call 45 min ahead before inspections ; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
DOC - Permit Finaled | 5/23/2007 | 5/23/2007 | 5/23/2007 | P | PASS |
Jim Sly
|
|
|
|
Code Occupancy Approval | 5/18/2007 | 5/18/2007 | 5/18/2007 | P | PASS |
Carol Montgomery
|
|
|
Signed hard card. There are concrete bumpers/wheel restraints piled in the front yard - they will be put back in place as soon as asphalt sets (gets under 80-90 degees). The dumpser area will be cleaned up so misc. concrete debris and etc. is removed.
|
BLD-Final | 5/17/2007 | 5/17/2007 | 5/17/2007 | P | NR |
Jim Sly
|
|
|
rod - pls call 45 min prior to; Phone #: ###-#### Internet Inspection Request from: Victoria Beall Need Code Enforce....
|
FIRE-Final Inspection | 5/16/2007 | 5/16/2007 | 5/16/2007 | P | PASS |
Forrest France
|
|
|
Inspection passed.
|
BLD-Final | 4/30/2007 | 5/1/2007 | 5/1/2007 | A | NR |
Jim Sly
|
|
|
Rod call 30 min before he is coming from Kuna. Rod needs to let you in; Phone #: ###-#### Internet Inspection Request from: Andrea Whiteman
|
BLD-Framing/Rough-in | 3/28/2007 | 3/28/2007 | 3/28/2007 | P | PASS |
Jim Sly
|
|
|
rod ###-#### also need fire wall inspected ..........5/8 firecode installed at exterior. OK
|
BLD-Foundation | 3/5/2007 | 3/5/2007 | 3/5/2007 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 3/5/2007 at 6:45:01 AM. Contact: ###-####.
|
BLD-Footing | 3/2/2007 | 3/2/2007 | 3/2/2007 | A | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 3/2/2007 at 5:54:30 AM. Contact: ###-####. wip.
|
BLD-Foundation | 2/26/2007 | 2/26/2007 | 2/26/2007 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 2/26/2007 at 6:22:07 AM. South and West (2) garage found walls appear OK
|
BLD-Footing | 2/23/2007 | 2/23/2007 | 2/23/2007 | P | PART |
Jim Sly
|
|
|
dane; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
Issue PAID IN FULL permit | | | 12/5/2006 | | |
|
|
|
|
Inspection Record Card- Bld | | | 11/7/2006 | | DONE |
|
|
|
|
Telephone call | | | 11/7/2006 | | DONE |
|
|
|
lft vm with dave jones ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 11/7/2006 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 11/2/2006 | | 11/6/2006 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/6/2006 | | DONE |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 11/6/2006 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 11/6/2006 | | DONE |
|
|
|
|
Plan assigned to (M_P) | 6/22/2006 | | 11/6/2006 | | PASS |
|
|
|
11/6/2006 10:09:17 M_P - activity updated through activity BLDA022 from case BLD06-01790.
|
Routing - FIRE | 10/31/2006 | | 11/2/2006 | | PASS |
|
|
|
Attached updated review comments to plans.
|
Case Summary (BLD) | | | 10/31/2006 | | |
|
|
|
|
Routing - PLAN CHECK | 9/11/2006 | | 10/31/2006 | | PEND |
|
|
|
Waiting for others to approve prior to issuing permit.
|
Plan resubmittals received | | | 10/30/2006 | | |
|
|
|
Received 3 copies of the following sheets--Site & grading plan, foundation & floor framing plan 1 of 4, main level floor plan sheet 2 of 4, exterior elevations sheet 3 of 4, lower & upper framing plan sheet 4 of 4 and taken to Mike Phillips
|
Routing - FIRE | 9/7/2006 | | 9/11/2006 | | PASS |
|
|
|
Attached review comments to plans.
|
Routing - PLAN CHECK | 9/6/2006 | | 9/7/2006 | | |
|
|
|
Routing to fire.
|
Plan resubmittals received | | | 9/7/2006 | | DONE |
|
|
|
Received via fax 1 transmittal,1 transmission,1 united water sheet,1 site lay out taken to Mike P.
|
Routing - FIRE | 9/5/2006 | | 9/6/2006 | | FAIL |
|
|
|
Faxed fire flow documentation request to architect. Attached review comments to plans.
|
1st review completed | | | 9/6/2006 | | FAIL |
|
|
|
Failed Plan Check & Fire.
|
Routing - PLAN CHECK | 7/14/2006 | | 9/5/2006 | | FAIL |
|
|
|
Sent submittal letter to applicant, requesting additional information to be submitted prior to my review.
|
Case Summary (BLD) | | | 9/5/2006 | | |
|
|
|
|
Plan resubmittals received | | | 8/17/2006 | | DONE |
|
|
|
Received 1 memo , 2 calcs, & 2 copys of sheets 1,2,3,4 taken to Mike P
|
Plan resubmittals received | | | 7/14/2006 | | |
|
|
|
Received 1 copy of registered design professional in Responsible charge form and 1 copy of storm water letter from Briggs Engineering and taken to Mike Phillips
|
Routing - PUBLIC WORKS | 7/14/2006 | | 7/14/2006 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 6/27/2006 | | 7/14/2006 | | |
|
|
|
Routed to P.W.
|
Routing - PLANNING | 6/26/2006 | | 6/27/2006 | | PASS |
|
|
|
CAA06-00096 & CAA06-00121- Carl Miller
Move dumpster per Public Works guidelines.
|
Routing - Erosion and Sediment | 6/22/2006 | | 6/26/2006 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PUBLIC WORKS | 6/22/2006 | | 6/23/2006 | | FAIL |
|
|
|
No stormwater system shown on plans. Contact Brian Murphy ###-####
|
Routing - PLANNING Land Div | 6/22/2006 | | 6/22/2006 | | PASS |
|
|
|
parcel existing prior to being annexed into the City and has not changed after its annexation.
|
Plans ACCEPTED BY PLAN TECH | | | 6/22/2006 | | |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 6/22/2006 | | |
|
|
|
|
Application received | | | 6/21/2006 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/21/2006 | | |
|
|
|
|