Permit Information
Permit NumberBLD06-01803
StatusFinaled
Name RA SCHULTZ AND COMPANY
Site Address 1001 S ORCHARD ST
Project NameAgape Christian Worship Ctr
Customer Number 
ePlanReviewNo
Description
(RA Schultz & Co. RCE-2439) (AGAPE CHRISTIAN WORSHIP CENTER) This building is required to be fire sprinklered for area increase. To convert an existing 15,158 square foot office building to a church. The assembly room will have a floor area of about 3,626 square feet and an occupant load of 281. The occupant load is limited by fixed seats. Work is to include interior nonbearing walls, interior doors, interior windows, and a platform. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. CUP06-00044 **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD4/9/20074/9/20074/20/2007 DONE
Second Notice has not been responded to.
Second Notice BLD3/30/20073/30/20074/9/2007 DONE
First Notice has not been responded to.
First Notice 3/14/20073/30/2007 DONE
BLD-Final3/13/20073/14/20073/14/2007APASS
DetailsTom Arcoraci
John; Phone #: ###-#### Internet Inspection Request from: Stacie Backus
Permanent occupancy  3/14/2007 DONE
Perm. Occ. Cert. # 11480 issued 3-14-07 to the Agape Christian Worship Center.
BLD-Wall cover3/13/20073/14/20073/13/2007ACANC
DetailsTom Arcoraci
see jack
Code Occupancy Approval3/13/20073/13/20073/13/2007PPASS
DetailsDena Gambrel
3-13-07 Site inspection shows that the sprinkler lines have been repaired and the grass has been reseeded. Final Occupancy signed.
BLD-Final3/13/20073/13/20073/13/2007PCANC
DetailsTom Arcoraci
john; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles per John hardy
Permanent Occupancy 3/13/20073/13/2007 DONE
Details
BLD-Conference3/8/20073/8/20073/8/2007APART
DetailsTom Arcoraci
seats
BLD-Conference3/7/20073/7/20073/7/2007PPASS
DetailsTom Arcoraci
john; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
Plan Reviewer's activity  3/7/2007 PASS
Approved revised drawings with 'red lines' and attachment.
Telephone call  3/7/2007 DONE
called tansha at ###-#### that permit is ready
Code Occupancy Approval3/5/20073/5/20073/5/2007APASS
DetailsDena Gambrel
3-5-07 TEMPORARY Occupany only. Need to fix cut sprinkler system in southeast corner of building and reseed with grass.
Plan resubmittals received  3/5/2007 DONE
received 3 copys of sheet A1.0 taken to Carl W. this permit was issued 8-8-06
BLD-Framing/Rough-in3/2/20073/2/20073/2/2007PFAIL
DetailsTom Arcoraci
john; Phone #: ###-#### Internet Inspection Request from: Victoria Beall cn issued
FIRE-Final Inspection3/1/20073/2/20073/2/2007APASS
DetailsTroy Cobbley
life safety finaled
FIRE-Final Inspection2/27/20072/28/20072/28/2007PFAIL
DetailsTroy Cobbley
No inspection performed. Need fire alarm permit to be finaled first. The fire alarm permit failed today.
FIRE-Alarm Testing2/20/20072/20/20072/20/2007PCANC
DetailsTroy Cobbley
Duplicate inspection
FIRE-Final Inspection2/16/20072/20/20072/20/2007ACANC
DetailsTroy Cobbley
I notified the contractor that I would not perform the life safety inspection until both the fire alarm and fire sprinkler permits had been finaled.
BLD - Request for Extension2/5/20072/6/20072/6/2007 PASS
DetailsTom Arcoraci
John ###-####
Print Occupancy Form  2/5/2007 DONE
BLD-Aging Inspection1/12/20071/12/20071/12/2007 NR
DetailsTom Arcoraci
exp 2-07
BLD-Aging Inspection11/7/200611/7/200611/7/2006 PASS
DetailsTom Arcoraci
(F) Reprint permit  8/9/2006  
Issue PAID IN FULL permit  8/8/2006 DONE
(F) Reprint permit  8/8/2006  
Print Occupancy Form  8/7/2006 DONE
Permit Ready to Issue  8/7/2006 DONE
Telephone call  8/7/2006 DONE
called ###-#### and told Xaviery that permit is ready and fee and need ACHD, came in and paid for Bld but waiting on ACHD fees to be paid to issue permit
Routing - PLAN CHECK7/13/2006 8/4/2006 PASS
Drawings approved after resubmittal review
Routing - FIRE8/4/2006 8/4/2006 PASS
Attached updated review comments to plans.
Routing - PLAN CHECK8/4/2006 8/4/2006  
PLANS/APPL TAKEN TO FRONT DESK  8/4/2006 DONE
Plan assigned to (CJW)6/27/2006 8/4/2006 PASS
8/4/2006 14:33:34 CJW - activity updated through activity BLDA022 from case BLD06-01803.
Plan resubmittals received  8/3/2006  
Received 2 copies of 1pg. response letter, 3 copies of pages A0.0 & A1.0; taken to Carl Westfall
Routing - FIRE7/11/2006 7/13/2006 FAIL
Faxed resubmittal items to architect. Attached review comments to plans.
1st review completed  7/13/2006 FAIL
Failed Plan Check and Fire.
Routing - PLAN CHECK6/28/2006 7/11/2006 FAIL
The IBC plan review was started on July 10, 2006 and was finished the next day. Revised drawings were required. See the plan review report.
Routing - PLANNING6/28/2006 6/28/2006 PASS
Carl Miller CUP06-00044
Routing - PUBLIC WORKS6/27/2006 6/28/2006 PASS
Recd Pcfee & Taken To Pln CK  6/23/2006 DONE
Plans ACCEPTED BY PLAN TECH  6/23/2006  
Application received  6/22/2006