Case Summary (BLD) | | | 7/28/2008 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 4/2/2008 | | |
|
|
|
|
Second Notice BLD | 4/18/2007 | 4/18/2007 | 4/30/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | 4/2/2007 | 4/2/2007 | 4/18/2007 | | DONE |
Mike Jordan
|
|
|
|
BLD-Final | 4/2/2007 | 4/2/2007 | 4/2/2007 | P | PASS |
Mike Jordan
|
|
|
clint; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
|
DOC - Permit Finaled | 4/2/2007 | 4/2/2007 | 4/2/2007 | P | PASS |
Mike Jordan
|
|
|
letter of compliance issued. Final ok.
|
Code Occupancy Approval | 4/2/2007 | 4/2/2007 | 4/2/2007 | P | CANC |
Scott M.Brown
|
|
|
ALL IN AS REQUIRED FINAL OK
|
BLD-Final | 3/29/2007 | 3/30/2007 | 3/30/2007 | A | NR |
Mike Jordan
|
|
|
clint; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
|
FIRE-Final Inspection | 3/23/2007 | 3/26/2007 | 3/26/2007 | A | CANC |
Troy Cobbley
|
|
|
life safety passed.
|
BLD-Other | 3/6/2007 | 3/6/2007 | 3/6/2007 | P | CANC |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 3/6/2007 at 8:47:02 AM. Contact: ###-####. Draftstop installed under eve to soffit.
|
BLD-Framing/Rough-in | 2/20/2007 | 2/21/2007 | 2/21/2007 | A | CANC |
Mike Jordan
|
|
|
greg; Phone #: ###-#### Internet Inspection Request from: Victoria Beall. 2x8 scab added to girder trusses as per engineering.
|
BLD-Framing/Rough-in | 2/19/2007 | 2/20/2007 | 2/20/2007 | A | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 2/19/2007 at 9:04:40 AM. Contact: ###-####. Draft stop installed, Needs to extend to soffit.
|
BLD-Framing/Rough-in | 2/16/2007 | 2/16/2007 | 2/16/2007 | P | PART |
Mike Jordan
|
|
|
greg ; Phone #: ###-#### Internet Inspection Request from: Patricia Smit. Will call back to inspect draft stop.
|
BLD-Foundation | 9/15/2006 | 9/15/2006 | 9/15/2006 | P | PASS |
Mike Jordan
|
|
|
Note: rebar - pouring concrete at 2:00 pm; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Perimeter stemwalls.
|
BLD-Footing | 9/12/2006 | 9/13/2006 | 9/13/2006 | A | PART |
Mike Jordan
|
|
|
Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. wip. Needs to add additional verts at L1 openings at 16 inch jambs.
|
(F) Reprint permit | | | 8/24/2006 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 8/23/2006 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/8/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/8/2006 | | DONE |
|
|
|
|
Telephone call | | | 8/8/2006 | | DONE |
|
|
|
left mess for matt rhees at ###-#### permit is ready & need achd
|
Plan Reviewer's activity | | | 8/7/2006 | | PASS |
|
|
|
Reviewed and approved revised structural calculations and drawings. JCM
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/7/2006 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 7/25/2006 | | 8/7/2006 | | PASS |
|
|
|
|
Plan assigned to (JCM) | 6/26/2006 | | 8/7/2006 | | PASS |
|
|
|
8/7/2006 11:50:44 JCM - activity updated through activity BLDA022 from case BLD06-01817.
|
Plan resubmittals received | | | 8/3/2006 | | |
|
|
|
Received transmittal cover, 2pg. transmittal letter, 3 copies of Supplemental Calculations, 3 copes of pages S4.0 & S5.0; taken to John Menard
|
1st review completed | | | 7/25/2006 | | FAIL |
|
|
|
Failed plan check and planning.
|
Routing - FIRE | 7/21/2006 | | 7/25/2006 | | PASS |
|
|
|
Attached review comments to plans.
|
Routing - PLAN CHECK | 7/19/2006 | | 7/21/2006 | | PASS |
|
|
|
|
Routing - PLANNING | 7/17/2006 | | 7/19/2006 | | PASS |
|
|
|
Meets ordinance standards for required landscaping. Accessible spaces must comply with ADA requirements.
|
Routing - PLAN CHECK | 7/7/2006 | | 7/17/2006 | | |
|
|
|
John M
|
Plan resubmittals requested | | | 7/11/2006 | | DONE |
|
|
|
Faxed the architect a copy of the comment list from the consulting structural engineer requesting revisions. JCM
|
Routing Off Site - STRUCTURAL | 6/27/2006 | | 7/10/2006 | | FAIL |
|
|
|
Received letter from consulting structural engineer requesting revisions. JCM
|
Routing - PLANNING | 7/6/2006 | | 7/7/2006 | | FAIL |
|
|
|
The applicant has not complied with the requirements of DRH06-00144. The applicant will be required to submit a revised site plan incorporating the conditions of approval and will be required to submit a landscape plan to be reviewed and approved by DR staff.
|
Routing - PLUMBING | 6/30/2006 | | 7/6/2006 | | PASS |
|
|
|
per plans and 2003 upc
|
Routing - PUBLIC WORKS | 6/27/2006 | | 6/30/2006 | | PASS |
|
|
|
|
Routing - Erosion and Sediment | 6/30/2006 | | 6/30/2006 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - Addressing | 6/28/2006 | | 6/28/2006 | | PASS |
|
|
|
|
Routing - PLANNING Land Div | 6/27/2006 | | 6/27/2006 | | PASS |
|
|
|
parcel is a platted lot.
|
Recd Pcfee & Taken To Pln CK | | | 6/27/2006 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/27/2006 | | |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 6/27/2006 | | |
|
|
|
|
Application received | | | 6/23/2006 | | |
|
|
|
|