Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD06-01817
StatusFinaled
Name PETRA INC
Site Address 2762 S FEATHERLY WAY
Project NameSheffield Building #1-Shell
Customer Number 
ePlanReviewNo
Description
(Sheffield Building #1 - Shell Only) To build a new 7,150 square foot, one story office warehouse shell building and related site improvements. This building is constructed of concrete slab floors, concrete masonry exterior walls and wood trussed roof system. this is a shell permit only and no occupancy is allowed under this permit. Separate tenant improvement permits will be required to finish this building for occupancy. All construction per the approved plans. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  7/28/2008 DONE
Case Summary (BLD)  4/2/2008  
Second Notice BLD4/18/20074/18/20074/30/2007 DONE
First Notice has not been responded to.
First Notice4/2/20074/2/20074/18/2007 DONE
DetailsMike Jordan
BLD-Final4/2/20074/2/20074/2/2007PPASS
DetailsMike Jordan
clint; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
DOC - Permit Finaled4/2/20074/2/20074/2/2007PPASS
DetailsMike Jordan

letter of compliance issued. Final ok.
Code Occupancy Approval4/2/20074/2/20074/2/2007PCANC
DetailsScott M.Brown
ALL IN AS REQUIRED FINAL OK
BLD-Final3/29/20073/30/20073/30/2007ANR
DetailsMike Jordan
clint; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
FIRE-Final Inspection3/23/20073/26/20073/26/2007ACANC
DetailsTroy Cobbley
life safety passed.
BLD-Other3/6/20073/6/20073/6/2007PCANC
DetailsMike Jordan
Scheduled by a contractor via Hello! on 3/6/2007 at 8:47:02 AM. Contact: ###-####. Draftstop installed under eve to soffit.
BLD-Framing/Rough-in2/20/20072/21/20072/21/2007ACANC
DetailsMike Jordan
greg; Phone #: ###-#### Internet Inspection Request from: Victoria Beall. 2x8 scab added to girder trusses as per engineering.
BLD-Framing/Rough-in2/19/20072/20/20072/20/2007APASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 2/19/2007 at 9:04:40 AM. Contact: ###-####. Draft stop installed, Needs to extend to soffit.
BLD-Framing/Rough-in2/16/20072/16/20072/16/2007PPART
DetailsMike Jordan
greg ; Phone #: ###-#### Internet Inspection Request from: Patricia Smit. Will call back to inspect draft stop.
BLD-Foundation9/15/20069/15/20069/15/2006PPASS
DetailsMike Jordan
Note: rebar - pouring concrete at 2:00 pm; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Perimeter stemwalls.
BLD-Footing9/12/20069/13/20069/13/2006APART
DetailsMike Jordan
Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. wip. Needs to add additional verts at L1 openings at 16 inch jambs.
(F) Reprint permit  8/24/2006  
Issue PAID IN FULL permit  8/23/2006 DONE
Inspection Record Card- Bld  8/8/2006 DONE
Permit Ready to Issue  8/8/2006 DONE
Telephone call  8/8/2006 DONE
left mess for matt rhees at ###-#### permit is ready & need achd
Plan Reviewer's activity  8/7/2006 PASS
Reviewed and approved revised structural calculations and drawings. JCM
PLANS/APPL TAKEN TO FRONT DESK  8/7/2006 DONE
Routing - PLAN CHECK7/25/2006 8/7/2006 PASS
Plan assigned to (JCM)6/26/2006 8/7/2006 PASS
8/7/2006 11:50:44 JCM - activity updated through activity BLDA022 from case BLD06-01817.
Plan resubmittals received  8/3/2006  
Received transmittal cover, 2pg. transmittal letter, 3 copies of Supplemental Calculations, 3 copes of pages S4.0 & S5.0; taken to John Menard
1st review completed  7/25/2006 FAIL
Failed plan check and planning.
Routing - FIRE7/21/2006 7/25/2006 PASS
Attached review comments to plans.
Routing - PLAN CHECK7/19/2006 7/21/2006 PASS
Routing - PLANNING7/17/2006 7/19/2006 PASS
Meets ordinance standards for required landscaping. Accessible spaces must comply with ADA requirements.
Routing - PLAN CHECK7/7/2006 7/17/2006  
John M
Plan resubmittals requested  7/11/2006 DONE
Faxed the architect a copy of the comment list from the consulting structural engineer requesting revisions. JCM
Routing Off Site - STRUCTURAL6/27/2006 7/10/2006 FAIL
Received letter from consulting structural engineer requesting revisions. JCM
Routing - PLANNING7/6/2006 7/7/2006 FAIL
The applicant has not complied with the requirements of DRH06-00144. The applicant will be required to submit a revised site plan incorporating the conditions of approval and will be required to submit a landscape plan to be reviewed and approved by DR staff.
Routing - PLUMBING6/30/2006 7/6/2006 PASS
per plans and 2003 upc
Routing - PUBLIC WORKS6/27/2006 6/30/2006 PASS
Routing - Erosion and Sediment6/30/2006 6/30/2006 PASS
ESC plan approved with attached conditions.
Routing - Addressing6/28/2006 6/28/2006 PASS
Routing - PLANNING Land Div6/27/2006 6/27/2006 PASS
parcel is a platted lot.
Recd Pcfee & Taken To Pln CK  6/27/2006 DONE
Plans ACCEPTED BY PLAN TECH  6/27/2006  
Plan routing begun/NEW & ADDTN  6/27/2006  
Application received  6/23/2006