Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD06-01821
StatusFinaled
Name PETRA INC
Site Address 1757 N HAMPTON RD
Project Name 
Customer Number 
ePlanReviewNo
Description
(Leisure Time Inc) To remodel an existing (2) story building, 7,190 sq. ft. on the first floor (new retail) and 2,455 sq. ft. on the second floor (new second exit), a total of 9,645 sq. ft. This is a change of occupancy for the first floor from "B/S1" to "M" for a new retail sales tenant per approved plans. This remodel will include new fire sprinkler system throughout the entire building to allow addition of second story. Work includes selective interior demolition; to change structural support for interior bearing with concrete pads, columns and structural modification of floor joists. To upgrade restrooms for accessiblity compliance and add one new accessible unisex restroom. Construct new walls to create areas for display, offices, break, reception and sales rooms; add second required exit from second floor; modify areas of ceiling finishes; upgrade electrical, mechanical, plumbing systems and install new sprinkler system in all areas of building. Note: A separate application, plans, approval and permit is required for installation of the sprinkler, alarm or rack storage systems. Do not start installation until separate permit is issued. Building cannot be occupied by this tenant until the sprinkler work is complete in conjunction with T.I. remodel and a new Certificate of Occupancy is issued. drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice BLD1/9/20081/9/20083/5/2008 DONE
DetailsCathy Brown
First Notice has not been responded to.
First Notice 12/21/20071/9/2008 DONE
BLD-Final12/20/200712/21/200712/21/2007APASS
DetailsJim Sly
Terry, late a.m. please = ) Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
OK for Perm Occ.
FIRE-Final Inspection12/20/200712/21/200712/21/2007APASS
DetailsForrest France
Corrections verified for compliance, fire life safety passed.
Permanent Occupancy  12/21/2007 DONE
FIRE-Final Inspection12/17/200712/17/200712/17/2007PFAIL
DetailsTroy Cobbley
Turn the hardware around on the interior door with the exit sign above it. Provide exit sign/emergency light above the exit from the existing warehouse area. Provide lever hardware on the other exit door from the existing warehouse.
FIRE-Final Inspection12/5/200712/5/200712/5/2007PFAIL
DetailsTroy Cobbley
Provide indicator and sticker at the main exit. Provide fire extinguishers as discussed. Provide exit sign/emergency light at the warehouse door as discussed. The fire dept. access needs worked out with the new buildings access.
BLD-Conference12/4/200712/4/200712/4/2007PDONE
DetailsJim Sly
terry Note: please call 1/2 hr prior to conference Phone #: ###-####
Re.for final...
FIRE-Conference12/4/200712/4/200712/4/2007PDONE
DetailsTroy Cobbley
I went over life safety requirements with terry.
BLD-Other3/28/20073/29/20073/29/2007ANH
DetailsJim Sly
Josh Fireplace pls call 30 min prior; Phone #: ###-#### Internet Inspection Request from: Stacie Backus
BLD-Framing/Rough-in12/21/200612/22/200612/22/2006PPASS
DetailsJim Sly
Calvin; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
BLD-Wall cover12/18/200612/18/200612/19/2006PPART
DetailsDave Hannah
sheldon ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith still needs mec rough ins and fire sprinkler rough in needs to fire block above fire places had letter from engineer oking post to beam connections
BLD-Conference9/6/20069/7/20069/7/2006ADONE
DetailsJim Sly
jeremy; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
BLD-Conference9/1/20069/5/20069/5/2006AFAIL
DetailsJim Sly
jeremy; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
C/N Non complying stairway, Post Beam connections not per Approved Plan....Not insp by special inspector (welds)
BLD-Footing8/22/20068/23/20068/23/2006PPART
DetailsJim Sly
jeremy; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
Remainder of footing pads appear OK.......Advised for cylinder tests/ special insp......Need 2500 PSI They are mixing a proprietary product in a portable mixer.
Override - Parcel Holds1/1/19001/1/19008/22/2006  
BLD-Foundation8/17/20068/18/20068/18/2006APART
DetailsTony Young
sheldon; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
only the 3 stair ftgs are ok to pour,, the others are not ready,, need to be the size shown on engineering
Plan assigned to (DRS)6/30/2006 8/9/2006 PASS
8/9/2006 08:23:44 DRS - activity updated through activity BLDA022 from case BLD06-01821.
Routing - PLAN CHECK8/8/2006 8/9/2006 PASS
To permit desk to issue.
PLANS/APPL TAKEN TO FRONT DESK  8/9/2006 PASS
Print Occupancy Form  8/9/2006 DONE
Telephone call  8/9/2006 DONE
tlk to tom ###-#### that permit and fees are ready to be picked up but needs GC / RP and RCE # but I gave the call to amy about the erosion fees 11:30am
Permit Ready to Issue  8/9/2006 DONE
Issue PAID IN FULL permit  8/9/2006 DONE
Routing - FIRE8/7/2006 8/8/2006 PASS
Attached updated review comments to plans.
Routing - PLAN CHECK7/27/2006 8/7/2006 PEND
Incerted plan review response sheets from architect into plans. routing to fire code analyst for review.
Plan resubmittals received  8/4/2006  
Received 2 copies of 3pg. response from Cabal Architects, 2 copies of 2pg. response from DC Engineering, 2 copies "Project Start Up for Special Inspetions", 2 sets of Structural Design Calculations, and 3 copies of the following pages: a0.12, a2.11, a2.12, a2.13, a8.11, e1.11, e1.12, e1.21, e2.11, M1.1, M2.0; taken to Dan Stuart
Routing - FIRE7/25/2006 7/27/2006 FAIL
Faxed resubmittal items to architect.
Plan resubmittals received  7/27/2006  
Received Erosion and Sediment Control application and waiver request letter; taken to Dan Stuart
Routing - Erosion and Sediment7/27/2006 7/27/2006 PASS
ESC waiver request approved with attached conditions. RP must be identified before permit is issued.
Additional plans submitted  7/27/2006 DONE
Received ESC application and waiver request for the project. Attached copies to plans at fire code analyst and Scott will route to Steve Webb, ESC.
Routing - PLAN CHECK6/30/2006 7/25/2006 FAIL
Copy of plan review corrections e-mailed and faxed to architect with sample of ESC waiver letter faxed separately. Routing to fire code analyst for review.
Plan resubmittals requested  7/25/2006 DONE
Faxed and e-mailed plan review to architect.
Plan resubmittals received  7/24/2006  
Received 2 copies of Structural Design Calculations; taken to Dan Stuart
Routing - PUBLIC WORKS6/30/2006 6/30/2006 PASS
Application received  6/23/2006  
Recd Pcfee & Taken To Pln CK  6/23/2006 DONE
Plans ACCEPTED BY PLAN TECH  6/23/2006  
1st review completed  5/27/2006 FAIL
Failed plan check & fire.
Third Notice BLD3/5/20083/5/2008   
Second Notice has not been responded to.