Second Notice BLD | 1/9/2008 | 1/9/2008 | 3/5/2008 | | DONE |
Cathy Brown
|
|
|
First Notice has not been responded to.
|
First Notice | | 12/21/2007 | 1/9/2008 | | DONE |
|
|
|
|
BLD-Final | 12/20/2007 | 12/21/2007 | 12/21/2007 | A | PASS |
Jim Sly
|
|
|
Terry, late a.m. please = ) Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt OK for Perm Occ.
|
FIRE-Final Inspection | 12/20/2007 | 12/21/2007 | 12/21/2007 | A | PASS |
Forrest France
|
|
|
Corrections verified for compliance, fire life safety passed.
|
Permanent Occupancy | | | 12/21/2007 | | DONE |
|
|
|
|
FIRE-Final Inspection | 12/17/2007 | 12/17/2007 | 12/17/2007 | P | FAIL |
Troy Cobbley
|
|
|
Turn the hardware around on the interior door with the exit sign above it. Provide exit sign/emergency light above the exit from the existing warehouse area. Provide lever hardware on the other exit door from the existing warehouse.
|
FIRE-Final Inspection | 12/5/2007 | 12/5/2007 | 12/5/2007 | P | FAIL |
Troy Cobbley
|
|
|
Provide indicator and sticker at the main exit. Provide fire extinguishers as discussed. Provide exit sign/emergency light at the warehouse door as discussed. The fire dept. access needs worked out with the new buildings access.
|
BLD-Conference | 12/4/2007 | 12/4/2007 | 12/4/2007 | P | DONE |
Jim Sly
|
|
|
terry Note: please call 1/2 hr prior to conference Phone #: ###-#### Re.for final...
|
FIRE-Conference | 12/4/2007 | 12/4/2007 | 12/4/2007 | P | DONE |
Troy Cobbley
|
|
|
I went over life safety requirements with terry.
|
BLD-Other | 3/28/2007 | 3/29/2007 | 3/29/2007 | A | NH |
Jim Sly
|
|
|
Josh Fireplace pls call 30 min prior; Phone #: ###-#### Internet Inspection Request from: Stacie Backus
|
BLD-Framing/Rough-in | 12/21/2006 | 12/22/2006 | 12/22/2006 | P | PASS |
Jim Sly
|
|
|
Calvin; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
|
BLD-Wall cover | 12/18/2006 | 12/18/2006 | 12/19/2006 | P | PART |
Dave Hannah
|
|
|
sheldon ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith still needs mec rough ins and fire sprinkler rough in needs to fire block above fire places had letter from engineer oking post to beam connections
|
BLD-Conference | 9/6/2006 | 9/7/2006 | 9/7/2006 | A | DONE |
Jim Sly
|
|
|
jeremy; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|
BLD-Conference | 9/1/2006 | 9/5/2006 | 9/5/2006 | A | FAIL |
Jim Sly
|
|
|
jeremy; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley C/N Non complying stairway, Post Beam connections not per Approved Plan....Not insp by special inspector (welds)
|
BLD-Footing | 8/22/2006 | 8/23/2006 | 8/23/2006 | P | PART |
Jim Sly
|
|
|
jeremy; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Remainder of footing pads appear OK.......Advised for cylinder tests/ special insp......Need 2500 PSI They are mixing a proprietary product in a portable mixer.
|
Override - Parcel Holds | 1/1/1900 | 1/1/1900 | 8/22/2006 | | |
|
|
|
|
BLD-Foundation | 8/17/2006 | 8/18/2006 | 8/18/2006 | A | PART |
Tony Young
|
|
|
sheldon; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles only the 3 stair ftgs are ok to pour,, the others are not ready,, need to be the size shown on engineering
|
Plan assigned to (DRS) | 6/30/2006 | | 8/9/2006 | | PASS |
|
|
|
8/9/2006 08:23:44 DRS - activity updated through activity BLDA022 from case BLD06-01821.
|
Routing - PLAN CHECK | 8/8/2006 | | 8/9/2006 | | PASS |
|
|
|
To permit desk to issue.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/9/2006 | | PASS |
|
|
|
|
Print Occupancy Form | | | 8/9/2006 | | DONE |
|
|
|
|
Telephone call | | | 8/9/2006 | | DONE |
|
|
|
tlk to tom ###-#### that permit and fees are ready to be picked up but needs GC / RP and RCE # but I gave the call to amy about the erosion fees 11:30am
|
Permit Ready to Issue | | | 8/9/2006 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 8/9/2006 | | DONE |
|
|
|
|
Routing - FIRE | 8/7/2006 | | 8/8/2006 | | PASS |
|
|
|
Attached updated review comments to plans.
|
Routing - PLAN CHECK | 7/27/2006 | | 8/7/2006 | | PEND |
|
|
|
Incerted plan review response sheets from architect into plans. routing to fire code analyst for review.
|
Plan resubmittals received | | | 8/4/2006 | | |
|
|
|
Received 2 copies of 3pg. response from Cabal Architects, 2 copies of 2pg. response from DC Engineering, 2 copies "Project Start Up for Special Inspetions", 2 sets of Structural Design Calculations, and 3 copies of the following pages: a0.12, a2.11, a2.12, a2.13, a8.11, e1.11, e1.12, e1.21, e2.11, M1.1, M2.0; taken to Dan Stuart
|
Routing - FIRE | 7/25/2006 | | 7/27/2006 | | FAIL |
|
|
|
Faxed resubmittal items to architect.
|
Plan resubmittals received | | | 7/27/2006 | | |
|
|
|
Received Erosion and Sediment Control application and waiver request letter; taken to Dan Stuart
|
Routing - Erosion and Sediment | 7/27/2006 | | 7/27/2006 | | PASS |
|
|
|
ESC waiver request approved with attached conditions. RP must be identified before permit is issued.
|
Additional plans submitted | | | 7/27/2006 | | DONE |
|
|
|
Received ESC application and waiver request for the project. Attached copies to plans at fire code analyst and Scott will route to Steve Webb, ESC.
|
Routing - PLAN CHECK | 6/30/2006 | | 7/25/2006 | | FAIL |
|
|
|
Copy of plan review corrections e-mailed and faxed to architect with sample of ESC waiver letter faxed separately. Routing to fire code analyst for review.
|
Plan resubmittals requested | | | 7/25/2006 | | DONE |
|
|
|
Faxed and e-mailed plan review to architect.
|
Plan resubmittals received | | | 7/24/2006 | | |
|
|
|
Received 2 copies of Structural Design Calculations; taken to Dan Stuart
|
Routing - PUBLIC WORKS | 6/30/2006 | | 6/30/2006 | | PASS |
|
|
|
|
Application received | | | 6/23/2006 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/23/2006 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/23/2006 | | |
|
|
|
|
1st review completed | | | 5/27/2006 | | FAIL |
|
|
|
Failed plan check & fire.
|
Third Notice BLD | 3/5/2008 | 3/5/2008 | | | |
|
|
|
Second Notice has not been responded to.
|